| Engineering | Construction |
No. |
WBS No |
Project Name |
Key Map |
Contract Amount |
Date of Award |
Forecast NTP |
Construction Days |
Substantial Comp Date |
Forecast Final Comp |
Forecast Accept Work |
Managing Engineer |
Project Manager |
Contractor |
CM and I |
Senior Inspector |
Inspector |
1 |
R-000265-0165-3 |
Kingwood Central Wastewater Treatment Plant WWTP Improvements -FEMA/CD |
337F |
$171,666,666.00 |
10-25-2028(s) |
01-03-2029(s) |
|
09-30-2029(s) |
11-14-2029(s) |
01-23-2030(s) |
|
|
|
|
|
|
2 |
S-001000-053A-3 |
Facilities Improvements at Various Well Sites and Re-Pump Stations - Package 3 |
409N,408R,408Q,408P,408N,409P,408R,529K,487Z |
$12,132,518.01 |
10-27-2026(s) |
01-05-2027(s) |
|
10-02-2027(s) |
11-16-2027(s) |
01-25-2028(s) |
|
|
|
|
|
|
3 |
R-000267-0183-3 |
Lift Station Hazard Mitigation and Improvement Projects FEMA -CD (Bayou Timber LS, 5th Street LS, Willowick LS, Heights LS, Bayou Place LS, North Macgregor Way #4 LS) |
492D,493L,491G,493E,534E,492N |
$22,835,000.00 |
10-27-2027(s) |
01-05-2028(s) |
|
10-01-2028(s) |
11-15-2028(s) |
01-24-2029(s) |
|
|
|
|
|
|
4 |
M-410035-001A-3 |
Northside High School Area - Sanitary Sewer Rehab |
493C,493D |
$0.00 |
10-28-2026(s) |
01-06-2027(s) |
|
02-10-2028(s) |
03-26-2028(s) |
06-04-2028(s) |
Prakash Luetel |
|
|
|
|
|
5 |
M-410035-0001-3 |
Northside High School Area Drainage and Paving |
493C,493D |
$39,814,812.00 |
10-29-2025(s) |
01-07-2026(s) |
|
02-11-2027(s) |
03-28-2027(s) |
06-06-2027(s) |
Prakash Luetel |
|
|
|
|
|
6 |
S-000900-0148-3 |
Highway 3 Distribution Water Line from Dixie Farm Road to north of West Texas Avenue (aka SETL Contract F) |
577X,617B,617C,617G,617H,617M,617R,618N |
$5,931,349.06 |
11-03-2027(s) |
01-12-2028(s) |
450 |
04-06-2029(s) |
05-21-2029(s) |
07-30-2029(s) |
Panduranga Kuruva |
|
|
|
|
|
7 |
S-000701-0043-3 |
Miscellaneous Large Diameter Water Line Improvements - Package 4 |
490A,490B,493K,493L,493M |
$17,513,250.00 |
11-04-2026(s) |
01-13-2027(s) |
545 |
07-11-2028(s) |
08-25-2028(s) |
11-03-2028(s) |
Panduranga Kuruva |
|
|
|
|
|
8 |
S-000701-0049-3 |
Large Diameter Water Line and Above Grade Crossings - Package 3 |
414S,415A,454D,454V,488D,488M,495N,496Y,533E,533F,536C |
$0.00 |
11-08-2028(s) |
01-17-2029(s) |
|
10-14-2029(s) |
11-28-2029(s) |
02-06-2030(s) |
|
|
|
|
|
|
9 |
R-000267-0174-3 |
Lift Station Rehabilitation and Reconstruction Design Consent Decree: Ladbrook, Pine Prairie, Stately Oaks, Chestnut Ridge and Magnolia Park |
336B,297P,298W,336A,495S |
$27,449,090.91 |
11-11-2026(s) |
01-20-2027(s) |
720 |
01-09-2029(s) |
02-23-2029(s) |
05-04-2029(s) |
|
|
|
|
|
|
10 |
R-002011-0096-3 |
Gravity Sewer Line Adjustment |
617C,617D,617G |
$4,180,000.00 |
11-11-2027(s) |
01-20-2028(s) |
234 |
09-10-2028(s) |
10-25-2028(s) |
01-03-2029(s) |
|
|
|
|
|
|
11 |
R-000035-0029-3 |
Force Main Rehabilitation and Reconstruction Projects - Consent Decree (Goodyear Lift Station, Scarsdale Lift Station) |
616D,535M |
$6,653,000.00 |
11-15-2027(s) |
01-24-2028(s) |
|
10-20-2028(s) |
12-04-2028(s) |
02-12-2029(s) |
|
|
|
|
|
|
12 |
M-410043-0001-3 |
C106-10 Channel Improvement |
576F |
$41,359,500.00 |
11-15-2028(s) |
01-24-2029(s) |
|
02-28-2030(s) |
04-14-2030(s) |
06-23-2030(s) |
Prakash Luetel |
|
|
|
|
|
13 |
N-210004-0001-3 |
Cloverland Area Paving and Drainage Improvements |
573L,573M |
$23,701,000.00 |
11-17-2026(s) |
01-26-2027(s) |
|
03-01-2028(s) |
04-15-2028(s) |
06-24-2028(s) |
Mohammad Sabzevari |
|
|
|
|
|
14 |
R-000267-0182-3 |
Lift Station Hazard Mitigation and Improvement Projects FEMA - CD (Old Stone Trail LS, Tanya Circle LS, M.U.D. #175-2 LS, Memorial Dr #5 LS, Fleetwood LS, Addicks LS, Woodway #2 LS) |
490R,488B,488E,488F |
$32,333,333.33 |
11-24-2027(s) |
02-02-2028(s) |
|
10-29-2028(s) |
12-13-2028(s) |
02-21-2029(s) |
|
|
|
|
|
|
15 |
M-410291-0001-3 |
Turkey Gully Drainage and Paving |
452T,452U |
$15,036,211.58 |
11-25-2026(s) |
02-03-2027(s) |
400 |
03-09-2028(s) |
04-23-2028(s) |
07-02-2028(s) |
Prakash Luetel |
|
|
|
|
|
16 |
S-000035-0283-3 |
Waterline Replacement in Near Northside |
453Z,453V |
$15,439,000.00 |
11-25-2026(s) |
02-03-2027(s) |
|
10-31-2027(s) |
12-15-2027(s) |
02-23-2028(s) |
|
|
|
|
|
|
17 |
S-000900-0186-3 |
48-inch Water Line from Forbes Road to Martindale Road along Almeda Genoa |
575N,574R,574Q,574P |
$13,000,000.00 |
11-25-2026(s) |
02-03-2027(s) |
333 |
01-02-2028(s) |
02-16-2028(s) |
04-26-2028(s) |
Panduranga Kuruva |
|
|
|
|
|
18 |
N-000664-0002-3 |
Greens Road: John F. Kennedy Boulevard to US 59 |
374P,374Q,374R,375N |
$47,941,000.00 |
12-02-2026(s) |
02-10-2027(s) |
|
03-16-2028(s) |
04-30-2028(s) |
07-09-2028(s) |
Mohammad Sabzevari |
|
|
|
|
|
19 |
R-000267-0173-3 |
Braeswood N, Post Oak #2, Bissonnet #4, Brooklet, NE Sludge Transfer (Dorsett), and Synott Road #1 Lift Stations Renewal and Replacement Project |
532L,611C,530T,529Y,528L,495F |
$0.00 |
12-09-2026(s) |
02-17-2027(s) |
|
11-14-2027(s) |
12-29-2027(s) |
03-08-2028(s) |
|
|
|
|
|
|
20 |
S-000701-0038-3 |
Large Diameter Water Line and Valve Replacement Pkg. 3 |
495Z,496W,496X,496Y,536A |
$14,064,000.00 |
12-14-2026(s) |
02-22-2027(s) |
|
11-19-2027(s) |
01-03-2028(s) |
03-13-2028(s) |
Panduranga Kuruva |
|
|
|
|
|
21 |
R-000267-0187-3 |
Lift Station Improvement Projects (Consent Decree) (Asbury LS, Ambrose LS, Studemont LS, Ardmore LS, Cottage Grove LS, & Stellalink LS) |
|
$24,937,272.73 |
12-15-2027(s) |
02-23-2028(s) |
|
11-19-2028(s) |
01-03-2029(s) |
03-14-2029(s) |
|
|
|
|
|
|
22 |
M-410006-0002-3 |
Arlington Heights Area Drainage Improvements Sub Project 2 |
576C,576G |
$14,723,234.00 |
12-16-2026(s) |
02-24-2027(s) |
|
03-30-2028(s) |
05-14-2028(s) |
07-23-2028(s) |
Yusherry Cang |
|
|
|
|
|
23 |
M-430296-0017-3 |
TIRZ17 Memorial City Area Detention Basin |
489D,489H,490A |
$58,500,000.00 |
12-16-2026(s) |
02-24-2027(s) |
730 |
02-23-2029(s) |
04-09-2029(s) |
06-18-2029(s) |
|
|
|
|
|
|
24 |
N-100006-0001-3 |
University Blvd Paving & Drainage Kirby Drive to Greenbriar Drive |
532H |
$6,122,000.00 |
12-16-2026(s) |
02-24-2027(s) |
|
03-30-2028(s) |
05-14-2028(s) |
07-23-2028(s) |
|
|
|
|
|
|
25 |
N-100030-0001-3 |
Antoine (North) Paving and Drainage: Victory to West Gulf Bank |
411Q,411U |
$15,573,369.06 |
12-16-2026(s) |
02-24-2027(s) |
|
03-30-2028(s) |
05-14-2028(s) |
07-23-2028(s) |
|
|
|
|
|
|
26 |
N-100030-0GEC-3 |
General Engineering Consultant (GEC) for Antoine Drive from US 290 to W Mt Houston |
411K,411L,411Q,411U,411Y,451C,451G,451L |
$113,300,000.01 |
12-16-2026(s) |
02-24-2027(s) |
|
03-30-2028(s) |
05-14-2028(s) |
07-23-2028(s) |
|
|
|
|
|
|
27 |
R-002011-090C-3 |
Neighborhood Sewer Systems Improvements Deer Ridge Estates and Fondren Gardens |
|
$0.00 |
12-23-2026(s) |
03-03-2027(s) |
|
11-28-2027(s) |
01-12-2028(s) |
03-22-2028(s) |
|
|
|
|
|
|
28 |
S-000100-0026-3 |
New/Replacement of Water Well IAH Well 4 |
374A |
$8,561,563.00 |
12-23-2026(s) |
03-03-2027(s) |
500 |
07-15-2028(s) |
08-29-2028(s) |
11-07-2028(s) |
|
|
|
|
|
|
29 |
R-000267-127A-3 |
LS Rehab Package 2: Scott #1 |
493Z |
$22,620,000.00 |
12-30-2026(s) |
03-10-2027(s) |
|
12-05-2027(s) |
01-19-2028(s) |
03-29-2028(s) |
|
|
|
|
|
|
30 |
S-000012-032B-3 |
Southeast Water Purification Plant (SEWPP) Improvements Package 2 |
577R |
$15,433,000.00 |
01-06-2027(s) |
03-17-2027(s) |
|
12-12-2027(s) |
01-26-2028(s) |
04-05-2028(s) |
Sonny Do |
|
|
|
|
|
31 |
R-001000-0031-3 |
CRMP Package 6- Area 1- Basin IB043 |
414X,454B,454C |
$88,301,600.00 |
01-08-2029(s) |
03-19-2029(s) |
|
12-14-2029(s) |
01-28-2030(s) |
04-08-2030(s) |
|
|
|
|
|
|
32 |
S-000035-0315-3 |
WLR in South Gessner Area |
570D,570H,570M,571A,571H,571E |
$0.00 |
01-10-2028(s) |
03-20-2028(s) |
|
12-15-2028(s) |
01-29-2029(s) |
04-09-2029(s) |
|
|
|
|
|
|
33 |
N-100017-0001-3 |
Gessner Street Paving and Drainage Buffalo Bayou to Richmond |
490W |
$24,742,400.00 |
01-12-2028(s) |
03-22-2028(s) |
|
04-26-2029(s) |
06-10-2029(s) |
08-19-2029(s) |
|
|
|
|
|
|
34 |
R-000536-0035-3 |
Wrightwood SSO elimination |
493C |
$2,779,000.00 |
01-12-2028(s) |
03-22-2028(s) |
|
12-17-2028(s) |
01-31-2029(s) |
04-11-2029(s) |
|
|
|
|
|
|
35 |
S-000035-0300-3 |
WLR in Interstate 10 and Market Street Subdivisions |
496L,496M,496K,496F |
$0.00 |
01-13-2028(s) |
03-23-2028(s) |
|
12-18-2028(s) |
02-01-2029(s) |
04-12-2029(s) |
|
|
|
|
|
|
36 |
N-000818-0001-3 |
Fulton Street Reconstruction from Quitman to Hogan Street |
493H |
$5,482,000.00 |
01-13-2027(s) |
03-24-2027(s) |
635 |
12-18-2028(s) |
02-01-2029(s) |
04-12-2029(s) |
|
|
|
|
|
|
37 |
N-100036-0001-3 |
Chimney Rock Road Connectivity at Fort Bend Toll Road |
571F,571K,571L |
$3,900,000.00 |
01-13-2027(s) |
03-24-2027(s) |
253 |
12-02-2027(s) |
01-16-2028(s) |
03-26-2028(s) |
Mohammad Sabzevari |
|
|
|
|
|
38 |
R-000265-0147-3 |
IAH Wastewater Treatment Plant Expansion |
373M |
$52,900,175.00 |
01-14-2026(s) |
03-25-2026(s) |
900 |
09-10-2028(s) |
10-25-2028(s) |
01-03-2029(s) |
|
|
|
|
|
|
39 |
R-000265-0161-3 |
Northbelt Wastewater Treatment Plant Improvements and Expansion |
454Y |
$71,525,000.00 |
01-17-2028(s) |
03-27-2028(s) |
720 |
03-17-2030(s) |
05-01-2030(s) |
07-10-2030(s) |
|
|
|
|
|
|
40 |
R-000265-0162-3 |
Greenridge Wastewater Treatment Plant improvements |
571X |
$15,454,545.00 |
01-18-2027(s) |
03-29-2027(s) |
364 |
03-27-2028(s) |
05-11-2028(s) |
07-20-2028(s) |
Singarpal Sekhon |
|
|
|
|
|
41 |
R-000265-0146-3 |
Sims South Wastewater Treatment Plant Improvement |
535L |
$24,682,000.00 |
01-20-2027(s) |
03-31-2027(s) |
730 |
03-30-2029(s) |
05-14-2029(s) |
07-23-2029(s) |
|
|
|
|
|
|
42 |
R-002011-091B-3 |
Neighborhood Sewer System Improvements, Package 6 Area 2 |
489C |
$7,050,000.00 |
01-20-2027(s) |
03-31-2027(s) |
|
12-26-2027(s) |
02-09-2028(s) |
04-19-2028(s) |
Sudarshan Gouni |
|
|
|
|
|
43 |
N-T01011-0001-3 |
St. George Place School Crossings Improvements/ City of Houston Systemic Safety Project (HSIP-25) |
|
$0.00 |
01-21-2026(s) |
04-01-2026(s) |
|
05-06-2027(s) |
06-20-2027(s) |
08-29-2027(s) |
|
|
|
|
|
|
44 |
R-000265-0117-3 |
Intercontinental Airport (IAH) WWTP Improvements |
373M |
$21,338,110.00 |
01-21-2026(s) |
04-01-2026(s) |
724 |
03-25-2028(s) |
05-09-2028(s) |
07-18-2028(s) |
|
|
|
|
|
|
45 |
S-000900-0173-3 |
48-inch Water Line from SH288 to Cullen Boulevard along E Orem Drive |
573J,573K,573L,573M,573Q,573R |
$25,547,100.00 |
01-21-2026(s) |
04-01-2026(s) |
655 |
01-16-2028(s) |
03-01-2028(s) |
05-10-2028(s) |
Panduranga Kuruva |
|
|
|
|
|
46 |
S-000035-0304-3 |
WLR in Melrose Park Neighborhood Area |
413Q,413U,413P,413T |
$0.00 |
01-25-2028(s) |
04-04-2028(s) |
|
12-30-2028(s) |
02-13-2029(s) |
04-24-2029(s) |
|
|
|
|
|
|
47 |
R-001000-0038-3 |
CRMP CIP Package 2 (CD Area 2 and 3) |
494L |
$128,000,000.00 |
01-25-2029(s) |
04-05-2029(s) |
|
12-31-2029(s) |
02-14-2030(s) |
04-25-2030(s) |
|
|
|
|
|
|
48 |
N-000386-001A-3 |
Tanglewood Area Street Rehab (NSR 454 B) |
491K,491L,491P,491Q |
$9,201,405.00 |
01-27-2027(s) |
04-07-2027(s) |
|
05-11-2028(s) |
06-25-2028(s) |
09-03-2028(s) |
Sam Habibi |
|
|
|
|
|
49 |
N-310662-0049-3 |
Citywide Intersection Safety Improvements (FY 16) |
000A |
$0.00 |
01-30-2019(s) |
04-10-2019(s) |
|
05-14-2020(s) |
06-28-2020(s) |
09-06-2020(s) |
|
|
|
|
|
|
50 |
S-000035-0306-3 |
WLR in Ashford South and Ashford Village Areas |
|
$0.00 |
02-03-2028(s) |
04-13-2028(s) |
|
01-08-2029(s) |
02-22-2029(s) |
05-03-2029(s) |
|
|
|
|
|
|
51 |
S-000035-0313-3 |
WLR in Oak Forest-Area A |
|
$0.00 |
02-03-2028(s) |
04-13-2028(s) |
|
01-08-2029(s) |
02-22-2029(s) |
05-03-2029(s) |
|
|
|
|
|
|
52 |
M-430220-040B-3 |
River Hollow Lane Outfall Improvements |
491R |
$0.00 |
02-03-2027(s) |
04-14-2027(s) |
|
05-18-2028(s) |
07-02-2028(s) |
09-10-2028(s) |
|
|
|
|
|
|
53 |
S-000900-0144-3 |
54-inch Water Line along Galveston Road from HCFCD Channel No B104-05-00 to Clear Lake City Water Authority Pump Station No. 3 (aka SETL Contract B) |
617H,617M,618J,618N,618T |
$31,000,500.00 |
02-03-2027(s) |
04-14-2027(s) |
540 |
10-05-2028(s) |
11-19-2028(s) |
01-28-2029(s) |
Panduranga Kuruva |
|
|
|
|
|
54 |
N-T05000-0012-3 |
Waugh Dr and Heights Blvd Safety Improvements / City of Houston Systemic Safety Project (HSIP-24) |
|
$0.00 |
02-04-2026(s) |
04-15-2026(s) |
|
05-20-2027(s) |
07-04-2027(s) |
09-12-2027(s) |
|
|
|
|
|
|
55 |
R-001000-0034-3 |
CRMP Package 9 - Areas 8 and 11 - Basins IB032 and IB022 |
495E,494A,495H |
$27,577,880.00 |
02-08-2028(s) |
04-18-2028(s) |
746 |
05-04-2030(s) |
06-18-2030(s) |
08-27-2030(s) |
|
|
|
|
|
|
56 |
S-000035-0308-3 |
WLR in UH Neighborhood |
493Z,533C,533D,533G,533H,534A,534E |
$0.00 |
02-10-2028(s) |
04-20-2028(s) |
|
01-15-2029(s) |
03-01-2029(s) |
05-10-2029(s) |
|
|
|
|
|
|
57 |
R-001000-0039-3 |
CRMP CIP Package 3 (CD Area 2 and 3) |
494L |
$303,000,000.00 |
02-09-2029(s) |
04-20-2029(s) |
1000 |
01-15-2032(s) |
02-29-2032(s) |
05-09-2032(s) |
|
|
|
|
|
|
58 |
N-310650-0086-3 |
Citywide Traffic Signal Rebuild Package #12 (FY17) |
411A |
|
02-13-2019(s) |
04-24-2019(s) |
730 |
04-23-2021(s) |
06-07-2021(s) |
08-16-2021(s) |
|
|
|
|
|
|
59 |
R-000267-0177-3 |
Lift Station Rehabilitation and Reconstruction Design FEMA - CD (Kingwood Place South LS, Golden Bear LS, Deer Springs LS, AG Farm LS, Golf Course LS) |
335H,336A,336G,336H |
$16,488,153.00 |
02-14-2027(s) |
04-25-2027(s) |
720 |
04-14-2029(s) |
05-29-2029(s) |
08-07-2029(s) |
|
|
|
|
|
|
60 |
M-410041-0001-3 |
Wheeler and MLK Detention Basins, RR Culvert, and KG Expansion |
534J,534K,534G,534F |
$20,570,000.00 |
02-14-2029(s) |
04-25-2029(s) |
|
05-30-2030(s) |
07-14-2030(s) |
09-22-2030(s) |
Prakash Luetel |
|
|
|
|
|
61 |
M-410041-0002-3 |
Kuhlman Gully Detention Basin |
534G,534F,534K |
$0.00 |
02-14-2029(s) |
04-25-2029(s) |
|
05-30-2030(s) |
07-14-2030(s) |
09-22-2030(s) |
Prakash Luetel |
|
|
|
|
|
62 |
S-000035-0302-3 |
WLR in Houston Heights (South) |
492D,452Z |
$0.00 |
02-18-2028(s) |
04-28-2028(s) |
|
01-23-2029(s) |
03-09-2029(s) |
05-18-2029(s) |
|
|
|
|
|
|
63 |
S-000035-0332-3 |
WLR in Sunnyside Area II |
|
$0.00 |
02-18-2028(s) |
04-28-2028(s) |
|
01-23-2029(s) |
03-09-2029(s) |
05-18-2029(s) |
|
|
|
|
|
|
64 |
S-000035-0299-3 |
WLR in Greater Eastwood & Second Ward |
493R,494N,494P,493V,494S |
$0.00 |
02-23-2028(s) |
05-03-2028(s) |
|
01-28-2029(s) |
03-14-2029(s) |
05-23-2029(s) |
|
|
|
|
|
|
65 |
S-000900-0180-3 |
24-Inch Water Line along West Road from Deer Trail Drive to North IH 45 (East ROW) |
412C,412D |
$7,521,149.20 |
02-23-2028(s) |
05-03-2028(s) |
310 |
03-09-2029(s) |
04-23-2029(s) |
07-02-2029(s) |
Panduranga Kuruva |
|
|
|
|
|
66 |
S-000035-0311-3 |
WLR in Memorial Neighborhod-Area B |
489B,489F |
$0.00 |
02-24-2028(s) |
05-04-2028(s) |
|
01-29-2029(s) |
03-15-2029(s) |
05-24-2029(s) |
|
|
|
|
|
|
67 |
R-001000-0035-3 |
CRMP CIP Package 4 -Replacement of Eddington LS, FM Installation, and Construction of Storage Tank and LS at Wet Weather Facility |
|
$40,693,000.00 |
02-24-2027(s) |
05-05-2027(s) |
|
01-30-2028(s) |
03-15-2028(s) |
05-24-2028(s) |
|
|
|
|
|
|
68 |
M-000126-0073-3 |
FY12 LDP Design Work Orders |
|
|
02-25-2026(s) |
05-06-2026(s) |
730 |
05-05-2028(s) |
06-19-2028(s) |
08-28-2028(s) |
Prakash Luetel |
|
|
|
|
|
69 |
S-001000-056B-3 |
LAS System at Ground Water Facilities and Chemical Improvements at Repump Stations - Package 2 |
|
$9,200,000.00 |
02-25-2026(s) |
05-06-2026(s) |
900 |
10-22-2028(s) |
12-06-2028(s) |
02-14-2029(s) |
|
|
|
|
|
|
70 |
R-001000-0033-3 |
CRMP Package 8 - Area 1- Basin IB043 |
454L,454Q,454U |
$71,907,600.00 |
02-29-2028(s) |
05-09-2028(s) |
|
02-03-2029(s) |
03-20-2029(s) |
05-29-2029(s) |
|
|
|
|
|
|
71 |
R-000267-0180-3 |
Lift Station Rehabilitation and Reconstruction Design FEMA - CD (Woodland Ridge LS, Ben's Branch LS, Elmwood Hills LS, Trail River LS, Forest Shores LS, Riverlawn LS) |
|
$23,662,227.00 |
03-03-2027(s) |
05-12-2027(s) |
720 |
05-01-2029(s) |
06-15-2029(s) |
08-24-2029(s) |
|
|
|
|
|
|
72 |
S-001000-056C-3 |
LAS System at Ground Water Facilities and Chemical Improvements at Repump Stations - Package 3 |
|
$4,452,600.00 |
03-04-2026(s) |
05-13-2026(s) |
660 |
03-03-2028(s) |
04-17-2028(s) |
06-26-2028(s) |
|
|
|
|
|
|
73 |
N-210005-0001-3 |
Roseland Area Paving and Drainage |
493W |
$8,080,833.00 |
03-16-2026(s) |
05-25-2026(s) |
630 |
02-14-2028(s) |
03-30-2028(s) |
06-08-2028(s) |
Sudarshan Gouni |
|
|
|
|
|
74 |
R-001000-0040-3 |
CRMP CIP Package 10 (Area1 - Basin IB043) |
414W |
$62,046,201.50 |
03-18-2028(s) |
05-27-2028(s) |
730 |
05-27-2030(s) |
07-11-2030(s) |
09-19-2030(s) |
|
|
|
|
|
|
75 |
R-000267-0186-3 |
Lift Station Hazard Mitigation and Improvement Projects FEMA - CD (Forest Cove Dr. #1 LS, Forest Cove Dr. #2 LS, Marina LS, Kingwood Dr. LS, Deer Ridge Estates LS, Forest Garden LS, Aqua Vista LS, River Lift Station) |
|
$20,833,333.00 |
03-22-2028(s) |
05-31-2028(s) |
|
02-25-2029(s) |
04-11-2029(s) |
06-20-2029(s) |
|
|
|
|
|
|
76 |
R-000265-0153-3 |
Keegans Bayou Wastewater Treatment Plant Improvements |
530S |
$44,000,000.00 |
03-23-2027(s) |
06-01-2027(s) |
720 |
05-21-2029(s) |
07-05-2029(s) |
09-13-2029(s) |
|
|
|
|
|
|
77 |
S-000035-0268-3 |
Watermain Replacement in Near Town-Montrose Area and Plainview Subdivision |
492Q,492R,492U,492V |
$14,213,886.00 |
03-25-2026(s) |
06-03-2026(s) |
|
02-28-2027(s) |
04-14-2027(s) |
06-23-2027(s) |
Mohammad Sabzevari |
|
|
|
|
|
78 |
S-000035-0284-3 |
Waterline Replacement in Independence Heights |
453N,453J,452R,452M,453M,453K |
$7,268,481.00 |
03-25-2026(s) |
06-03-2026(s) |
|
02-28-2027(s) |
04-14-2027(s) |
06-23-2027(s) |
|
|
|
|
|
|
79 |
N-210006-0001-3 |
Huntington Village Sec 4 Area Paving and Drainage |
528U,528V,528Y,528Z |
$15,999,000.50 |
03-29-2027(s) |
06-07-2027(s) |
1095 |
06-06-2030(s) |
07-21-2030(s) |
09-29-2030(s) |
Prakash Luetel |
|
|
|
|
|
80 |
N-100030-003A-3 |
Antoine Drive Paving & Drainage: Acorn Street to US 290 |
451G,451L |
$0.00 |
03-29-2028(s) |
06-07-2028(s) |
|
07-12-2029(s) |
08-26-2029(s) |
11-04-2029(s) |
|
|
|
|
|
|
81 |
N-100030-003C-3 |
Antoine Paving and Drainage: Cole Creek to Victory |
411U,411Y,451C |
$0.00 |
03-29-2028(s) |
06-07-2028(s) |
|
07-12-2029(s) |
08-26-2029(s) |
11-04-2029(s) |
|
|
|
|
|
|
82 |
R-000265-0159-3 |
Beltway Wastewater Treatment Plant Improvements |
529G |
$19,350,000.00 |
03-31-2027(s) |
06-09-2027(s) |
720 |
05-29-2029(s) |
07-13-2029(s) |
09-21-2029(s) |
|
|
|
|
|
|
83 |
S-000066-A011-3 |
Work order #1 for project advisor/technical consultant services for Northeast Water Purification Plant Expansion. |
377W |
$0.00 |
04-03-2013(s) |
06-12-2013(s) |
120 |
10-10-2013(s) |
11-24-2013(s) |
02-02-2014(s) |
|
|
|
|
|
|
84 |
S-000066-B011-3 |
Work Order #2 - Study System Failure @ NEWPP After Feb-2012 Storm Event |
377W |
$0.00 |
04-03-2013(s) |
06-12-2013(s) |
120 |
10-10-2013(s) |
11-24-2013(s) |
02-02-2014(s) |
|
|
|
|
|
|
85 |
S-000066-C011-3 |
Work Order #2A - Study System Failure @ NEWPP After Jun-2012 Storm Event |
377W |
$0.00 |
04-03-2013(s) |
06-12-2013(s) |
180 |
12-09-2013(s) |
01-23-2014(s) |
04-03-2014(s) |
|
|
|
|
|
|
86 |
S-000066-D011-3 |
Work Order #3 - Authority Engagement for Project Advisor/Technical Consultant Services for Northeast Water Purification Plant (NEWPP) Expansion |
377W |
$0.00 |
04-03-2013(s) |
06-12-2013(s) |
|
03-09-2014(s) |
04-23-2014(s) |
07-02-2014(s) |
|
|
|
|
|
|
87 |
M-410016-001B-3 |
Westridge and Braes Terrace Area Drainage and Paving |
532K,532N,532P,532Q,532T |
$6,491,689.00 |
04-05-2028(s) |
06-14-2028(s) |
|
07-19-2029(s) |
09-02-2029(s) |
11-11-2029(s) |
Sam Habibi |
|
|
|
|
|
88 |
S-000056-0085-3 |
East Water Purification Plant (EWPP) Mechanical & Electrical Improvements for Plant 3 |
496U,496Y |
$0.00 |
04-05-2028(s) |
06-14-2028(s) |
|
03-11-2029(s) |
04-25-2029(s) |
07-04-2029(s) |
Sonny Do |
|
|
|
|
|
89 |
S-000035-0317-3 |
WLR in Oak Forest-Area B |
451M,451R,452J,452N |
$0.00 |
04-06-2028(s) |
06-15-2028(s) |
|
03-12-2029(s) |
04-26-2029(s) |
07-05-2029(s) |
|
|
|
|
|
|
90 |
N-100010-0001-3 |
Dunlavy Paving: West Dallas to Peden |
492M,492R |
$5,769,000.00 |
04-12-2027(s) |
06-21-2027(s) |
|
07-25-2028(s) |
09-08-2028(s) |
11-17-2028(s) |
Sudarshan Gouni |
|
|
|
|
|
91 |
S-000900-0136-3 |
72-inch Water Line along Greenbriar Dr to Metro Corridor to SWPS |
491Z,492U,492W,492X,492Y |
$78,660,700.00 |
04-14-2027(s) |
06-23-2027(s) |
651 |
04-04-2029(s) |
05-19-2029(s) |
07-28-2029(s) |
Panduranga Kuruva |
|
|
|
|
|
92 |
R-000035-0028-3 |
Force Main Rehabilitation and Reconstruction Design Consent Decree - Songwood and Gessner#1 Lift Stations |
496F,490J,490N |
$5,422,000.00 |
04-22-2026(s) |
07-01-2026(s) |
|
03-28-2027(s) |
05-12-2027(s) |
07-21-2027(s) |
|
|
|
|
|
|
93 |
S-000900-0309-3 |
Professional Engineering Services for the Technical Advisor Support for the Surface Water Transmission Program |
114M |
$0.00 |
04-24-2025(p) |
07-03-2025(p) |
|
03-30-2026(p) |
05-14-2026(p) |
07-23-2026(p) |
|
|
|
|
|
|
94 |
R-000267-0185-3 |
Lift Station Hazard Mitigation and Improvement Projects FEMA- CD (Sunnyglen Dr LS, Scotts Point LS, Woodstream LS, Riverchase Trail LS, Aspen Pass LS, Covecrest LS, and Spanish Cove LS) |
338L,338L,297Q,297V,297R,338V,338Y |
$11,375,000.00 |
04-27-2028(s) |
07-06-2028(s) |
|
04-02-2029(s) |
05-17-2029(s) |
07-26-2029(s) |
|
|
|
|
|
|
95 |
R-000265-0154-3 |
Sims Bayou South Wastewater Treatment Plant Improvements Package 3 |
535L |
$56,000,000.00 |
04-28-2027(s) |
07-07-2027(s) |
515 |
12-03-2028(s) |
01-17-2029(s) |
03-28-2029(s) |
Singarpal Sekhon |
|
|
|
|
|
96 |
N-321040-075A-3 |
Hirsch Road Bridge Rehabilitation and Replacement Projects FY 22-25 |
454C |
$1,251,673.00 |
04-29-2026(s) |
07-08-2026(s) |
365 |
07-08-2027(s) |
08-22-2027(s) |
10-31-2027(s) |
Juan Rendon |
|
|
|
|
|
97 |
R-000265-0150-3 |
Northwest Wastewater Treatment Plant Improvements |
451C |
$46,850,845.00 |
04-29-2026(s) |
07-08-2026(s) |
915 |
01-08-2029(s) |
02-22-2029(s) |
05-03-2029(s) |
Singarpal Sekhon |
|
|
|
|
|
98 |
S-000200-029A-3 |
Ground Water Well Rehabilitation at Various Location - Package I |
|
$0.00 |
04-29-2026(s) |
07-08-2026(s) |
500 |
11-20-2027(s) |
01-04-2028(s) |
03-14-2028(s) |
|
|
|
|
|
|
99 |
R-002011-0091-3 |
Neighborhood Sewer Systems Improvements, Package 6 |
489C,490R,491Y,491X |
|
04-30-2025(p) |
07-09-2025(p) |
|
04-05-2026(p) |
05-20-2026(p) |
07-29-2026(p) |
Mohammad Sabzevari |
|
|
|
|
|
100 |
R-000267-0184-3 |
Lift Station Hazard Mitigation and Improvement Projects FEMA - CD (Mississippi LS, Berkley LS, Hunterwood M.U.D. LS, Ballantine LS, Minnesota LS, Kirby Drive #3 LS) |
|
$26,875,000.00 |
05-04-2028(s) |
07-13-2028(s) |
|
04-09-2029(s) |
05-24-2029(s) |
08-02-2029(s) |
|
|
|
|
|
|
101 |
S-000035-0267-3 |
Water Line Rehabilitation in Central Park and Magnolia Park Subdivisions I |
494U,494V,494Z,495S,495W |
$0.00 |
05-05-2027(s) |
07-14-2027(s) |
|
04-09-2028(s) |
05-24-2028(s) |
08-02-2028(s) |
|
|
|
|
|
|
102 |
S-001000-56B2-3 |
LAS System at Ground Water Facilities and Chemical Improvements at Repump Stations - Package 3 |
|
$4,770,900.00 |
05-13-2026(a) |
07-22-2026(a) |
830 |
10-29-2028(a) |
12-13-2028(a) |
02-21-2029(a) |
|
|
|
|
|
|
103 |
S-000035-0281-3 |
Waterline in Dissen Heights - Eastlawn Area |
494T,494X,494Y |
$11,000,000.00 |
05-13-2026(s) |
07-22-2026(s) |
|
04-18-2027(s) |
06-02-2027(s) |
08-11-2027(s) |
Mohammad Sabzevari |
|
|
|
|
|
104 |
N-100042-0002-3 |
Telephone Road: Main Street Revitalization Project (Subproject 2) |
534C,534G,534H,534M |
$18,768,600.00 |
05-19-2027(s) |
07-28-2027(s) |
|
08-31-2028(s) |
10-15-2028(s) |
12-24-2028(s) |
Yusherry Cang |
|
|
|
|
|
105 |
N-32F782-0001-3 |
IMD Bikeways from Dairy Ashford Road to Arthur Storey Park |
529J,529K,529L,528M |
$0.00 |
05-19-2027(s) |
07-28-2027(s) |
|
08-31-2028(s) |
10-15-2028(s) |
12-24-2028(s) |
Yusherry Cang |
|
|
|
|
|
106 |
R-000265-0158-3 |
White Oaks Wastewater Treatment Plant Improvements |
411N |
$17,948,717.94 |
05-19-2027(s) |
07-28-2027(s) |
720 |
07-17-2029(s) |
08-31-2029(s) |
11-09-2029(s) |
|
|
|
|
|
|
107 |
R-000267-0188-3 |
Lift Station Improvement Projects (Consent Decree) (North Houston-Rosslyn LS, Pinemont LS, Hollister LS, Windfern LS, Mitchell LS, & Northcourt LS) |
411N,451H,450D,410X,412R,410Y |
$18,605,025.00 |
05-19-2028(s) |
07-28-2028(s) |
610 |
03-30-2030(s) |
05-14-2030(s) |
07-23-2030(s) |
|
|
|
|
|
|
108 |
M-410039-0002-3 |
Drainage and Paving Improvements for Cottage Grove East, Phase II |
492C,492G |
$24,339,658.06 |
05-20-2026(s) |
07-29-2026(s) |
|
09-02-2027(s) |
10-17-2027(s) |
12-26-2027(s) |
|
|
|
|
|
|
109 |
M-420HUD-006A-3 |
DR15 6A Edgewood Park Detention Basin |
534X |
$3,500,000.00 |
05-20-2026(s) |
07-29-2026(s) |
|
09-02-2027(s) |
10-17-2027(s) |
12-26-2027(s) |
Prakash Luetel |
|
|
|
|
|
110 |
R-000265-0096-3 |
Upper Brays Wastewater Treatment Plant Improvements |
529A |
$13,884,000.00 |
05-20-2026(s) |
07-29-2026(s) |
450 |
10-22-2027(s) |
12-06-2027(s) |
02-14-2028(s) |
|
|
|
|
|
|
111 |
S-000056-084A-3 |
East Water Purification Plant (EWPP) Mechanical and Electrical Improvements for Plant 1 and 2- Package 1 |
496U,496Y |
$15,950,050.00 |
05-20-2026(s) |
07-29-2026(s) |
|
04-25-2027(s) |
06-09-2027(s) |
08-18-2027(s) |
Sonny Do |
|
|
|
|
|
112 |
S-000600-0056-3 |
Rehabilitation of Water Storage Tanks - Package 16 |
528H,299W,449U,488L |
$6,200,000.00 |
05-20-2026(s) |
07-29-2026(s) |
|
04-25-2027(s) |
06-09-2027(s) |
08-18-2027(s) |
Panduranga Kuruva |
|
|
|
|
|
113 |
R-001000-0037-3 |
CRMP CIP Package 1 (CD Area 2 and 3) |
494K,494L,494Q |
$45,000,000.00 |
05-21-2029(s) |
07-30-2029(s) |
|
04-26-2030(s) |
06-10-2030(s) |
08-19-2030(s) |
|
|
|
|
|
|
114 |
S-000035-0298-3 |
Waterline Replacement in Midtown Area |
493P,493T,493U,493X,493V |
$8,443,045.00 |
05-22-2026(s) |
07-31-2026(s) |
|
04-27-2027(s) |
06-11-2027(s) |
08-20-2027(s) |
|
|
|
|
|
|
115 |
S-001000-053B-3 |
of Facilities Improvements at Various Well Sites and Re-Pump Stations - Package 4 |
449T,449U,449L,449G,448Y,449X,449Q,528H,528K,528M,528C,489U |
$5,268,006.46 |
05-26-2027(s) |
08-04-2027(s) |
|
04-30-2028(s) |
06-14-2028(s) |
08-23-2028(s) |
|
|
|
|
|
|
116 |
M-410028-0001-3 |
Westbury Area Drainage and Paving Improvements Subproject 1 |
571A,571B,571E,571F |
$25,246,030.00 |
05-27-2026(s) |
08-05-2026(s) |
|
09-09-2027(s) |
10-24-2027(s) |
01-02-2028(s) |
|
|
|
|
|
|
117 |
R-002011-0089-3 |
Neighborhood Sewer System Improvements (AS069) |
492Q,492U,492V |
$27,035,447.00 |
05-27-2026(s) |
08-05-2026(s) |
1020 |
05-21-2029(s) |
07-05-2029(s) |
09-13-2029(s) |
|
|
|
|
|
|
118 |
M-42LHUD-0006-3 |
CDBG-MIT Frenchtown Drainage and Paving Improvements |
494A,494B,454W,454X |
$9,914,476.00 |
05-29-2026(s) |
08-07-2026(s) |
180 |
02-03-2027(s) |
03-20-2027(s) |
05-29-2027(s) |
Prakash Luetel |
|
|
|
|
|
119 |
M-430296-0018-3 |
Boone Park and Hackberry Park Detention Basins |
528M,529K |
$15,400,000.00 |
05-29-2026(s) |
08-07-2026(s) |
|
09-11-2027(s) |
10-26-2027(s) |
01-04-2028(s) |
|
|
|
|
|
|
120 |
S-000900-0143-3 |
54-inch Water Line along BW8, Duffer Ln, Perimeter Rd and Highway 3 from Grayson St to HCFCD Channel No. B104-05-00 (aka SETL Contract A) |
532U,532V,533S,533T,533U,533V |
$30,529,478.91 |
06-02-2027(s) |
08-11-2027(s) |
980 |
04-17-2030(s) |
06-01-2030(s) |
08-10-2030(s) |
Panduranga Kuruva |
|
|
|
|
|
121 |
R-000267-0172-3 |
MUD #175-1, Sherwood Oaks, Green Dolphin, and West Court Lift Stations
Renewal and Replacement |
495S,297U,336A,336B,297Z |
$16,144,741.00 |
06-03-2026(s) |
08-12-2026(s) |
720 |
08-01-2028(s) |
09-15-2028(s) |
11-24-2028(s) |
|
|
|
|
|
|
122 |
S-001000-056D-3 |
LAS System at Ground Water Facilities and Chemical Improvements at Repump Stations - Package 4 |
|
$4,291,430.00 |
06-03-2026(s) |
08-12-2026(s) |
570 |
03-04-2028(s) |
04-18-2028(s) |
06-27-2028(s) |
Sonny Do |
|
|
|
|
|
123 |
N-210015-0001-3 |
Paving and Drainage Improvements in Alief Forest South Area- Sub-Project 1 |
529J,529N |
$41,829,000.00 |
06-09-2027(s) |
08-18-2027(s) |
540 |
02-08-2029(s) |
03-25-2029(s) |
06-03-2029(s) |
Sudarshan Gouni |
|
|
|
|
|
124 |
R-000267-0176-3 |
Lift Station Rehabilitation and Reconstruction Projects(Carvel Lane Lift Station, Gulfton Lift Station, Linkwood Lift Station, Saddle Brook Lift Station, Alder Lift Station, Boonridge Lift Station) -Consent Decree |
491F,530M,531A,531K,532N,571Z |
$20,000,000.00 |
06-09-2027(s) |
08-18-2027(s) |
|
05-14-2028(s) |
06-28-2028(s) |
09-06-2028(s) |
|
|
|
|
|
|
125 |
R-000035-0032-3 |
Force Main Rehabilitation and Replacement for Trail River, Lake Village, and Bens Branch Lift Stations |
337D,336N,337F |
$0.00 |
06-14-2028(s) |
08-23-2028(s) |
|
05-20-2029(s) |
07-04-2029(s) |
09-12-2029(s) |
|
|
|
|
|
|
126 |
R-000267-0179-3 |
Lift Station Rehabilitation and Reconstruction Design (Lockwood Lift Station, South Point Lift Station, Scott #3 Lift Station, Market St. #2 Lift Station, M.U.D. #067 Lift Station, Woodforest Lift Station) - Consent Decree |
494Q,497K,496D,576Q,573G,617B |
$27,085,000.00 |
06-16-2027(s) |
08-25-2027(s) |
|
05-21-2028(s) |
07-05-2028(s) |
09-13-2028(s) |
|
|
|
|
|
|
127 |
R-000267-0181-3 |
Lift Station Rehabilitation Electrical Improvements Consent Decree |
|
$22,375,490.00 |
06-16-2027(s) |
08-25-2027(s) |
720 |
08-14-2029(s) |
09-28-2029(s) |
12-07-2029(s) |
|
|
|
|
|
|
128 |
S-000900-0304-3 |
Groundwater Reduction Plan (GRP) Conversion Waterlines Group C |
332Z,333W |
$5,178,300.00 |
06-16-2027(s) |
08-25-2027(s) |
|
05-21-2028(s) |
07-05-2028(s) |
09-13-2028(s) |
Panduranga Kuruva |
|
|
|
|
|
129 |
M-410040-0001-3 |
Braeburn Glen Area Drainage and Paving Improvements |
530P,530S,530T,530N |
$20,624,472.71 |
06-17-2026(s) |
08-26-2026(s) |
|
09-30-2027(s) |
11-14-2027(s) |
01-23-2028(s) |
Prakash Luetel |
|
|
|
|
|
130 |
M-410040-001A-3 |
Sharpstown Area Detention Pond A |
530U |
$8,382,810.44 |
06-17-2026(s) |
08-26-2026(s) |
434 |
11-03-2027(s) |
12-18-2027(s) |
02-26-2028(s) |
Prakash Luetel |
|
|
|
|
|
131 |
S-000701-0050-3 |
Large Diameter Water Line and Valves Replacement - Package 4 |
412S,412T,414U,455T,492Y,493K,493L,493Q,493R,493Y,494N,494P,494X,496Q,496U,496Y,536C |
$0.00 |
06-21-2028(s) |
08-30-2028(s) |
|
05-27-2029(s) |
07-11-2029(s) |
09-19-2029(s) |
|
|
|
|
|
|
132 |
M-420HUD-013A-3 |
DR15 13A EP Hill Park Detention Basin |
533V |
$3,809,862.00 |
06-24-2026(s) |
09-02-2026(s) |
|
10-07-2027(s) |
11-21-2027(s) |
01-30-2028(s) |
Prakash Luetel |
|
|
|
|
|
133 |
R-000265-0113-3 |
Clinton Park Wastewater Treatment Plant (WWTP) Improvements |
495Y |
$9,870,000.00 |
06-24-2026(s) |
09-02-2026(s) |
450 |
11-26-2027(s) |
01-10-2028(s) |
03-20-2028(s) |
|
|
|
|
|
|
134 |
R-000265-0151-3 |
Sims North Wastewater Treatment Plant Improvements - Package 3 |
535H |
$12,953,100.00 |
06-24-2026(s) |
09-02-2026(s) |
|
05-30-2027(s) |
07-14-2027(s) |
09-22-2027(s) |
|
|
|
|
|
|
135 |
R-000509-0041-3 |
69th Street Wastewater Treatment Plant Improvements( Package 7) |
494R |
$6,000,000.00 |
06-24-2026(s) |
09-02-2026(s) |
|
05-30-2027(s) |
07-14-2027(s) |
09-22-2027(s) |
|
|
|
|
|
|
136 |
S-001000-0054-3 |
GW Facility/Re-Pump Station/HVAC & Ventilation System Improvements at Various Locations - Package 3 |
374A,296V,488A,410R,336F,489P,489N,529B |
$14,907,000.00 |
06-24-2026(s) |
09-02-2026(s) |
290 |
06-19-2027(s) |
08-03-2027(s) |
10-12-2027(s) |
|
|
|
|
|
|
137 |
M-410015-0002-3 |
Magnolia Park Sec. 2 Area Drainage and Paving Subproject 2 |
495S,495W,495X,535A,535B |
$20,800,453.91 |
06-25-2025(s) |
09-03-2025(s) |
730 |
09-03-2027(s) |
10-18-2027(s) |
12-27-2027(s) |
Prakash Luetel |
|
|
|
|
|
138 |
S-000065-0012-3 |
Construction of New Monofil at Northeast Water Purification Plant (NEWPP) |
377W |
$43,028,477.00 |
06-30-2027(s) |
09-08-2027(s) |
|
06-04-2028(s) |
07-19-2028(s) |
09-27-2028(s) |
|
|
|
|
|
|
139 |
S-000900-0178-3 |
66-inch Water Line along Green Plaza Dr, Fallbrook Dr from Plaza Verde Dr to Greens Crossing Blvd (MUD #321) |
372U,372Y,412C |
$8,241,926.00 |
06-30-2027(s) |
09-08-2027(s) |
730 |
09-07-2029(s) |
10-22-2029(s) |
12-31-2029(s) |
Panduranga Kuruva |
|
|
|
|
|
140 |
S-000035-0305-3 |
WLR in Shady Acres |
492C,452C,452P,452Q,452S,452T,452U,452Y |
$0.00 |
07-05-2027(s) |
09-13-2027(s) |
|
06-09-2028(s) |
07-24-2028(s) |
10-02-2028(s) |
|
|
|
|
|
|
141 |
S-000035-0312-3 |
WLR in Second Ward North |
|
$0.00 |
07-05-2027(s) |
09-13-2027(s) |
|
06-09-2028(s) |
07-24-2028(s) |
10-02-2028(s) |
|
|
|
|
|
|
142 |
N-321040-A135-3 |
HSIP Safety Improvement Package No.1 |
492X,576J,533Z,493M |
$450,067.60 |
07-10-2026(s) |
09-18-2026(s) |
|
10-23-2027(s) |
12-07-2027(s) |
02-15-2028(s) |
|
|
|
|
|
|
143 |
N-321040-B135-3 |
HSIP Safety Improvement Package No.2 |
570G,570H,570L,570M,570Q,570R,531B,531F,531K,528H,528M,528R |
$2,080,011.06 |
07-10-2026(s) |
09-18-2026(s) |
|
10-23-2027(s) |
12-07-2027(s) |
02-15-2028(s) |
|
|
|
|
|
|
144 |
R-001000-0032-3 |
CRMP Package 7- Area 1- Basin IB043 |
454C,454G,454L |
$67,776,123.60 |
07-11-2028(s) |
09-19-2028(s) |
|
06-16-2029(s) |
07-31-2029(s) |
10-09-2029(s) |
|
|
|
|
|
|
145 |
S-000035-0288-3 |
Waterline Replacement in Fortbend Houston , Jensen Tidwell, Parkette And Homewood Denton Areas |
571W,571S,570Z,570V |
$14,280,000.00 |
07-14-2026(s) |
09-22-2026(s) |
|
06-19-2027(s) |
08-03-2027(s) |
10-12-2027(s) |
|
|
|
|
|
|
146 |
S-000900-0146-3 |
36-inch Water Line along Medical Center Blvd, Channel A111-00-00 and Bay Area Blvd from Galveston Rd to Beamer Rd (aka SETL Contract D) |
617Z,618T,618W,618X |
$18,217,200.00 |
07-14-2027(s) |
09-22-2027(s) |
550 |
03-25-2029(s) |
05-09-2029(s) |
07-18-2029(s) |
Panduranga Kuruva |
|
|
|
|
|
147 |
M-410013-0001-3 |
Melrose Park Sec 2 Drainage and Paving Improvements |
413P,413Q,413T,413U |
$17,686,279.43 |
07-19-2028(s) |
09-27-2028(s) |
|
11-01-2029(s) |
12-16-2029(s) |
02-24-2030(s) |
Prakash Luetel |
|
|
|
|
|
148 |
N-100042-0001-3 |
Telephone Road: Main Street Revitalization Project (Subproject 1) |
494X,534B,534C |
$5,343,300.00 |
07-22-2026(s) |
09-30-2026(s) |
1070 |
09-04-2029(s) |
10-19-2029(s) |
12-28-2029(s) |
Yusherry Cang |
|
|
|
|
|
149 |
S-000035-0270-3 |
Watermain Replacement in Second Ward Area |
494N,494P,494S,494T |
$13,561,527.00 |
07-22-2026(s) |
09-30-2026(s) |
|
06-27-2027(s) |
08-11-2027(s) |
10-20-2027(s) |
Mohammad Sabzevari |
|
|
|
|
|
150 |
R-000265-0168-3 |
Wastewater Treatment Plant Hazard Mitigation _ WCID 76 WWTP (FN 485) FEMA - CD |
415E |
$27,500,000.00 |
07-26-2028(s) |
10-04-2028(s) |
|
07-01-2029(s) |
08-15-2029(s) |
10-24-2029(s) |
|
|
|
|
|
|
151 |
R-000265-0160-3 |
Chocolate Bayou Wastewater Treatment Plant improvements |
574E |
$27,504,546.00 |
08-04-2027(s) |
10-13-2027(s) |
872 |
03-03-2030(s) |
04-17-2030(s) |
06-26-2030(s) |
Singarpal Sekhon |
|
|
|
|
|
152 |
S-000035-0303-3 |
WLR in Texas Medical Center (TMC) Area |
532D,532G,532H,532L,532M,532Q,532R,532V,533A,533E,533F,533J,533K,533N,533P,533S,533S,533T |
$0.00 |
08-04-2027(s) |
10-13-2027(s) |
|
07-09-2028(s) |
08-23-2028(s) |
11-01-2028(s) |
|
|
|
|
|
|
153 |
S-000900-0147-3 |
24-Inch Water Line along the Easement parallel to Highway 3 from Fuqua Street to Dixie Farm Road FM1959 (aka SETL Contract E) |
576R,577N,577S,577X |
$12,857,330.31 |
08-05-2026(s) |
10-14-2026(s) |
683 |
08-27-2028(s) |
10-11-2028(s) |
12-20-2028(s) |
Panduranga Kuruva |
|
|
|
|
|
154 |
S-000900-0139-3 |
24-inch Water Line from Sunbeam Street to E Orem Drive along Martin Luther King Jr. Boulevard |
573H,573M |
$15,218,578.00 |
08-12-2026(s) |
10-21-2026(s) |
340 |
09-26-2027(s) |
11-10-2027(s) |
01-19-2028(s) |
Panduranga Kuruva |
|
|
|
|
|
155 |
M-430241-011G-3 |
SWPS-FWS Work Order 7 [DESIGN] |
|
$0.00 |
08-14-2019(s) |
10-23-2019(s) |
|
11-26-2020(s) |
01-10-2021(s) |
03-21-2021(s) |
|
|
|
|
|
|
156 |
R-000267-178A-3 |
Lift Station Rehabilitation and Reconstruction Design (Trailwood Lift Station and Lake Village Lift Station) |
|
$0.00 |
08-18-2027(s) |
10-27-2027(s) |
|
07-23-2028(s) |
09-06-2028(s) |
11-15-2028(s) |
Singarpal Sekhon |
|
|
|
|
|
157 |
R-001000-0036-3 |
CRMP CIP Package 5 - Sanitary Sewer Improvements Upstream of Eddington LS
|
534C,494Y,494X |
$0.00 |
08-20-2027(s) |
10-29-2027(s) |
|
07-25-2028(s) |
09-08-2028(s) |
11-17-2028(s) |
|
|
|
|
|
|
158 |
N-100024-0001-3 |
Hirsch: Laura Koppe to Crosstimbers Paving and Drainage Improvements |
454F,454K |
$9,929,187.00 |
08-25-2027(s) |
11-03-2027(s) |
|
12-07-2028(s) |
01-21-2029(s) |
04-01-2029(s) |
Mohammad Sabzevari |
|
|
|
|
|
159 |
N-321040-075B-3 |
Pedestrian Bridge Replacement over HCFCD Channels |
532F,530Z,573C,337B |
$2,442,515.00 |
08-26-2026(s) |
11-04-2026(s) |
|
12-09-2027(s) |
01-23-2028(s) |
04-02-2028(s) |
|
|
|
|
|
|
160 |
M-000295-0001-3 |
Scott Street (OST to Brays Bayou) Area Drainage and Paving Improvements |
533K,533L,533M,533P,533Q,533T,533U |
$8,590,000.00 |
09-06-2028(s) |
11-15-2028(s) |
|
12-20-2029(s) |
02-03-2030(s) |
04-14-2030(s) |
Prakash Luetel |
|
|
|
|
|
161 |
S-000056-0084-3 |
East Water Purification Plant (EWPP) Mechanical and Electrical Improvements for Plant 1 and 2 - Package 2 |
496U,496Y |
$57,589,840.00 |
09-08-2027(s) |
11-17-2027(s) |
|
08-13-2028(s) |
09-27-2028(s) |
12-06-2028(s) |
Sonny Do |
|
|
|
|
|
162 |
S-000900-0149-3 |
54-inch Water Line along Genoa Red Bluff and Easements from SEWPP to Grayson St (aka SETL Contract G) |
577L,577M,577P,577Q,577R |
$17,000,000.00 |
09-08-2027(s) |
11-17-2027(s) |
365 |
11-16-2028(s) |
12-31-2028(s) |
03-11-2029(s) |
Panduranga Kuruva |
|
|
|
|
|
163 |
N-100008-0001-3 |
Fondren Road Paving and Drainage: Braeswood to Creekbend |
530V,530Z |
$15,780,407.00 |
09-09-2027(s) |
11-18-2027(s) |
|
12-22-2028(s) |
02-05-2029(s) |
04-16-2029(s) |
|
|
|
|
|
|
164 |
N-100021-0001-3 |
Fondren Paving and Drainage from Creekbend to W. Airport |
530Y,530Z,570C,570D,570G,570H |
$25,719,952.00 |
09-09-2027(s) |
11-18-2027(s) |
|
12-22-2028(s) |
02-05-2029(s) |
04-16-2029(s) |
|
|
|
|
|
|
165 |
S-000035-0307-3 |
WLR in Shadowbriar and Southlake Areas |
488V,489S |
$14,833,962.00 |
09-15-2027(s) |
11-24-2027(s) |
|
08-20-2028(s) |
10-04-2028(s) |
12-13-2028(s) |
|
|
|
|
|
|
166 |
S-000035-0314-3 |
WLR in Sunnyside Area |
533Y,573C |
$0.00 |
09-16-2027(s) |
11-25-2027(s) |
|
08-21-2028(s) |
10-05-2028(s) |
12-14-2028(s) |
|
|
|
|
|
|
167 |
M-410024-0001-3 |
Southland Area Drainage and Paving Improvements Subproject 1 |
533L,533Q |
|
09-17-2025(p) |
11-26-2025(p) |
|
12-31-2026(p) |
02-14-2027(p) |
04-25-2027(p) |
Prakash Luetel |
|
|
|
|
|
168 |
R-000267-0178-3 |
Lift Station Rehabilitation and Reconstruction Design(Heather Ridge Lift Station, M.C.M.U.D. #58 Lift Station, Will Clayton Lift Station, Trailwood Lift Station, Shady Maples Lift Station, Lake Village Lift Station, Brookdale Lift Station) |
375J,296W,375A,336C,297N,336B,297S |
$11,600,000.00 |
09-17-2027(s) |
11-26-2027(s) |
720 |
11-15-2029(s) |
12-30-2029(s) |
03-10-2030(s) |
|
|
|
|
|
|
169 |
S-000035-0316-3 |
WMR in Spring Branch East, District 73 along Halifax, EBS, Court, Hiram, and South Areas
|
338Y,338Z,378D,451X,451Y,451Z,491C,492A,493R,494N,494P,494S,496D,496H,497A,611C,611D,611H |
$0.00 |
09-20-2027(s) |
11-29-2027(s) |
|
08-25-2028(s) |
10-09-2028(s) |
12-18-2028(s) |
|
|
|
|
|
|
170 |
S-000900-0310-3 |
42-inch Fuqua Line Extension from SH 288 to Hiram Clarke Rd |
571M,572J,572K,572L,572M,573J |
$44,090,909.09 |
09-20-2028(s) |
11-29-2028(s) |
|
08-26-2029(s) |
10-10-2029(s) |
12-19-2029(s) |
Panduranga Kuruva |
|
|
|
|
|
171 |
S-000900-0181-3 |
66-inch Water Line along Veterans Memorial Drive |
412C,412F,412K |
$8,482,650.00 |
09-22-2026(s) |
12-01-2026(s) |
448 |
02-22-2028(s) |
04-07-2028(s) |
06-16-2028(s) |
Panduranga Kuruva |
|
|
|
|
|
172 |
S-000900-0182-3 |
66-inch Water Line along Veteran Memorial Drive and West Gulf Bank Rd, from TX-249 to Ella Blvd |
412K,412P |
$9,636,000.00 |
09-22-2026(s) |
12-01-2026(s) |
|
08-28-2027(s) |
10-12-2027(s) |
12-21-2027(s) |
Panduranga Kuruva |
|
|
|
|
|
173 |
S-000035-0309-3 |
WLR in Memorial Neighborhood-Area A |
489E,489A |
$14,991,442.00 |
09-22-2027(s) |
12-01-2027(s) |
|
08-27-2028(s) |
10-11-2028(s) |
12-20-2028(s) |
|
|
|
|
|
|
174 |
S-000900-0179-3 |
66-inch Water Line along Greens Crossing Blvd, Channel No. P118-30-01, from Tall Pine Valley Dr to Turney Dr |
412C,412G |
$11,511,496.36 |
09-23-2026(s) |
12-02-2026(s) |
|
08-29-2027(s) |
10-13-2027(s) |
12-22-2027(s) |
Panduranga Kuruva |
|
|
|
|
|
175 |
M-430220-040A-3 |
Market Street Storm Sewer Rehab Project |
496K,496M |
$4,141,000.00 |
09-25-2026(s) |
12-04-2026(s) |
|
01-08-2028(s) |
02-22-2028(s) |
05-02-2028(s) |
|
|
|
|
|
|
176 |
R-002011-091C-3 |
Neighborhood Sewer Systems Improvements, Package 6 Area 3 |
490R |
$2,000,000.00 |
10-07-2026(s) |
12-16-2026(s) |
|
09-12-2027(s) |
10-27-2027(s) |
01-05-2028(s) |
Sudarshan Gouni |
|
|
|
|
|
177 |
S-000701-0041-3 |
Miscellaneous Large Diameter Waterline Improvements - Pkg 3 |
412S,412T,454N,455Y,491Y,491Z,532V,534D,535A,535F,535G,535K,535L,570H,571E,571J,576R |
$19,782,500.00 |
10-07-2026(s) |
12-16-2026(s) |
2047 |
07-24-2032(s) |
09-07-2032(s) |
11-16-2032(s) |
Panduranga Kuruva |
|
|
|
|
|
178 |
S-000900-0305-3 |
Groundwater Reduction Plan (GRP) Conversion Waterlines NW Area Group B |
372Q,372S,372T,372U,371V,372P,372V,371S,371T,371V |
$2,121,000.00 |
10-13-2027(s) |
12-22-2027(s) |
375 |
12-31-2028(s) |
02-14-2029(s) |
04-25-2029(s) |
Panduranga Kuruva |
|
|
|
|
|
179 |
M-410016-001A-3 |
Westridge and Braes Terrace Area Drainage and Paving Improvements Phase 1A |
532N,532P |
$9,177,000.00 |
10-14-2026(s) |
12-23-2026(s) |
|
01-27-2028(s) |
03-12-2028(s) |
05-21-2028(s) |
Sam Habibi |
|
|
|
|
|
180 |
N-210008-0001-3 |
Gray and Taft Area Paving and Drainage |
493N,493P |
$7,455,717.94 |
10-14-2026(s) |
12-23-2026(s) |
180 |
06-21-2027(s) |
08-05-2027(s) |
10-14-2027(s) |
Mohammad Sabzevari |
|
|
|
|
|
181 |
R-000265-0166-3 |
Kingwood West Wastewater Treatment Plant Hazard Mitigation -FEMA-CD |
|
$43,125,000.00 |
10-18-2028(s) |
12-27-2028(s) |
|
09-23-2029(s) |
11-07-2029(s) |
01-16-2030(s) |
|
|
|
|
|
|
182 |
R-000265-0163-3 |
Cedar Bayou Wastewater Treatment Plant improvements and Expansion - FEMA |
298Y,298Z,378C |
$113,058,966.00 |
10-22-2027(s) |
12-31-2027(s) |
|
09-26-2028(s) |
11-10-2028(s) |
01-19-2029(s) |
|
|
|
|
|
|
|