Construction Bench Mark 18m Report
 Engineering  Construction

Construction Bench Mark 18 Months Report: Projects in Design
Report Date: 01-31-2026

Benchmark Baseline data for Forecasted Critical Dates
Date Name Default Days Comments
N M R S
Date of Award 0 0 0 0 Engineering CR date #40
Forecast NTP 70 70 70 70
Forecast Subcomp 400 400 270 270 Use Construction days if available
Forecast Final Comp 45 45 45 45
Forecast Accept Work 70 70 70 70

No. WBS No Project Name Key Map Contract Amount Date of Award Forecast NTP Construction Days Substantial Comp Date Forecast Final Comp Forecast Accept Work
Managing Engineer Project Manager Contractor CM and I Senior Inspector Inspector
1  R-000265-0165-3   Kingwood Central Wastewater Treatment Plant WWTP Improvements -FEMA/CD   337F   $171,666,666.00   10-25-2028(s)   01-03-2029(s)      09-30-2029(s)   11-14-2029(s)   01-23-2030(s)                   
2  S-001000-053A-3   Facilities Improvements at Various Well Sites and Re-Pump Stations - Package 3   409N,408R,408Q,408P,408N,409P,408R,529K,487Z   $12,132,518.01   10-27-2026(s)   01-05-2027(s)      10-02-2027(s)   11-16-2027(s)   01-25-2028(s)                   
3  R-000267-0183-3   Lift Station Hazard Mitigation and Improvement Projects FEMA -CD (Bayou Timber LS, 5th Street LS, Willowick LS, Heights LS, Bayou Place LS, North Macgregor Way #4 LS)   492D,493L,491G,493E,534E,492N   $22,835,000.00   10-27-2027(s)   01-05-2028(s)      10-01-2028(s)   11-15-2028(s)   01-24-2029(s)                   
4  M-410035-001A-3   Northside High School Area - Sanitary Sewer Rehab   493C,493D   $0.00   10-28-2026(s)   01-06-2027(s)      02-10-2028(s)   03-26-2028(s)   06-04-2028(s)   Prakash Luetel                
5  M-410035-0001-3   Northside High School Area Drainage and Paving   493C,493D   $39,814,812.00   10-29-2025(s)   01-07-2026(s)      02-11-2027(s)   03-28-2027(s)   06-06-2027(s)   Prakash Luetel                
6  S-000900-0148-3   Highway 3 Distribution Water Line from Dixie Farm Road to north of West Texas Avenue (aka SETL Contract F)   577X,617B,617C,617G,617H,617M,617R,618N   $5,931,349.06   11-03-2027(s)   01-12-2028(s)   450   04-06-2029(s)   05-21-2029(s)   07-30-2029(s)   Panduranga Kuruva                
7  S-000701-0043-3   Miscellaneous Large Diameter Water Line Improvements - Package 4   490A,490B,493K,493L,493M   $17,513,250.00   11-04-2026(s)   01-13-2027(s)   545   07-11-2028(s)   08-25-2028(s)   11-03-2028(s)   Panduranga Kuruva                
8  S-000701-0049-3   Large Diameter Water Line and Above Grade Crossings - Package 3    414S,415A,454D,454V,488D,488M,495N,496Y,533E,533F,536C   $0.00   11-08-2028(s)   01-17-2029(s)      10-14-2029(s)   11-28-2029(s)   02-06-2030(s)                   
9  R-000267-0174-3   Lift Station Rehabilitation and Reconstruction Design Consent Decree: Ladbrook, Pine Prairie, Stately Oaks, Chestnut Ridge and Magnolia Park   336B,297P,298W,336A,495S   $27,449,090.91   11-11-2026(s)   01-20-2027(s)   720   01-09-2029(s)   02-23-2029(s)   05-04-2029(s)                   
10  R-002011-0096-3   Gravity Sewer Line Adjustment   617C,617D,617G   $4,180,000.00   11-11-2027(s)   01-20-2028(s)   234   09-10-2028(s)   10-25-2028(s)   01-03-2029(s)                   
11  R-000035-0029-3   Force Main Rehabilitation and Reconstruction Projects - Consent Decree (Goodyear Lift Station, Scarsdale Lift Station)   616D,535M   $6,653,000.00   11-15-2027(s)   01-24-2028(s)      10-20-2028(s)   12-04-2028(s)   02-12-2029(s)                   
12  M-410043-0001-3   C106-10 Channel Improvement   576F   $41,359,500.00   11-15-2028(s)   01-24-2029(s)      02-28-2030(s)   04-14-2030(s)   06-23-2030(s)   Prakash Luetel                
13  N-210004-0001-3   Cloverland Area Paving and Drainage Improvements   573L,573M   $23,701,000.00   11-17-2026(s)   01-26-2027(s)      03-01-2028(s)   04-15-2028(s)   06-24-2028(s)   Mohammad Sabzevari                
14  R-000267-0182-3   Lift Station Hazard Mitigation and Improvement Projects FEMA - CD (Old Stone Trail LS, Tanya Circle LS, M.U.D. #175-2 LS, Memorial Dr #5 LS, Fleetwood LS, Addicks LS, Woodway #2 LS)   490R,488B,488E,488F   $32,333,333.33   11-24-2027(s)   02-02-2028(s)      10-29-2028(s)   12-13-2028(s)   02-21-2029(s)                   
15  M-410291-0001-3   Turkey Gully Drainage and Paving   452T,452U   $15,036,211.58   11-25-2026(s)   02-03-2027(s)   400   03-09-2028(s)   04-23-2028(s)   07-02-2028(s)   Prakash Luetel                
16  S-000035-0283-3   Waterline Replacement in Near Northside   453Z,453V   $15,439,000.00   11-25-2026(s)   02-03-2027(s)      10-31-2027(s)   12-15-2027(s)   02-23-2028(s)                   
17  S-000900-0186-3   48-inch Water Line from Forbes Road to Martindale Road along Almeda Genoa   575N,574R,574Q,574P   $13,000,000.00   11-25-2026(s)   02-03-2027(s)   333   01-02-2028(s)   02-16-2028(s)   04-26-2028(s)   Panduranga Kuruva                
18  N-000664-0002-3   Greens Road: John F. Kennedy Boulevard to US 59   374P,374Q,374R,375N   $47,941,000.00   12-02-2026(s)   02-10-2027(s)      03-16-2028(s)   04-30-2028(s)   07-09-2028(s)   Mohammad Sabzevari                
19  R-000267-0173-3   Braeswood N, Post Oak #2, Bissonnet #4, Brooklet, NE Sludge Transfer (Dorsett), and Synott Road #1 Lift Stations Renewal and Replacement Project   532L,611C,530T,529Y,528L,495F   $0.00   12-09-2026(s)   02-17-2027(s)      11-14-2027(s)   12-29-2027(s)   03-08-2028(s)                   
20  S-000701-0038-3   Large Diameter Water Line and Valve Replacement Pkg. 3   495Z,496W,496X,496Y,536A   $14,064,000.00   12-14-2026(s)   02-22-2027(s)      11-19-2027(s)   01-03-2028(s)   03-13-2028(s)   Panduranga Kuruva                
21  R-000267-0187-3   Lift Station Improvement Projects (Consent Decree) (Asbury LS, Ambrose LS, Studemont LS, Ardmore LS, Cottage Grove LS, & Stellalink LS)      $24,937,272.73   12-15-2027(s)   02-23-2028(s)      11-19-2028(s)   01-03-2029(s)   03-14-2029(s)                   
22  M-410006-0002-3   Arlington Heights Area Drainage Improvements Sub Project 2   576C,576G   $14,723,234.00   12-16-2026(s)   02-24-2027(s)      03-30-2028(s)   05-14-2028(s)   07-23-2028(s)   Yusherry Cang                
23  M-430296-0017-3   TIRZ17 Memorial City Area Detention Basin   489D,489H,490A   $58,500,000.00   12-16-2026(s)   02-24-2027(s)   730   02-23-2029(s)   04-09-2029(s)   06-18-2029(s)                   
24  N-100006-0001-3   University Blvd Paving & Drainage Kirby Drive to Greenbriar Drive   532H   $6,122,000.00   12-16-2026(s)   02-24-2027(s)      03-30-2028(s)   05-14-2028(s)   07-23-2028(s)                   
25  N-100030-0001-3   Antoine (North) Paving and Drainage: Victory to West Gulf Bank   411Q,411U   $15,573,369.06   12-16-2026(s)   02-24-2027(s)      03-30-2028(s)   05-14-2028(s)   07-23-2028(s)                   
26  N-100030-0GEC-3   General Engineering Consultant (GEC) for Antoine Drive from US 290 to W Mt Houston   411K,411L,411Q,411U,411Y,451C,451G,451L   $113,300,000.01   12-16-2026(s)   02-24-2027(s)      03-30-2028(s)   05-14-2028(s)   07-23-2028(s)                   
27  R-002011-090C-3   Neighborhood Sewer Systems Improvements Deer Ridge Estates and Fondren Gardens      $0.00   12-23-2026(s)   03-03-2027(s)      11-28-2027(s)   01-12-2028(s)   03-22-2028(s)                   
28  S-000100-0026-3   New/Replacement of Water Well IAH Well 4   374A   $8,561,563.00   12-23-2026(s)   03-03-2027(s)   500   07-15-2028(s)   08-29-2028(s)   11-07-2028(s)                   
29  R-000267-127A-3   LS Rehab Package 2: Scott #1   493Z   $22,620,000.00   12-30-2026(s)   03-10-2027(s)      12-05-2027(s)   01-19-2028(s)   03-29-2028(s)                   
30  S-000012-032B-3   Southeast Water Purification Plant (SEWPP) Improvements Package 2   577R   $15,433,000.00   01-06-2027(s)   03-17-2027(s)      12-12-2027(s)   01-26-2028(s)   04-05-2028(s)   Sonny Do                
31  R-001000-0031-3   CRMP Package 6- Area 1- Basin IB043   414X,454B,454C   $88,301,600.00   01-08-2029(s)   03-19-2029(s)      12-14-2029(s)   01-28-2030(s)   04-08-2030(s)                   
32  S-000035-0315-3   WLR in South Gessner Area    570D,570H,570M,571A,571H,571E   $0.00   01-10-2028(s)   03-20-2028(s)      12-15-2028(s)   01-29-2029(s)   04-09-2029(s)                   
33  N-100017-0001-3   Gessner Street Paving and Drainage Buffalo Bayou to Richmond   490W   $24,742,400.00   01-12-2028(s)   03-22-2028(s)      04-26-2029(s)   06-10-2029(s)   08-19-2029(s)                   
34  R-000536-0035-3   Wrightwood SSO elimination   493C   $2,779,000.00   01-12-2028(s)   03-22-2028(s)      12-17-2028(s)   01-31-2029(s)   04-11-2029(s)                   
35  S-000035-0300-3   WLR in Interstate 10 and Market Street Subdivisions   496L,496M,496K,496F   $0.00   01-13-2028(s)   03-23-2028(s)      12-18-2028(s)   02-01-2029(s)   04-12-2029(s)                   
36  N-000818-0001-3   Fulton Street Reconstruction from Quitman to Hogan Street   493H   $5,482,000.00   01-13-2027(s)   03-24-2027(s)   635   12-18-2028(s)   02-01-2029(s)   04-12-2029(s)                   
37  N-100036-0001-3   Chimney Rock Road Connectivity at Fort Bend Toll Road   571F,571K,571L   $3,900,000.00   01-13-2027(s)   03-24-2027(s)   253   12-02-2027(s)   01-16-2028(s)   03-26-2028(s)   Mohammad Sabzevari                
38  R-000265-0147-3   IAH Wastewater Treatment Plant Expansion   373M   $52,900,175.00   01-14-2026(s)   03-25-2026(s)   900   09-10-2028(s)   10-25-2028(s)   01-03-2029(s)                   
39  R-000265-0161-3   Northbelt Wastewater Treatment Plant Improvements and Expansion   454Y   $71,525,000.00   01-17-2028(s)   03-27-2028(s)   720   03-17-2030(s)   05-01-2030(s)   07-10-2030(s)                   
40  R-000265-0162-3   Greenridge Wastewater Treatment Plant improvements   571X   $15,454,545.00   01-18-2027(s)   03-29-2027(s)   364   03-27-2028(s)   05-11-2028(s)   07-20-2028(s)   Singarpal Sekhon                
41  R-000265-0146-3   Sims South Wastewater Treatment Plant Improvement   535L   $24,682,000.00   01-20-2027(s)   03-31-2027(s)   730   03-30-2029(s)   05-14-2029(s)   07-23-2029(s)                   
42  R-002011-091B-3   Neighborhood Sewer System Improvements, Package 6 Area 2   489C   $7,050,000.00   01-20-2027(s)   03-31-2027(s)      12-26-2027(s)   02-09-2028(s)   04-19-2028(s)   Sudarshan Gouni                
43  N-T01011-0001-3   St. George Place School Crossings Improvements/ City of Houston Systemic Safety Project (HSIP-25)      $0.00   01-21-2026(s)   04-01-2026(s)      05-06-2027(s)   06-20-2027(s)   08-29-2027(s)                   
44  R-000265-0117-3   Intercontinental Airport (IAH) WWTP Improvements   373M   $21,338,110.00   01-21-2026(s)   04-01-2026(s)   724   03-25-2028(s)   05-09-2028(s)   07-18-2028(s)                   
45  S-000900-0173-3   48-inch Water Line from SH288 to Cullen Boulevard along E Orem Drive   573J,573K,573L,573M,573Q,573R   $25,547,100.00   01-21-2026(s)   04-01-2026(s)   655   01-16-2028(s)   03-01-2028(s)   05-10-2028(s)   Panduranga Kuruva                
46  S-000035-0304-3   WLR in Melrose Park Neighborhood Area   413Q,413U,413P,413T   $0.00   01-25-2028(s)   04-04-2028(s)      12-30-2028(s)   02-13-2029(s)   04-24-2029(s)                   
47  R-001000-0038-3   CRMP CIP Package 2 (CD Area 2 and 3)   494L   $128,000,000.00   01-25-2029(s)   04-05-2029(s)      12-31-2029(s)   02-14-2030(s)   04-25-2030(s)                   
48  N-000386-001A-3   Tanglewood Area Street Rehab (NSR 454 B)   491K,491L,491P,491Q   $9,201,405.00   01-27-2027(s)   04-07-2027(s)      05-11-2028(s)   06-25-2028(s)   09-03-2028(s)   Sam Habibi                
49  N-310662-0049-3   Citywide Intersection Safety Improvements (FY 16)   000A   $0.00   01-30-2019(s)   04-10-2019(s)      05-14-2020(s)   06-28-2020(s)   09-06-2020(s)                   
50  S-000035-0306-3   WLR in Ashford South and Ashford Village Areas      $0.00   02-03-2028(s)   04-13-2028(s)      01-08-2029(s)   02-22-2029(s)   05-03-2029(s)                   
51  S-000035-0313-3   WLR in Oak Forest-Area A      $0.00   02-03-2028(s)   04-13-2028(s)      01-08-2029(s)   02-22-2029(s)   05-03-2029(s)                   
52  M-430220-040B-3   River Hollow Lane Outfall Improvements    491R   $0.00   02-03-2027(s)   04-14-2027(s)      05-18-2028(s)   07-02-2028(s)   09-10-2028(s)                   
53  S-000900-0144-3   54-inch Water Line along Galveston Road from HCFCD Channel No B104-05-00 to Clear Lake City Water Authority Pump Station No. 3 (aka SETL Contract B)   617H,617M,618J,618N,618T   $31,000,500.00   02-03-2027(s)   04-14-2027(s)   540   10-05-2028(s)   11-19-2028(s)   01-28-2029(s)   Panduranga Kuruva                
54  N-T05000-0012-3   Waugh Dr and Heights Blvd Safety Improvements / City of Houston Systemic Safety Project (HSIP-24)      $0.00   02-04-2026(s)   04-15-2026(s)      05-20-2027(s)   07-04-2027(s)   09-12-2027(s)                   
55  R-001000-0034-3   CRMP Package 9 - Areas 8 and 11 - Basins IB032 and IB022   495E,494A,495H   $27,577,880.00   02-08-2028(s)   04-18-2028(s)   746   05-04-2030(s)   06-18-2030(s)   08-27-2030(s)                   
56  S-000035-0308-3   WLR in UH Neighborhood   493Z,533C,533D,533G,533H,534A,534E   $0.00   02-10-2028(s)   04-20-2028(s)      01-15-2029(s)   03-01-2029(s)   05-10-2029(s)                   
57  R-001000-0039-3   CRMP CIP Package 3 (CD Area 2 and 3)   494L   $303,000,000.00   02-09-2029(s)   04-20-2029(s)   1000   01-15-2032(s)   02-29-2032(s)   05-09-2032(s)                   
58  N-310650-0086-3   Citywide Traffic Signal Rebuild Package #12 (FY17)   411A      02-13-2019(s)   04-24-2019(s)   730   04-23-2021(s)   06-07-2021(s)   08-16-2021(s)                   
59  R-000267-0177-3   Lift Station Rehabilitation and Reconstruction Design FEMA - CD (Kingwood Place South LS, Golden Bear LS, Deer Springs LS, AG Farm LS, Golf Course LS)   335H,336A,336G,336H   $16,488,153.00   02-14-2027(s)   04-25-2027(s)   720   04-14-2029(s)   05-29-2029(s)   08-07-2029(s)                   
60  M-410041-0001-3   Wheeler and MLK Detention Basins, RR Culvert, and KG Expansion   534J,534K,534G,534F   $20,570,000.00   02-14-2029(s)   04-25-2029(s)      05-30-2030(s)   07-14-2030(s)   09-22-2030(s)   Prakash Luetel                
61  M-410041-0002-3   Kuhlman Gully Detention Basin   534G,534F,534K   $0.00   02-14-2029(s)   04-25-2029(s)      05-30-2030(s)   07-14-2030(s)   09-22-2030(s)   Prakash Luetel                
62  S-000035-0302-3   WLR in Houston Heights (South)   492D,452Z   $0.00   02-18-2028(s)   04-28-2028(s)      01-23-2029(s)   03-09-2029(s)   05-18-2029(s)                   
63  S-000035-0332-3   WLR in Sunnyside Area II      $0.00   02-18-2028(s)   04-28-2028(s)      01-23-2029(s)   03-09-2029(s)   05-18-2029(s)                   
64  S-000035-0299-3   WLR in Greater Eastwood & Second Ward   493R,494N,494P,493V,494S   $0.00   02-23-2028(s)   05-03-2028(s)      01-28-2029(s)   03-14-2029(s)   05-23-2029(s)                   
65  S-000900-0180-3   24-Inch Water Line along West Road from Deer Trail Drive to North IH 45 (East ROW)   412C,412D   $7,521,149.20   02-23-2028(s)   05-03-2028(s)   310   03-09-2029(s)   04-23-2029(s)   07-02-2029(s)   Panduranga Kuruva                
66  S-000035-0311-3   WLR in Memorial Neighborhod-Area B   489B,489F   $0.00   02-24-2028(s)   05-04-2028(s)      01-29-2029(s)   03-15-2029(s)   05-24-2029(s)                   
67  R-001000-0035-3   CRMP CIP Package 4 -Replacement of Eddington LS, FM Installation, and Construction of Storage Tank and LS at Wet Weather Facility      $40,693,000.00   02-24-2027(s)   05-05-2027(s)      01-30-2028(s)   03-15-2028(s)   05-24-2028(s)                   
68  M-000126-0073-3   FY12 LDP Design Work Orders         02-25-2026(s)   05-06-2026(s)   730   05-05-2028(s)   06-19-2028(s)   08-28-2028(s)   Prakash Luetel                
69  S-001000-056B-3   LAS System at Ground Water Facilities and Chemical Improvements at Repump Stations - Package 2      $9,200,000.00   02-25-2026(s)   05-06-2026(s)   900   10-22-2028(s)   12-06-2028(s)   02-14-2029(s)                   
70  R-001000-0033-3   CRMP Package 8 - Area 1- Basin IB043   454L,454Q,454U   $71,907,600.00   02-29-2028(s)   05-09-2028(s)      02-03-2029(s)   03-20-2029(s)   05-29-2029(s)                   
71  R-000267-0180-3   Lift Station Rehabilitation and Reconstruction Design FEMA - CD (Woodland Ridge LS, Ben's Branch LS, Elmwood Hills LS, Trail River LS, Forest Shores LS, Riverlawn LS)      $23,662,227.00   03-03-2027(s)   05-12-2027(s)   720   05-01-2029(s)   06-15-2029(s)   08-24-2029(s)                   
72  S-001000-056C-3   LAS System at Ground Water Facilities and Chemical Improvements at Repump Stations - Package 3      $4,452,600.00   03-04-2026(s)   05-13-2026(s)   660   03-03-2028(s)   04-17-2028(s)   06-26-2028(s)                   
73  N-210005-0001-3   Roseland Area Paving and Drainage   493W   $8,080,833.00   03-16-2026(s)   05-25-2026(s)   630   02-14-2028(s)   03-30-2028(s)   06-08-2028(s)   Sudarshan Gouni                
74  R-001000-0040-3   CRMP CIP Package 10 (Area1 - Basin IB043)   414W   $62,046,201.50   03-18-2028(s)   05-27-2028(s)   730   05-27-2030(s)   07-11-2030(s)   09-19-2030(s)                   
75  R-000267-0186-3   Lift Station Hazard Mitigation and Improvement Projects FEMA - CD (Forest Cove Dr. #1 LS, Forest Cove Dr. #2 LS, Marina LS, Kingwood Dr. LS, Deer Ridge Estates LS, Forest Garden LS, Aqua Vista LS, River Lift Station)      $20,833,333.00   03-22-2028(s)   05-31-2028(s)      02-25-2029(s)   04-11-2029(s)   06-20-2029(s)                   
76  R-000265-0153-3   Keegans Bayou Wastewater Treatment Plant Improvements   530S   $44,000,000.00   03-23-2027(s)   06-01-2027(s)   720   05-21-2029(s)   07-05-2029(s)   09-13-2029(s)                   
77  S-000035-0268-3   Watermain Replacement in Near Town-Montrose Area and Plainview Subdivision   492Q,492R,492U,492V   $14,213,886.00   03-25-2026(s)   06-03-2026(s)      02-28-2027(s)   04-14-2027(s)   06-23-2027(s)   Mohammad Sabzevari                
78  S-000035-0284-3   Waterline Replacement in Independence Heights    453N,453J,452R,452M,453M,453K   $7,268,481.00   03-25-2026(s)   06-03-2026(s)      02-28-2027(s)   04-14-2027(s)   06-23-2027(s)                   
79  N-210006-0001-3   Huntington Village Sec 4 Area Paving and Drainage   528U,528V,528Y,528Z   $15,999,000.50   03-29-2027(s)   06-07-2027(s)   1095   06-06-2030(s)   07-21-2030(s)   09-29-2030(s)   Prakash Luetel                
80  N-100030-003A-3   Antoine Drive Paving & Drainage: Acorn Street to US 290   451G,451L   $0.00   03-29-2028(s)   06-07-2028(s)      07-12-2029(s)   08-26-2029(s)   11-04-2029(s)                   
81  N-100030-003C-3   Antoine Paving and Drainage: Cole Creek to Victory   411U,411Y,451C   $0.00   03-29-2028(s)   06-07-2028(s)      07-12-2029(s)   08-26-2029(s)   11-04-2029(s)                   
82  R-000265-0159-3   Beltway Wastewater Treatment Plant Improvements   529G   $19,350,000.00   03-31-2027(s)   06-09-2027(s)   720   05-29-2029(s)   07-13-2029(s)   09-21-2029(s)                   
83  S-000066-A011-3   Work order #1 for project advisor/technical consultant services for Northeast Water Purification Plant Expansion.   377W   $0.00   04-03-2013(s)   06-12-2013(s)   120   10-10-2013(s)   11-24-2013(s)   02-02-2014(s)                   
84  S-000066-B011-3   Work Order #2 - Study System Failure @ NEWPP After Feb-2012 Storm Event   377W   $0.00   04-03-2013(s)   06-12-2013(s)   120   10-10-2013(s)   11-24-2013(s)   02-02-2014(s)                   
85  S-000066-C011-3   Work Order #2A - Study System Failure @ NEWPP After Jun-2012 Storm Event   377W   $0.00   04-03-2013(s)   06-12-2013(s)   180   12-09-2013(s)   01-23-2014(s)   04-03-2014(s)                   
86  S-000066-D011-3   Work Order #3 - Authority Engagement for Project Advisor/Technical Consultant Services for Northeast Water Purification Plant (NEWPP) Expansion   377W   $0.00   04-03-2013(s)   06-12-2013(s)      03-09-2014(s)   04-23-2014(s)   07-02-2014(s)                   
87  M-410016-001B-3   Westridge and Braes Terrace Area Drainage and Paving   532K,532N,532P,532Q,532T   $6,491,689.00   04-05-2028(s)   06-14-2028(s)      07-19-2029(s)   09-02-2029(s)   11-11-2029(s)   Sam Habibi                
88  S-000056-0085-3   East Water Purification Plant (EWPP) Mechanical & Electrical Improvements for Plant 3   496U,496Y   $0.00   04-05-2028(s)   06-14-2028(s)      03-11-2029(s)   04-25-2029(s)   07-04-2029(s)   Sonny Do                
89  S-000035-0317-3   WLR in Oak Forest-Area B   451M,451R,452J,452N   $0.00   04-06-2028(s)   06-15-2028(s)      03-12-2029(s)   04-26-2029(s)   07-05-2029(s)                   
90  N-100010-0001-3   Dunlavy Paving: West Dallas to Peden   492M,492R   $5,769,000.00   04-12-2027(s)   06-21-2027(s)      07-25-2028(s)   09-08-2028(s)   11-17-2028(s)   Sudarshan Gouni                
91  S-000900-0136-3   72-inch Water Line along Greenbriar Dr to Metro Corridor to SWPS    491Z,492U,492W,492X,492Y   $78,660,700.00   04-14-2027(s)   06-23-2027(s)   651   04-04-2029(s)   05-19-2029(s)   07-28-2029(s)   Panduranga Kuruva                
92  R-000035-0028-3   Force Main Rehabilitation and Reconstruction Design Consent Decree - Songwood and Gessner#1 Lift Stations   496F,490J,490N   $5,422,000.00   04-22-2026(s)   07-01-2026(s)      03-28-2027(s)   05-12-2027(s)   07-21-2027(s)                   
93  S-000900-0309-3   Professional Engineering Services for the Technical Advisor Support for the Surface Water Transmission Program   114M   $0.00   04-24-2025(p)   07-03-2025(p)      03-30-2026(p)   05-14-2026(p)   07-23-2026(p)                   
94  R-000267-0185-3   Lift Station Hazard Mitigation and Improvement Projects FEMA- CD (Sunnyglen Dr LS, Scotts Point LS, Woodstream LS, Riverchase Trail LS, Aspen Pass LS, Covecrest LS, and Spanish Cove LS)   338L,338L,297Q,297V,297R,338V,338Y   $11,375,000.00   04-27-2028(s)   07-06-2028(s)      04-02-2029(s)   05-17-2029(s)   07-26-2029(s)                   
95  R-000265-0154-3   Sims Bayou South Wastewater Treatment Plant Improvements Package 3   535L   $56,000,000.00   04-28-2027(s)   07-07-2027(s)   515   12-03-2028(s)   01-17-2029(s)   03-28-2029(s)   Singarpal Sekhon                
96  N-321040-075A-3   Hirsch Road Bridge Rehabilitation and Replacement Projects FY 22-25   454C   $1,251,673.00   04-29-2026(s)   07-08-2026(s)   365   07-08-2027(s)   08-22-2027(s)   10-31-2027(s)   Juan Rendon                
97  R-000265-0150-3   Northwest Wastewater Treatment Plant Improvements   451C   $46,850,845.00   04-29-2026(s)   07-08-2026(s)   915   01-08-2029(s)   02-22-2029(s)   05-03-2029(s)   Singarpal Sekhon                
98  S-000200-029A-3   Ground Water Well Rehabilitation at Various Location - Package I      $0.00   04-29-2026(s)   07-08-2026(s)   500   11-20-2027(s)   01-04-2028(s)   03-14-2028(s)                   
99  R-002011-0091-3   Neighborhood Sewer Systems Improvements, Package 6   489C,490R,491Y,491X      04-30-2025(p)   07-09-2025(p)      04-05-2026(p)   05-20-2026(p)   07-29-2026(p)   Mohammad Sabzevari                
100  R-000267-0184-3   Lift Station Hazard Mitigation and Improvement Projects FEMA - CD (Mississippi LS, Berkley LS, Hunterwood M.U.D. LS, Ballantine LS, Minnesota LS, Kirby Drive #3 LS)      $26,875,000.00   05-04-2028(s)   07-13-2028(s)      04-09-2029(s)   05-24-2029(s)   08-02-2029(s)                   
101  S-000035-0267-3   Water Line Rehabilitation in Central Park and Magnolia Park Subdivisions I   494U,494V,494Z,495S,495W   $0.00   05-05-2027(s)   07-14-2027(s)      04-09-2028(s)   05-24-2028(s)   08-02-2028(s)                   
102  S-001000-56B2-3   LAS System at Ground Water Facilities and Chemical Improvements at Repump Stations - Package 3      $4,770,900.00   05-13-2026(a)   07-22-2026(a)   830   10-29-2028(a)   12-13-2028(a)   02-21-2029(a)                   
103  S-000035-0281-3   Waterline in Dissen Heights - Eastlawn Area   494T,494X,494Y   $11,000,000.00   05-13-2026(s)   07-22-2026(s)      04-18-2027(s)   06-02-2027(s)   08-11-2027(s)   Mohammad Sabzevari                
104  N-100042-0002-3   Telephone Road: Main Street Revitalization Project (Subproject 2)   534C,534G,534H,534M   $18,768,600.00   05-19-2027(s)   07-28-2027(s)      08-31-2028(s)   10-15-2028(s)   12-24-2028(s)   Yusherry Cang                
105  N-32F782-0001-3   IMD Bikeways from Dairy Ashford Road to Arthur Storey Park   529J,529K,529L,528M   $0.00   05-19-2027(s)   07-28-2027(s)      08-31-2028(s)   10-15-2028(s)   12-24-2028(s)   Yusherry Cang                
106  R-000265-0158-3   White Oaks Wastewater Treatment Plant Improvements   411N   $17,948,717.94   05-19-2027(s)   07-28-2027(s)   720   07-17-2029(s)   08-31-2029(s)   11-09-2029(s)                   
107  R-000267-0188-3   Lift Station Improvement Projects (Consent Decree) (North Houston-Rosslyn LS, Pinemont LS, Hollister LS, Windfern LS, Mitchell LS, & Northcourt LS)   411N,451H,450D,410X,412R,410Y   $18,605,025.00   05-19-2028(s)   07-28-2028(s)   610   03-30-2030(s)   05-14-2030(s)   07-23-2030(s)                   
108  M-410039-0002-3   Drainage and Paving Improvements for Cottage Grove East, Phase II   492C,492G   $24,339,658.06   05-20-2026(s)   07-29-2026(s)      09-02-2027(s)   10-17-2027(s)   12-26-2027(s)                   
109  M-420HUD-006A-3   DR15 6A Edgewood Park Detention Basin    534X   $3,500,000.00   05-20-2026(s)   07-29-2026(s)      09-02-2027(s)   10-17-2027(s)   12-26-2027(s)   Prakash Luetel                
110  R-000265-0096-3   Upper Brays Wastewater Treatment Plant Improvements   529A   $13,884,000.00   05-20-2026(s)   07-29-2026(s)   450   10-22-2027(s)   12-06-2027(s)   02-14-2028(s)                   
111  S-000056-084A-3     East Water Purification Plant (EWPP) Mechanical and Electrical Improvements for Plant 1 and 2- Package 1   496U,496Y   $15,950,050.00   05-20-2026(s)   07-29-2026(s)      04-25-2027(s)   06-09-2027(s)   08-18-2027(s)   Sonny Do                
112  S-000600-0056-3   Rehabilitation of Water Storage Tanks - Package 16   528H,299W,449U,488L   $6,200,000.00   05-20-2026(s)   07-29-2026(s)      04-25-2027(s)   06-09-2027(s)   08-18-2027(s)   Panduranga Kuruva                
113  R-001000-0037-3   CRMP CIP Package 1 (CD Area 2 and 3)   494K,494L,494Q   $45,000,000.00   05-21-2029(s)   07-30-2029(s)      04-26-2030(s)   06-10-2030(s)   08-19-2030(s)                   
114  S-000035-0298-3   Waterline Replacement in Midtown Area   493P,493T,493U,493X,493V   $8,443,045.00   05-22-2026(s)   07-31-2026(s)      04-27-2027(s)   06-11-2027(s)   08-20-2027(s)                   
115  S-001000-053B-3   of Facilities Improvements at Various Well Sites and Re-Pump Stations - Package 4   449T,449U,449L,449G,448Y,449X,449Q,528H,528K,528M,528C,489U   $5,268,006.46   05-26-2027(s)   08-04-2027(s)      04-30-2028(s)   06-14-2028(s)   08-23-2028(s)                   
116  M-410028-0001-3   Westbury Area Drainage and Paving Improvements Subproject 1   571A,571B,571E,571F   $25,246,030.00   05-27-2026(s)   08-05-2026(s)      09-09-2027(s)   10-24-2027(s)   01-02-2028(s)                   
117  R-002011-0089-3   Neighborhood Sewer System Improvements (AS069)   492Q,492U,492V   $27,035,447.00   05-27-2026(s)   08-05-2026(s)   1020   05-21-2029(s)   07-05-2029(s)   09-13-2029(s)                   
118  M-42LHUD-0006-3   CDBG-MIT Frenchtown Drainage and Paving Improvements   494A,494B,454W,454X   $9,914,476.00   05-29-2026(s)   08-07-2026(s)   180   02-03-2027(s)   03-20-2027(s)   05-29-2027(s)   Prakash Luetel                
119  M-430296-0018-3   Boone Park and Hackberry Park Detention Basins   528M,529K   $15,400,000.00   05-29-2026(s)   08-07-2026(s)      09-11-2027(s)   10-26-2027(s)   01-04-2028(s)                   
120  S-000900-0143-3   54-inch Water Line along BW8, Duffer Ln, Perimeter Rd and Highway 3 from Grayson St to HCFCD Channel No. B104-05-00 (aka SETL Contract A)   532U,532V,533S,533T,533U,533V   $30,529,478.91   06-02-2027(s)   08-11-2027(s)   980   04-17-2030(s)   06-01-2030(s)   08-10-2030(s)   Panduranga Kuruva                
121  R-000267-0172-3   MUD #175-1, Sherwood Oaks, Green Dolphin, and West Court Lift Stations Renewal and Replacement   495S,297U,336A,336B,297Z   $16,144,741.00   06-03-2026(s)   08-12-2026(s)   720   08-01-2028(s)   09-15-2028(s)   11-24-2028(s)                   
122  S-001000-056D-3   LAS System at Ground Water Facilities and Chemical Improvements at Repump Stations - Package 4      $4,291,430.00   06-03-2026(s)   08-12-2026(s)   570   03-04-2028(s)   04-18-2028(s)   06-27-2028(s)   Sonny Do                
123  N-210015-0001-3   Paving and Drainage Improvements in Alief Forest South Area- Sub-Project 1   529J,529N   $41,829,000.00   06-09-2027(s)   08-18-2027(s)   540   02-08-2029(s)   03-25-2029(s)   06-03-2029(s)   Sudarshan Gouni                
124  R-000267-0176-3   Lift Station Rehabilitation and Reconstruction Projects(Carvel Lane Lift Station, Gulfton Lift Station, Linkwood Lift Station, Saddle Brook Lift Station, Alder Lift Station, Boonridge Lift Station) -Consent Decree   491F,530M,531A,531K,532N,571Z   $20,000,000.00   06-09-2027(s)   08-18-2027(s)      05-14-2028(s)   06-28-2028(s)   09-06-2028(s)                   
125  R-000035-0032-3   Force Main Rehabilitation and Replacement for Trail River, Lake Village, and Bens Branch Lift Stations   337D,336N,337F   $0.00   06-14-2028(s)   08-23-2028(s)      05-20-2029(s)   07-04-2029(s)   09-12-2029(s)                   
126  R-000267-0179-3   Lift Station Rehabilitation and Reconstruction Design (Lockwood Lift Station, South Point Lift Station, Scott #3 Lift Station, Market St. #2 Lift Station, M.U.D. #067 Lift Station, Woodforest Lift Station) - Consent Decree   494Q,497K,496D,576Q,573G,617B   $27,085,000.00   06-16-2027(s)   08-25-2027(s)      05-21-2028(s)   07-05-2028(s)   09-13-2028(s)                   
127  R-000267-0181-3   Lift Station Rehabilitation Electrical Improvements Consent Decree      $22,375,490.00   06-16-2027(s)   08-25-2027(s)   720   08-14-2029(s)   09-28-2029(s)   12-07-2029(s)                   
128  S-000900-0304-3   Groundwater Reduction Plan (GRP) Conversion Waterlines Group C   332Z,333W   $5,178,300.00   06-16-2027(s)   08-25-2027(s)      05-21-2028(s)   07-05-2028(s)   09-13-2028(s)   Panduranga Kuruva                
129  M-410040-0001-3   Braeburn Glen Area Drainage and Paving Improvements   530P,530S,530T,530N   $20,624,472.71   06-17-2026(s)   08-26-2026(s)      09-30-2027(s)   11-14-2027(s)   01-23-2028(s)   Prakash Luetel                
130  M-410040-001A-3   Sharpstown Area Detention Pond A    530U   $8,382,810.44   06-17-2026(s)   08-26-2026(s)   434   11-03-2027(s)   12-18-2027(s)   02-26-2028(s)   Prakash Luetel                
131  S-000701-0050-3   Large Diameter Water Line and Valves Replacement - Package 4    412S,412T,414U,455T,492Y,493K,493L,493Q,493R,493Y,494N,494P,494X,496Q,496U,496Y,536C   $0.00   06-21-2028(s)   08-30-2028(s)      05-27-2029(s)   07-11-2029(s)   09-19-2029(s)                   
132  M-420HUD-013A-3   DR15 13A EP Hill Park Detention Basin   533V   $3,809,862.00   06-24-2026(s)   09-02-2026(s)      10-07-2027(s)   11-21-2027(s)   01-30-2028(s)   Prakash Luetel                
133  R-000265-0113-3   Clinton Park Wastewater Treatment Plant (WWTP) Improvements   495Y   $9,870,000.00   06-24-2026(s)   09-02-2026(s)   450   11-26-2027(s)   01-10-2028(s)   03-20-2028(s)                   
134  R-000265-0151-3   Sims North Wastewater Treatment Plant Improvements - Package 3   535H   $12,953,100.00   06-24-2026(s)   09-02-2026(s)      05-30-2027(s)   07-14-2027(s)   09-22-2027(s)                   
135  R-000509-0041-3   69th Street Wastewater Treatment Plant Improvements( Package 7)   494R   $6,000,000.00   06-24-2026(s)   09-02-2026(s)      05-30-2027(s)   07-14-2027(s)   09-22-2027(s)                   
136  S-001000-0054-3   GW Facility/Re-Pump Station/HVAC & Ventilation System Improvements at Various Locations - Package 3   374A,296V,488A,410R,336F,489P,489N,529B   $14,907,000.00   06-24-2026(s)   09-02-2026(s)   290   06-19-2027(s)   08-03-2027(s)   10-12-2027(s)                   
137  M-410015-0002-3   Magnolia Park Sec. 2 Area Drainage and Paving Subproject 2   495S,495W,495X,535A,535B   $20,800,453.91   06-25-2025(s)   09-03-2025(s)   730   09-03-2027(s)   10-18-2027(s)   12-27-2027(s)   Prakash Luetel                
138  S-000065-0012-3   Construction of New Monofil at Northeast Water Purification Plant (NEWPP)   377W   $43,028,477.00   06-30-2027(s)   09-08-2027(s)      06-04-2028(s)   07-19-2028(s)   09-27-2028(s)                   
139  S-000900-0178-3   66-inch Water Line along Green Plaza Dr, Fallbrook Dr from Plaza Verde Dr to Greens Crossing Blvd (MUD #321)   372U,372Y,412C   $8,241,926.00   06-30-2027(s)   09-08-2027(s)   730   09-07-2029(s)   10-22-2029(s)   12-31-2029(s)   Panduranga Kuruva                
140  S-000035-0305-3   WLR in Shady Acres   492C,452C,452P,452Q,452S,452T,452U,452Y   $0.00   07-05-2027(s)   09-13-2027(s)      06-09-2028(s)   07-24-2028(s)   10-02-2028(s)                   
141  S-000035-0312-3   WLR in Second Ward North      $0.00   07-05-2027(s)   09-13-2027(s)      06-09-2028(s)   07-24-2028(s)   10-02-2028(s)                   
142  N-321040-A135-3   HSIP Safety Improvement Package No.1   492X,576J,533Z,493M   $450,067.60   07-10-2026(s)   09-18-2026(s)      10-23-2027(s)   12-07-2027(s)   02-15-2028(s)                   
143  N-321040-B135-3   HSIP Safety Improvement Package No.2   570G,570H,570L,570M,570Q,570R,531B,531F,531K,528H,528M,528R   $2,080,011.06   07-10-2026(s)   09-18-2026(s)      10-23-2027(s)   12-07-2027(s)   02-15-2028(s)                   
144  R-001000-0032-3   CRMP Package 7- Area 1- Basin IB043   454C,454G,454L   $67,776,123.60   07-11-2028(s)   09-19-2028(s)      06-16-2029(s)   07-31-2029(s)   10-09-2029(s)                   
145  S-000035-0288-3   Waterline Replacement in Fortbend Houston , Jensen Tidwell, Parkette And Homewood Denton Areas   571W,571S,570Z,570V   $14,280,000.00   07-14-2026(s)   09-22-2026(s)      06-19-2027(s)   08-03-2027(s)   10-12-2027(s)                   
146  S-000900-0146-3   36-inch Water Line along Medical Center Blvd, Channel A111-00-00 and Bay Area Blvd from Galveston Rd to Beamer Rd (aka SETL Contract D)   617Z,618T,618W,618X   $18,217,200.00   07-14-2027(s)   09-22-2027(s)   550   03-25-2029(s)   05-09-2029(s)   07-18-2029(s)   Panduranga Kuruva                
147  M-410013-0001-3   Melrose Park Sec 2 Drainage and Paving Improvements   413P,413Q,413T,413U   $17,686,279.43   07-19-2028(s)   09-27-2028(s)      11-01-2029(s)   12-16-2029(s)   02-24-2030(s)   Prakash Luetel                
148  N-100042-0001-3   Telephone Road: Main Street Revitalization Project (Subproject 1)   494X,534B,534C   $5,343,300.00   07-22-2026(s)   09-30-2026(s)   1070   09-04-2029(s)   10-19-2029(s)   12-28-2029(s)   Yusherry Cang                
149  S-000035-0270-3   Watermain Replacement in Second Ward Area   494N,494P,494S,494T   $13,561,527.00   07-22-2026(s)   09-30-2026(s)      06-27-2027(s)   08-11-2027(s)   10-20-2027(s)   Mohammad Sabzevari                
150  R-000265-0168-3   Wastewater Treatment Plant Hazard Mitigation _ WCID 76 WWTP (FN 485) FEMA - CD    415E   $27,500,000.00   07-26-2028(s)   10-04-2028(s)      07-01-2029(s)   08-15-2029(s)   10-24-2029(s)                   
151  R-000265-0160-3   Chocolate Bayou Wastewater Treatment Plant improvements   574E   $27,504,546.00   08-04-2027(s)   10-13-2027(s)   872   03-03-2030(s)   04-17-2030(s)   06-26-2030(s)   Singarpal Sekhon                
152  S-000035-0303-3   WLR in Texas Medical Center (TMC) Area   532D,532G,532H,532L,532M,532Q,532R,532V,533A,533E,533F,533J,533K,533N,533P,533S,533S,533T   $0.00   08-04-2027(s)   10-13-2027(s)      07-09-2028(s)   08-23-2028(s)   11-01-2028(s)                   
153  S-000900-0147-3   24-Inch Water Line along the Easement parallel to Highway 3 from Fuqua Street to Dixie Farm Road FM1959 (aka SETL Contract E)   576R,577N,577S,577X   $12,857,330.31   08-05-2026(s)   10-14-2026(s)   683   08-27-2028(s)   10-11-2028(s)   12-20-2028(s)   Panduranga Kuruva                
154  S-000900-0139-3   24-inch Water Line from Sunbeam Street to E Orem Drive along Martin Luther King Jr. Boulevard   573H,573M   $15,218,578.00   08-12-2026(s)   10-21-2026(s)   340   09-26-2027(s)   11-10-2027(s)   01-19-2028(s)   Panduranga Kuruva                
155  M-430241-011G-3   SWPS-FWS Work Order 7 [DESIGN]      $0.00   08-14-2019(s)   10-23-2019(s)      11-26-2020(s)   01-10-2021(s)   03-21-2021(s)                   
156  R-000267-178A-3   Lift Station Rehabilitation and Reconstruction Design (Trailwood Lift Station and Lake Village Lift Station)      $0.00   08-18-2027(s)   10-27-2027(s)      07-23-2028(s)   09-06-2028(s)   11-15-2028(s)   Singarpal Sekhon                
157  R-001000-0036-3   CRMP CIP Package 5 - Sanitary Sewer Improvements Upstream of Eddington LS    534C,494Y,494X   $0.00   08-20-2027(s)   10-29-2027(s)      07-25-2028(s)   09-08-2028(s)   11-17-2028(s)                   
158  N-100024-0001-3   Hirsch: Laura Koppe to Crosstimbers Paving and Drainage Improvements   454F,454K   $9,929,187.00   08-25-2027(s)   11-03-2027(s)      12-07-2028(s)   01-21-2029(s)   04-01-2029(s)   Mohammad Sabzevari                
159  N-321040-075B-3   Pedestrian Bridge Replacement over HCFCD Channels   532F,530Z,573C,337B   $2,442,515.00   08-26-2026(s)   11-04-2026(s)      12-09-2027(s)   01-23-2028(s)   04-02-2028(s)                   
160  M-000295-0001-3   Scott Street (OST to Brays Bayou) Area Drainage and Paving Improvements   533K,533L,533M,533P,533Q,533T,533U   $8,590,000.00   09-06-2028(s)   11-15-2028(s)      12-20-2029(s)   02-03-2030(s)   04-14-2030(s)   Prakash Luetel                
161  S-000056-0084-3   East Water Purification Plant (EWPP) Mechanical and Electrical Improvements for Plant 1 and 2 - Package 2   496U,496Y   $57,589,840.00   09-08-2027(s)   11-17-2027(s)      08-13-2028(s)   09-27-2028(s)   12-06-2028(s)   Sonny Do                
162  S-000900-0149-3   54-inch Water Line along Genoa Red Bluff and Easements from SEWPP to Grayson St (aka SETL Contract G)   577L,577M,577P,577Q,577R   $17,000,000.00   09-08-2027(s)   11-17-2027(s)   365   11-16-2028(s)   12-31-2028(s)   03-11-2029(s)   Panduranga Kuruva                
163  N-100008-0001-3   Fondren Road Paving and Drainage: Braeswood to Creekbend   530V,530Z   $15,780,407.00   09-09-2027(s)   11-18-2027(s)      12-22-2028(s)   02-05-2029(s)   04-16-2029(s)                   
164  N-100021-0001-3   Fondren Paving and Drainage from Creekbend to W. Airport   530Y,530Z,570C,570D,570G,570H   $25,719,952.00   09-09-2027(s)   11-18-2027(s)      12-22-2028(s)   02-05-2029(s)   04-16-2029(s)                   
165  S-000035-0307-3   WLR in Shadowbriar and Southlake Areas   488V,489S   $14,833,962.00   09-15-2027(s)   11-24-2027(s)      08-20-2028(s)   10-04-2028(s)   12-13-2028(s)                   
166  S-000035-0314-3   WLR in Sunnyside Area   533Y,573C   $0.00   09-16-2027(s)   11-25-2027(s)      08-21-2028(s)   10-05-2028(s)   12-14-2028(s)                   
167  M-410024-0001-3   Southland Area Drainage and Paving Improvements Subproject 1   533L,533Q      09-17-2025(p)   11-26-2025(p)      12-31-2026(p)   02-14-2027(p)   04-25-2027(p)   Prakash Luetel                
168  R-000267-0178-3   Lift Station Rehabilitation and Reconstruction Design(Heather Ridge Lift Station, M.C.M.U.D. #58 Lift Station, Will Clayton Lift Station, Trailwood Lift Station, Shady Maples Lift Station, Lake Village Lift Station, Brookdale Lift Station)   375J,296W,375A,336C,297N,336B,297S   $11,600,000.00   09-17-2027(s)   11-26-2027(s)   720   11-15-2029(s)   12-30-2029(s)   03-10-2030(s)                   
169  S-000035-0316-3   WMR in Spring Branch East, District 73 along Halifax, EBS, Court, Hiram, and South Areas    338Y,338Z,378D,451X,451Y,451Z,491C,492A,493R,494N,494P,494S,496D,496H,497A,611C,611D,611H   $0.00   09-20-2027(s)   11-29-2027(s)      08-25-2028(s)   10-09-2028(s)   12-18-2028(s)                   
170  S-000900-0310-3   42-inch Fuqua Line Extension from SH 288 to Hiram Clarke Rd   571M,572J,572K,572L,572M,573J   $44,090,909.09   09-20-2028(s)   11-29-2028(s)      08-26-2029(s)   10-10-2029(s)   12-19-2029(s)   Panduranga Kuruva                
171  S-000900-0181-3   66-inch Water Line along Veterans Memorial Drive    412C,412F,412K   $8,482,650.00   09-22-2026(s)   12-01-2026(s)   448   02-22-2028(s)   04-07-2028(s)   06-16-2028(s)   Panduranga Kuruva                
172  S-000900-0182-3   66-inch Water Line along Veteran Memorial Drive and West Gulf Bank Rd, from TX-249 to Ella Blvd   412K,412P   $9,636,000.00   09-22-2026(s)   12-01-2026(s)      08-28-2027(s)   10-12-2027(s)   12-21-2027(s)   Panduranga Kuruva                
173  S-000035-0309-3   WLR in Memorial Neighborhood-Area A   489E,489A   $14,991,442.00   09-22-2027(s)   12-01-2027(s)      08-27-2028(s)   10-11-2028(s)   12-20-2028(s)                   
174  S-000900-0179-3   66-inch Water Line along Greens Crossing Blvd, Channel No. P118-30-01, from Tall Pine Valley Dr to Turney Dr   412C,412G   $11,511,496.36   09-23-2026(s)   12-02-2026(s)      08-29-2027(s)   10-13-2027(s)   12-22-2027(s)   Panduranga Kuruva                
175  M-430220-040A-3   Market Street Storm Sewer Rehab Project   496K,496M   $4,141,000.00   09-25-2026(s)   12-04-2026(s)      01-08-2028(s)   02-22-2028(s)   05-02-2028(s)                   
176  R-002011-091C-3   Neighborhood Sewer Systems Improvements, Package 6 Area 3   490R   $2,000,000.00   10-07-2026(s)   12-16-2026(s)      09-12-2027(s)   10-27-2027(s)   01-05-2028(s)   Sudarshan Gouni                
177  S-000701-0041-3   Miscellaneous Large Diameter Waterline Improvements - Pkg 3    412S,412T,454N,455Y,491Y,491Z,532V,534D,535A,535F,535G,535K,535L,570H,571E,571J,576R   $19,782,500.00   10-07-2026(s)   12-16-2026(s)   2047   07-24-2032(s)   09-07-2032(s)   11-16-2032(s)   Panduranga Kuruva                
178  S-000900-0305-3   Groundwater Reduction Plan (GRP) Conversion Waterlines NW Area Group B   372Q,372S,372T,372U,371V,372P,372V,371S,371T,371V   $2,121,000.00   10-13-2027(s)   12-22-2027(s)   375   12-31-2028(s)   02-14-2029(s)   04-25-2029(s)   Panduranga Kuruva                
179  M-410016-001A-3   Westridge and Braes Terrace Area Drainage and Paving Improvements Phase 1A    532N,532P   $9,177,000.00   10-14-2026(s)   12-23-2026(s)      01-27-2028(s)   03-12-2028(s)   05-21-2028(s)   Sam Habibi                
180  N-210008-0001-3   Gray and Taft Area Paving and Drainage   493N,493P   $7,455,717.94   10-14-2026(s)   12-23-2026(s)   180   06-21-2027(s)   08-05-2027(s)   10-14-2027(s)   Mohammad Sabzevari                
181  R-000265-0166-3   Kingwood West Wastewater Treatment Plant Hazard Mitigation -FEMA-CD      $43,125,000.00   10-18-2028(s)   12-27-2028(s)      09-23-2029(s)   11-07-2029(s)   01-16-2030(s)                   
182  R-000265-0163-3   Cedar Bayou Wastewater Treatment Plant improvements and Expansion - FEMA   298Y,298Z,378C   $113,058,966.00   10-22-2027(s)   12-31-2027(s)      09-26-2028(s)   11-10-2028(s)   01-19-2029(s)