Construction Bench Mark 18 Months Report: Projects in Construction Report Date: 10-31-2026
|
| No. |
WBS No |
Project Name |
Key Map |
Project Estimate |
Date of Award |
Forecast NTP |
Substantial Comp Date |
Forecast Final Comp |
Forecast Accept Work |
Managing Engineer |
Project Manager |
CM and I |
Contractor |
Senior Inspector |
Inspector |
| 1 |
R-000265-131A-4 |
FWSD#23 WWTP Improvements, North |
455F,455G |
$6,256,270.00 |
04-24-2024(a) |
06-03-2024(a) |
10-30-2026(s) |
11-30-2026(s) |
03-17-2027(s) |
Singarpal Sekhon |
Adam Sabzevari |
|
Reytec Construction Resources, Inc. |
Jeremy Garcia |
Oluwaseun Ogunlala |
| 2 |
N-321040-0153-4 |
FY2025 Asphalt Overlay Rehab Project #5 |
|
$13,838,028.75 |
07-17-2025(a) |
02-09-2026(a) |
|
|
|
Summer Lindsay |
Adrian Carter |
Omega Engineers, Inc. |
JFT Construction, Inc. |
Tony Childress |
Donald Ford |
| 3 |
M-43M010-0001-4 |
FY 2025 Ditch Maintenance Work Order Contract) |
|
$1,400,000.00 |
() |
03-10-2025(a) |
|
10-22-2025(a) |
01-14-2026(a) |
Lagnesh Varshney |
Adrian Carter |
|
DL Glover Utilities, LLC |
Tony Childress |
Jerry Davidson |
| 4 |
N-321040-0161-4 |
FY 2026 Asphalt Overlay Work Order Contract # 2 |
|
$43,968,319.40 |
() |
04-13-2026(a) |
|
|
|
Summer Lindsay |
Adrian Carter |
Omega Engineers, Inc. |
SER Construction Partners, LLC. |
Tony Childress |
Tony Childress |
| 5 |
S-000900-0172-4 |
48-Inch Water Line Along Orem Drive and Martindale Road, from Almeda Genoa Road to Cullen Boulevard |
574V,574U,574T,574S |
$25,130,385.68 |
04-23-2025(a) |
12-10-2025(a) |
04-04-2027(s) |
05-04-2027(s) |
08-18-2027(s) |
Panduranga Kuruva |
Ahmad Fahim Hedayat |
Lloyd, Smitha & Associates, LLC |
SER Construction Partners, LLC. |
Carl Smitha |
Michael Hughey |
| 6 |
M-410015-001B-4 |
Magnolia Park Sec. 2 Area Drainage and Paving Improvements Phase 1B |
495W,495X |
$15,255,728.35 |
() |
04-01-2024(a) |
02-13-2026(s) |
|
|
Sam Habibi |
Ahmed Siddiqui |
FCM Engineers |
Main Lane Industries |
Robert Toliver |
Robert Toliver |
| 7 |
N-321040-075A-4 |
Hirsch Road Bridge Replacement Over HCFCD Ditch 19 DD#6 |
454C |
$1,013,677.00 |
() |
|
|
|
|
Sam Habibi |
Ahmed Siddiqui |
|
MC2 Civil, LLC |
|
|
| 8 |
S-000700-0087-4 |
Misc Small Diameter Waterline, Fire Hydrant and Valve Rehabilitation and Repairs |
|
$7,185,324.30 |
() |
02-06-2025(a) |
|
|
|
|
Alejandro Rodriguez |
|
V&S Construction |
Tremayne Hardeman |
Jonathan Martin |
| 9 |
S-000700-0096-4 |
Misc SDWL, FH, Valve Rehab & Repairs |
|
$10,290,000.00 |
() |
05-09-2025(a) |
|
|
|
James Wilson |
Alejandro Rodriguez |
|
TEXKOTA ENTERPISES, LLC |
|
|
| 10 |
S-000700-0088-4 |
Misc Small Diameter Waterline, Fire Hydrant and Valve Rehabilitation and Repairs for Kingwood Area |
|
$7,181,486.65 |
() |
06-23-2025(a) |
|
|
|
|
Alejandro Rodriguez |
Othon, Inc. |
T Construction L.L.C. |
Anthony Coleman |
Masoud Taher |
| 11 |
S-000700-0108-4 |
Misc. SDWL, FH, Valve Rehab & Repair |
|
$15,000,000.00 |
() |
07-08-2026(a) |
|
|
|
James Wilson |
Alejandro Rodriguez |
V&S Construction |
V&S Construction |
Tremayne Hardeman |
|
| 12 |
S-000700-0095-4 |
Misc SDWL, FH, Valve Rehab & Repairs |
|
$8,863,887.64 |
() |
07-09-2025(a) |
|
|
|
James Wilson |
Alejandro Rodriguez |
|
Lopez Utilities, LLC |
Anthony Coleman |
|
| 13 |
S-000700-0098-4 |
Misc SDWL, FH, Valve Rehab & Repairs |
|
$11,550,000.00 |
() |
07-14-2025(a) |
|
|
|
James Wilson |
Alejandro Rodriguez |
|
TEXKOTA ENTERPISES, LLC |
|
|
| 14 |
S-000700-0090-4 |
MISC SDWL, FH, VALVE REHABILITATION AND REPAIR - PACKAGE 2 |
|
$26,676,968.22 |
() |
07-21-2025(a) |
|
|
|
|
Alejandro Rodriguez |
|
Reytec Construction Resources, Inc. |
|
Anthony Goodman |
| 15 |
S-000700-0094-4 |
Misc SDWL, FH, Valve Rehab & Repairs |
|
$11,161,129.66 |
() |
07-21-2025(a) |
|
|
|
James Wilson |
Alejandro Rodriguez |
|
T Construction L.L.C. |
|
|
| 16 |
S-000700-0092-4 |
Misc SDWL, FH Valve Rehabilitation and Repair - Package III |
|
$6,657,363.58 |
() |
09-17-2025(a) |
|
|
|
|
Alejandro Rodriguez |
|
V&S Construction |
Walter Robinett |
Delfred Broussard |
| 17 |
S-000700-0093-4 |
Misc SDWL, FH and Valve rehab and Repairs - Package IV |
|
$4,445,470.65 |
() |
10-28-2025(a) |
|
|
|
|
Alejandro Rodriguez |
|
TEXKOTA ENTERPISES, LLC |
Tremayne Hardeman |
Kimberly Lewis |
| 18 |
S-000700-0082-4 |
Miscellaneous Small Diameter Waterline, Fire Hydrant, Valve Rehabilitation and Repairs |
|
$5,000,000.00 |
() |
11-21-2024(a) |
|
|
|
James Wilson |
Alejandro Rodriguez |
|
TEXKOTA ENTERPISES, LLC |
Tremayne Hardeman |
Jonathan Martin |
| 19 |
S-000700-0083-4 |
Miscellaneous Small Diameter Waterline, Fire Hydrant, Valve Rehabilitation and Repairs |
|
$5,000,000.00 |
() |
11-21-2024(a) |
|
|
|
James Wilson |
Alejandro Rodriguez |
|
TEXKOTA ENTERPISES, LLC |
Tremayne Hardeman |
Jonathan Martin |
| 20 |
S-000700-0074-4 |
Work Order Construction Contract for Small Diameter Water Lines |
529K |
$2,800,000.00 |
10-25-2022(a) |
07-03-2023(a) |
|
|
|
|
Alissa Hardy |
|
Reliance Construction Services, L.P. |
Tony Childress |
Tony Childress |
| 21 |
N-321040-0123-4 |
FY2023 Asphalt Overlay Rehab Package #2 |
|
$9,618,008.00 |
() |
07-17-2024(a) |
|
|
|
Patricia Campbell |
Alissa Hardy |
Omega Engineers, Inc. |
Tikon Group Inc. |
Tony Childress |
Alex Aguilar-COH |
| 22 |
N-321040-0155-4 |
FY2025 Asphalt Overlay Rehab Package #4 |
|
$7,691,995.00 |
() |
12-01-2025(a) |
|
|
|
Patricia Campbell |
Alissa Hardy |
Omega Engineers, Inc. |
JFT Construction, Inc. |
Tony Childress |
ERIC SOLOMON |
| 23 |
N-001204-001B-4 |
METRO Rail Southeast Corridor, Segment 1B |
534E,534F,534J,534K |
$0.01 |
() |
02-15-2010(a) |
|
|
|
Thomas Artz |
Alvin Watts |
Lloyd, Smitha & Associates, LLC |
Houston Rapid Transit JV |
Julius Lovelady |
Diane Marsh |
| 24 |
N-001204-001A-4 |
METRO Rail Southeast Corridor, Segment 1A |
534J,534K |
$0.01 |
() |
05-03-2010(a) |
|
|
|
Thomas Artz |
Alvin Watts |
Lloyd, Smitha & Associates, LLC |
Houston Rapid Transit JV |
Julius Lovelady |
Diane Marsh |
| 25 |
N-001204-001C-4 |
METRO Rail Southeast Corridor, Segment 1C |
534A,534E |
$0.01 |
() |
05-03-2010(a) |
|
|
|
Thomas Artz |
Alvin Watts |
IDC, Inc. |
Houston Rapid Transit JV |
Julius Lovelady |
Diane Marsh |
| 26 |
S-000056-084A-4 |
East Water Purification Plant (EWPP) Mechanical and Electrical Improvements for Plant 1 and 2- Package 1 |
496U,496Y |
$13,445,607.00 |
06-17-2026(a) |
08-17-2026(a) |
02-10-2029(s) |
03-09-2029(s) |
06-27-2029(s) |
Tina Yao |
Amer Amari |
|
Industrial Texas Corporation |
Mack Nosrat |
Sean Felton |
| 27 |
S-000056-0079-4 |
EWPP: Installation of Vertical Flocculators at Plant 3, Implementation of Energy Optimization Tool at Plant 3 Transfer Pump Station and other Improvements at Plants 1, 2 and 3 |
496U,496Y |
$21,245,658.00 |
09-23-2020(a) |
12-07-2020(a) |
01-29-2027(s) |
02-23-2027(s) |
06-23-2027(s) |
Tina Yao |
Amer Amari |
|
Industrial Texas Corporation |
Jeremy Garcia |
Oluwaseun Ogunlala |
| 28 |
S-000020-0092-4 |
Construction Management and Inspection Services for Small Diameter Waterlines |
|
$5,000,000.00 |
() |
04-23-2025(a) |
|
|
|
James Wilson |
Anthony Coleman |
|
Othon, Inc. |
Richard White-Othon |
James Middleton |
| 29 |
S-000MAO-0057-4 |
Drinking Water Sampling Station On-Call Installation |
|
$2,011,000.00 |
() |
09-26-2025(a) |
|
|
|
Khanh Kim |
Anthony Coleman |
Othon, Inc. |
Reytec Construction Resources, Inc. |
Alejandro Rodriguez |
Walter Robinett |
| 30 |
S-000700-0097-4 |
Misc. SDWL, FH, Valve Rehab & Repair |
|
$5,000,000.00 |
() |
|
|
|
|
James Wilson |
Anthony Coleman |
|
|
|
|
| 31 |
S-000700-0097-4 |
Misc SDWL, FH, Valve Rehab & Repairs |
|
$5,000,000.00 |
() |
|
|
|
|
James Wilson |
Anthony Coleman |
|
|
|
|
| 32 |
S-001000-0042-4 |
GW Facility/Re-Pump Station/HVAC & Ventilation System Improvements at Various Locations - Package 1 |
297V,336E,409N,412S,490Y,529L |
$11,920,200.00 |
10-07-2020(a) |
02-01-2021(a) |
10-29-2026(s) |
11-11-2026(s) |
01-21-2027(s) |
Tina Yao |
Antonio Hall |
|
LEM Construction Co., Inc. |
Jeremy Garcia |
Amir Jahromi |
| 33 |
S-000100-0029-4 |
New/Replacement of Water Well Sharpstown-2 Well 5 |
530E |
$8,092,526.01 |
06-18-2024(a) |
08-12-2024(a) |
05-10-2027(s) |
06-14-2027(s) |
11-18-2027(s) |
Tina Yao |
Antonio Hall |
Lloyd, Smitha & Associates, LLC |
Servox, LLC |
Ben Barajas |
Michael Hughey |
| 34 |
S-000100-0028-4 |
New/Replacement of Water Well Sims Bayou 8 |
571J |
$8,058,900.00 |
06-17-2025(a) |
09-02-2025(a) |
12-21-2027(s) |
01-20-2027(s) |
04-22-2027(s) |
Tina Yao |
Antonio Hall |
FCM Engineers |
Weisinger Incorporated |
Gregory Johnson |
Sabastine Ezenwa |
| 35 |
S-000100-0025-4 |
New/Replacement of Water Well Southwest Well 13 |
490Z |
$4,354,500.00 |
07-26-2023(a) |
09-25-2023(a) |
04-17-2026(s) |
11-10-2026(s) |
02-04-2027(s) |
Tina Yao |
Antonio Hall |
Middleton Brown, LLC |
Weisinger Incorporated |
Robert Toliver |
Donald Hawkins |
| 36 |
S-000056-0082-4 |
EWPP Plant 3 Administration Building Renovation |
496U,496Y |
$6,560,671.87 |
10-02-2019(a) |
11-18-2019(a) |
11-15-2024(s) |
10-23-2026(a) |
01-21-2027(s) |
Tina Yao |
Antonio Hall |
|
Gadberry Construction Company, Inc |
Jeremy Garcia |
Amir Jahromi |
| 37 |
S-001000-0050-4 |
4017 Campbell Road New Building Construction |
450K |
$1,885,433.34 |
10-02-2019(a) |
11-18-2019(a) |
10-17-2022(s) |
10-23-2026(a) |
01-21-2027(s) |
Tina Yao |
Antonio Hall |
|
Gadberry Construction Company, Inc |
Antonio Hall |
Abdoul Diallo |
| 38 |
N-000611-0054-4 |
BU 90U: IH-610 to East of Mesa |
455Y,455U |
$0.01 |
() |
04-27-2016(a) |
|
|
|
Addie Jackson |
Archie Blanco |
|
|
Abdreas Moreno |
Abdreas Moreno |
| 39 |
N-TX1319-0002-4 |
Hempstead Rd.: West of 12th Street to West of Washington / Old Katy Split (TxDOT-CSJ 8170-12-001) |
452W,492A |
$0.01 |
() |
06-19-2017(a) |
|
|
|
Thomas Artz |
Archie Blanco |
|
|
Keith Phillips |
Keith Phillips |
| 40 |
N-140002-0001-4 |
Hollister Road @ Proetzel's Branch Bridge Replacement |
450V |
$0.01 |
() |
09-14-2016(a) |
|
|
|
Thomas Artz |
Archie Blanco |
|
|
Keith Phillips |
Keith Phillips |
| 41 |
N-140004-0001-4 |
ILA: Windfern Road Bridge at Cole Creek (TxDOT-BRINSAP) |
410S |
$0.01 |
() |
09-14-2016(a) |
|
02-01-2018(a) |
|
Thomas Artz |
Archie Blanco |
|
|
Keith Phillips |
Keith Phillips |
| 42 |
N-240001-0001-4 |
ILA: Westerland Dr Bridge at HCFCD Ditch (TxDOT BRINSAP) |
490T |
$0.01 |
() |
09-14-2016(a) |
|
02-01-2018(a) |
|
Thomas Artz |
Archie Blanco |
|
|
Keith Phillips |
Keith Phillips |
| 43 |
N-000787-0001-4 |
Clinton Drive - Port of Houston Gate No 8 to IH 610 |
495N,495T,495U,495Y |
$0.01 |
() |
|
|
|
|
Thomas Artz |
Archie Blanco |
|
|
|
|
| 44 |
N-001310-0001-4 |
WEST AIRPORT BLVD: FROM HIRAM CLARK TO FM 521 |
572E,572F,572G |
$6,700,000.00 |
() |
|
|
|
|
Patricia Campbell |
Archie Blanco |
|
James Construction Group, LLC |
Keith Phillips |
Terry Ivy |
| 45 |
N-TX0069-0001-4 |
Water and Wastewater Relocations at IH-69 / IH-610 Direct Connectors. |
491Y,491Z,531C,531D |
$0.01 |
() |
|
|
|
|
Patricia Campbell |
Archie Blanco |
|
Cobb, Fendley & Associates, Inc. |
Keith Phillips |
ADRIAN FLEITES |
| 46 |
S-000521-0073-4 |
Waterline Relocation Associated With IH45 0.98 Miles South of FM2351 to South of Medical Center Dr. (TXDOT-CSJ-0500-03-542) |
617L,617Q,617R,617V,617Z,618S,618W |
$0.01 |
() |
|
|
|
|
Thomas Artz |
Archie Blanco |
|
|
ADRIAN FLEITES |
Bruce May |
| 47 |
N-321040-0139-4 |
Traffic Signal Work Order FY25 #1 |
|
$4,909,491.20 |
() |
04-15-2026(a) |
|
|
|
Nina Joshi |
Augustus Donaldson |
|
Traffic Systems Construction, Inc. |
Augustus Donaldson |
Hector Carpio |
| 48 |
N-310650-0083-4 |
Citywide Traffic Signal Rebuild Package #10 |
454E,493U,414R,529V,573D,576S,453R |
$4,118,460.10 |
03-27-2018(a) |
09-17-2018(a) |
03-20-2020(s) |
03-26-2021(s) |
02-17-2023(s) |
Colin Lupold |
Augustus Donaldson |
Ergonomic Transportation Solution, Inc. |
Traffic Systems Construction, Inc. |
Joe Hanak |
Augustus Donaldson |
| 49 |
N-310650-0078-4 |
Citywide Traffic Signal Rebuild Package #7 |
374D,533N,493X,493Y,533H,534E,489X,529C,490W,489Z,531B,571J,531X,571U,571M |
$2,476,282.25 |
05-13-2015(a) |
10-05-2015(a) |
08-22-2019(s) |
07-20-2018(s) |
03-24-2023(s) |
Jorge Palacios |
Augustus Donaldson |
|
Traffic Systems Construction, Inc. |
Jorge Palacios |
|
| 50 |
N-310650-0079-4 |
Citywide Traffic Signal Rebuild Package #8 |
374D,533N,493X,493Y,533H,534E,489X,529C,490W,489Z,531B,571J,531X,571U,571M |
$3,529,840.37 |
06-03-2015(a) |
10-12-2015(a) |
04-20-2020(s) |
06-16-2018(s) |
02-17-2023(s) |
Nina Joshi |
Augustus Donaldson |
|
Traf-Tex,Inc |
Augustus Donaldson |
John Thomas |
| 51 |
S-000600-0055-4 |
Rehabilitation of Water Storage Tanks - Package 15 |
491Z,370E,370K,372T,372P,372Q,336T |
$5,139,750.00 |
01-15-2025(a) |
03-31-2025(a) |
04-10-2027(s) |
05-25-2027(s) |
08-18-2027(s) |
Tina Yao |
Azhar Patankar |
|
CFG Industries, LLC |
Mack Nosrat |
Mark Gonzalez |
| 52 |
S-000600-0054-4 |
Rehabilitation of Water Storage Tanks - Package 14 |
336C,336G,297N,297Z,297V,448W,447W,611D |
$4,823,400.00 |
06-12-2024(a) |
08-12-2024(a) |
01-09-2027(s) |
02-09-2027(s) |
04-28-2027(s) |
Tina Yao |
Azhar Patankar |
|
CFG Industries, LLC |
Mack Nosrat |
Mark Gonzalez |
| 53 |
S-000600-0056-4 |
Rehabilitation of Water Storage Tanks - Package 16 |
528H,299W,449U,488L |
$4,751,530.00 |
() |
|
|
|
|
Tina Yao |
Azhar Patankar |
|
Cromcfg |
|
|
| 54 |
M-410014-0001-4 |
Wynnewood Acres Area Drainage and Paving Improvements |
456S,456T |
$12,620,511.00 |
12-19-2023(a) |
06-24-2024(a) |
06-11-2026(s) |
09-10-2026(a) |
04-20-2027(s) |
Yusherry Cang |
Bashar Khalil |
ARKK Engineers, LLC |
Main Lane Industries |
Ben Barajas |
Curt Lee - ARKK |
| 55 |
R-000265-144B-4 |
Keegans Bayou-Northwest-Chocolate Bayou WWTP Bar Screen and Grating Replacement |
529A,574E,451C |
$2,610,750.00 |
() |
04-05-2021(a) |
07-28-2023(s) |
|
|
Shannon Dunne |
Bintuan Zhu |
|
LEM Construction Co., Inc. |
Bintuan Zhu |
Bintuan Zhu |
| 56 |
R-000035-0001-4 |
Sanitary Sewer Force Main R/R - Eppes, Frawley & Bintliff Force Mains |
530G,530H,530L,453V,453U,494R,534H,534M,534R |
$12,846,780.30 |
06-11-2014(a) |
02-16-2015(a) |
01-13-2017(s) |
09-15-2017(a) |
12-13-2017(s) |
Hien Pham |
Brian Alcott |
Jacobs Project Management Company |
Huff & Mitchell, Inc. |
Mike Beezley |
Wanda Kegley |
| 57 |
N-320445-0002-4 |
Work Order Bridge Rehab/ Replacement |
|
$850,000.00 |
06-30-2014(a) |
08-28-2014(a) |
02-28-2017(s) |
04-20-2017(a) |
07-12-2017(s) |
Hien Pham |
Brian Alcott |
|
ISI Contracting, Inc. |
Mike Beezley |
Roland Joubert |
| 58 |
N-320445-0004-4 |
Work Order Bridge Rehabilitation / Replacement Program (FY2016) |
|
$500,000.00 |
08-13-2015(a) |
11-30-2015(a) |
10-25-2016(s) |
03-20-2017(a) |
08-23-2017(a) |
Hien Pham |
Brian Alcott |
|
ISI Contracting, Inc. |
Mike Beezley |
Dan Maines |
| 59 |
M-430301-0011-4 |
FY2018 Storm Sewer Inspection\Cleaning Work Orders #1 |
|
$2,500,000.00 |
() |
02-07-2018(a) |
|
|
|
Tanu Hiremath |
Brian Schrock |
CleanServe, Inc. |
CleanServe, Inc. |
Martin Alcala |
George Bryant |
| 60 |
N-321040-0129-4 |
FY2025 Roadway Rehabilitation Project #1 |
|
$10,597,008.28 |
04-09-2025(a) |
01-19-2026(a) |
|
|
|
Patricia Campbell |
Bryan Castex |
Omega Engineers, Inc. |
Grava LLC |
Tony Childress |
ERIC SOLOMON |
| 61 |
N-321040-0079-4 |
FY2023 Asphalt Overlay Rehab Package #1 |
|
$9,485,846.43 |
() |
10-15-2024(a) |
11-03-2025(s) |
11-10-2025(a) |
02-25-2026(a) |
Alex Castillo |
Bryan Castex |
Omega Engineers, Inc. |
Grava LLC |
Tony Childress |
Majid Pezeshki-HVJ |
| 62 |
M-420126-0132-4 |
FY 2025 Local Drainage Program (LDP) Contract # 1 |
|
$3,000,000.00 |
() |
02-10-2025(a) |
|
|
|
Lagnesh Varshney |
Bryan Gropp |
|
DL Glover Utilities, LLC |
Majid Pezeshki |
Jamarcus Nickerson |
| 63 |
M-420126-0141-4 |
FY 2025 Street & Drainage Rehabilitation (SDR) Work Order Contract # 5 (Ryder) |
|
$5,000,000.00 |
12-17-2025(a) |
02-24-2026(a) |
|
|
|
Lagnesh Varshney |
Bryan Gropp |
|
DL Glover Utilities, LLC |
Majid Pezeshki |
Fernando Gallegos |
| 64 |
M-420126-0140-4 |
FY 2025 Street & Drainage (SDR) Work Order Contract # 4 (Rider) |
|
$5,000,000.00 |
01-14-2026(a) |
03-10-2026(a) |
|
|
|
Syed Nasir |
Bryan Gropp |
|
Grava LLC |
Majid Pezeshki |
|
| 65 |
M-420126-0134-4 |
FY2025 Local Drainage Program (LDP) Contract #3 |
336E,336J,413W,450S,450W,450Z,451K,455Q,489G,490N,490P,490R,490U,490V,493Q,494F,573H |
$5,000,000.00 |
09-30-2025(a) |
10-20-2025(a) |
|
|
|
Lagnesh Varshney |
Bryan Gropp |
|
DL Glover Utilities, LLC |
Majid Pezeshki |
Sergio Carreon |
| 66 |
S-MA1000-0009-4 |
Concrete & Asphalt Restoration |
|
$6,000,000.00 |
() |
03-24-2026(a) |
|
|
|
James Wilson |
Daisy Salazar |
|
Wilsoin Building Services, Inc. |
Alejandro Rodriguez |
Alejandro Rodriguez |
| 67 |
N-T05000-0003-4 |
Memorial Drive at East Loop Phase 1 (TIRZ # 5) |
492F,492K |
$0.01 |
() |
03-07-2017(a) |
|
|
|
Thomas Artz |
Daniel Mooney |
|
|
Julius Lovelady |
|
| 68 |
N-T20020-0003-4 |
Social Services Corridor, Pedestrian Improvements, Phase 1(TIRZ-20) |
530H,531A,531E |
$0.01 |
() |
05-09-2016(a) |
|
|
|
Thomas Artz |
Daniel Mooney |
|
|
Julius Lovelady |
Bruce May |
| 69 |
N-000396-0015-4 |
Lorraine Grade Separation from Hardy Street to Jensen Drive |
|
$0.01 |
() |
|
|
|
|
Thomas Artz |
Daniel Mooney |
|
|
Julius Lovelady |
|
| 70 |
N-T14090-0001-4 |
Fourth Ward Street Reconstruction Project |
493P |
$0.01 |
() |
|
|
|
|
Thomas Artz |
Daniel Mooney |
|
|
Julius Lovelady |
Diane Marsh |
| 71 |
N-T16002-0001-4 |
Holly Hurst Lane from Post Oak Blvd to Hallmark Drive. TIRZ 16 |
491Q |
$0.01 |
() |
|
|
|
|
Thomas Artz |
Daniel Mooney |
|
|
|
|
| 72 |
N-T19220-0001-4 |
Bissonnet Reconstruction-Buffalo Speedway to Kirby (TIRZ 19) |
|
$0.01 |
() |
|
|
|
|
Thomas Artz |
Daniel Mooney |
|
|
Julius Lovelady |
Bruce May |
| 73 |
N-T20020-0002-4 |
Fondren Rd Reconstruction: Westpark Tollway to US-59. (TIRZ-20) |
530C,530K,530L |
$0.01 |
() |
|
|
|
01-16-2018(a) |
Thomas Artz |
Daniel Mooney |
|
|
Keith Phillips |
Richard White |
| 74 |
R-002011-0082-4 |
(WW5035-02) Wastewater System/Substitute Service Support - (W. Polk, Stanford, and W. Clay) |
493N |
$207,316.00 |
() |
01-17-2013(a) |
|
|
|
Ali (DO NOT USE) Khairandish |
Daniel Oefner |
|
D G Medina Construction, LLC |
|
|
| 75 |
R-002015-0010-4 |
Work Order No. 5, Wastewater System/Substitute Service Support - Sherman St. Pkg. 2 |
494U,494V,535U,535V |
$368,700.00 |
() |
04-21-2016(a) |
|
|
|
Ali (DO NOT USE) Khairandish |
Daniel Oefner |
|
TEXAS PRIDE UTILITIES, LLC |
|
|
| 76 |
R-002015-0006-4 |
(WW5108-01) Wastewater System/Substitute Service Support in St. George Place |
490V,491T,491U,491X,491Y,492U,492Y,493N,493Y,494P,494Q,494U,534B,534C,535F |
$335,772.00 |
() |
07-15-2014(a) |
|
|
|
Ali (DO NOT USE) Khairandish |
Daniel Oefner |
|
D G Medina Construction, LLC |
|
|
| 77 |
R-002015-0001-4 |
(WW5109-01) Wastewater System/Substitute Service Support - Burgoyne and Lombardy |
490V,492D,492V,494T,494X,534B,535F,490R |
$1,358,955.00 |
() |
08-01-2013(a) |
|
|
|
Ali (DO NOT USE) Khairandish |
Daniel Oefner |
|
Grava LLC |
|
|
| 78 |
R-002015-0007-4 |
Work Order No. 2, Wastewater System/Substitute Service Support ¿ Sherman St. |
494T,494U |
$479,556.00 |
() |
08-19-2015(a) |
|
|
|
Ali (DO NOT USE) Khairandish |
Daniel Oefner |
|
T Construction L.L.C. |
|
|
| 79 |
R-002015-0012-4 |
Work Order No. 5, Wastewater System/Substitute Service Support, Bellaire West and Winlow Place |
490V,492U,492V,493D,493N,493T,493W,493Y,494P,494Q,494T,529J,533A,534B,534C,535F |
$511,545.00 |
() |
08-19-2015(a) |
|
|
|
Ali (DO NOT USE) Khairandish |
Daniel Oefner |
|
D G Medina Construction, LLC |
|
|
| 80 |
R-002015-0008-4 |
Work Order No. 3, Wastewater System/Substitute Service Support ¿ Braesmont Package 1. |
531T,531X |
$574,933.00 |
() |
10-06-2016(a) |
|
|
|
Ali (DO NOT USE) Khairandish |
Daniel Oefner |
|
MMG CONTRACTORS |
|
|
| 81 |
R-002015-0014-4 |
(WW5159-01) New Front Easement Reconnections |
|
$952,080.00 |
() |
10-18-2013(a) |
|
|
|
Ali (DO NOT USE) Khairandish |
Daniel Oefner |
|
T Construction L.L.C. |
|
|
| 82 |
R-002015-0019-4 |
Work Order No. 6, Wastewater System/Substitute Service Support ¿ Southcrest |
534P |
$322,487.00 |
() |
12-15-2016(a) |
|
|
|
Ali (DO NOT USE) Khairandish |
Daniel Oefner |
|
T Construction L.L.C. |
|
|
| 83 |
R-002015-0011-4 |
Work Order No.4, Wastewater System/Substitute Service Support - Dora, Truxillo |
492Z,493W,493Y,494P,533A |
$328,000.00 |
() |
|
|
|
|
Ali (DO NOT USE) Khairandish |
Daniel Oefner |
|
|
|
|
| 84 |
M-420126-0138-4 |
FY2026 Local Drainage Program (LDP) Contract #2 |
|
$5,000,000.00 |
12-16-2025(a) |
01-12-2026(a) |
|
|
|
Lagnesh Varshney |
Daniel Ortiz |
|
DL Glover Utilities, LLC |
Majid Pezeshki |
Shivraj Thosar |
| 85 |
M-420126-0139-4 |
FY2025 Street & Drainage Rehabilitation (SDR) Contract #3 |
|
$7,000,000.00 |
11-25-2025(a) |
01-20-2026(a) |
|
|
|
Lagnesh Varshney |
Daniel Ortiz |
|
J Rivas Construction, LLC |
Majid Pezeshki |
Steven Ngyuen |
| 86 |
M-420126-0129-4 |
FY2024 Local Drainage Program (LDP) Contract # 2 |
|
$5,000,000.00 |
() |
04-01-2024(a) |
|
06-19-2026(a) |
07-29-2026(a) |
Lagnesh Varshney |
Daniel Ortiz |
|
DL Glover Utilities, LLC |
Claudius Anyalebechi |
Dan Maines |
| 87 |
N-321040-0077-4 |
FY 2023 Street & Drainage Rehabilitation Contract # 2 |
|
$5,000,000.00 |
() |
07-10-2023(a) |
|
05-15-2026(a) |
07-08-2026(a) |
Lagnesh Varshney |
Daniel Ortiz |
|
Grava LLC |
Jesus Favela - COH |
Jamarcus Nickerson |
| 88 |
M-420126-0128-4 |
FY 2024 Local Drainage Program (LDP) Contract # 1 |
|
$5,000,000.00 |
() |
09-18-2023(a) |
11-29-2025(s) |
01-08-2026(a) |
07-29-2026(a) |
Lagnesh Varshney |
Daniel Ortiz |
|
DL Glover Utilities, LLC |
Tony Childress |
Craig Smith |
| 89 |
N-321040-0092-4 |
FY 2024 Street & Drainage Rehabilitation Contract # 1 |
|
$6,000,000.00 |
() |
10-30-2023(a) |
10-29-2025(s) |
06-22-2026(a) |
09-30-2026(a) |
Lagnesh Varshney |
Daniel Ortiz |
|
J Rivas Construction, LLC |
Augustus Donaldson |
Sergio Carreon |
| 90 |
M-410015-002A-4 |
Magnolia Park Section 2 Area Drainage and Paving Subproject 2A |
495W,495X |
$8,054,388.15 |
() |
11-09-2026(a) |
|
|
|
Lagnesh Varshney |
Daniel Ortiz |
|
Environmental Allies, Inc. |
Majid Pezeshki |
Shivraj Thosar |
| 91 |
M-430006-0036-4 |
FY2025 Drainage Rehab (SWAT) Work Orders #3 |
|
$5,000,000.00 |
03-06-2025(a) |
04-28-2025(a) |
|
|
|
Lagnesh Varshney |
Daniel Sicinski |
|
Grava LLC |
Jesus Favela - COH |
Eric LaCour |
| 92 |
M-430006-0037-4 |
FY2025 Drainage Rehab (SWAT) Work Orders #4 |
|
$5,000,000.00 |
() |
06-01-2026(a) |
|
|
|
Joan Ruiz |
Daniel Sicinski |
DL Glover Utilities, LLC |
DL Glover Utilities, LLC |
Desmone Kelley |
Warkeith Smith |
| 93 |
M-430006-0029-4 |
FY2024 Drainage Rehab (SWAT) Work Orders #1 |
|
$4,000,000.00 |
02-14-2024(a) |
06-02-2025(a) |
|
|
|
Joan Ruiz |
Daniel Sicinski |
|
DL Glover Utilities, LLC |
Desmone Kelley |
Majid Pezeshki-HVJ |
| 94 |
S-000056-0089-4 |
East Water Purification Plant Enhancement Project-1 |
496T,496U,496Y |
$0.00 |
07-15-2026(a) |
09-03-2026(a) |
|
|
|
Moheb Eskander |
Darian Hut |
Kiewit Water Facilities Co. |
|
|
|
| 95 |
S-000056-0090-4 |
East Water Purification Plant Enhancement Project-2 |
496T,496U,496Y |
$0.00 |
() |
|
|
|
|
Moheb Eskander |
Darian Hut |
|
|
|
|
| 96 |
R-000266-0298-4 |
Wastewater Collection System Rehabilitation and Renewal |
|
$4,995,519.47 |
() |
06-21-2023(a) |
|
|
|
Aisha Niang |
David Tajadod |
|
T Construction L.L.C. |
|
|
| 97 |
S-000700-0102-4 |
Replace & Repair Waterlines Up To 24 Inch Diameter |
|
$25,000,000.00 |
() |
|
|
|
|
James Wilson |
David Bolton |
|
|
|
|
| 98 |
R-000266-0402-4 |
Wastewater Collection System Rehabilitation and Renewal |
|
$5,399,737.61 |
() |
05-13-2026(a) |
|
|
|
Brian Campbell |
David Edralin |
|
Vortex Lining Systems, LLC |
Andre Barnes |
Lizbeth Villasenor |
| 99 |
R-000266-0395-4 |
Wastewater Collection System Rehabilitation and Renewal |
|
$5,219,736.83 |
() |
10-07-2025(a) |
|
|
|
Brian Campbell |
David Edralin |
|
Vortex Lining Systems, LLC |
Andre Barnes |
Andre Barnes |
| 100 |
R-000266-0372-4 |
Wastewater Collection System Rehabilitation and Renewal |
|
$4,131,183.74 |
() |
10-15-2025(a) |
|
|
|
Brian Campbell |
David Edralin |
|
PM Construction & Rehab, LLC |
Andre Barnes |
Andre Barnes |
| 101 |
R-000266-0350-4 |
Wastewater Collection System Rehabilitation and Renewal |
|
$2,941,281.59 |
() |
11-20-2025(a) |
|
|
|
Brian Campbell |
David Edralin |
|
T Construction L.L.C. |
cash smith |
cash smith |
| 102 |
M-430006-0031-4 |
FY2024 Drainage Rehab (SWAT) Work Orders #3 |
|
$4,000,000.00 |
10-16-2024(a) |
02-03-2025(a) |
|
|
|
Joan Ruiz |
Desmone Kelley |
|
Grava LLC |
Daniel Sicinski |
Warkeith Smith |
| 103 |
M-420126-0136-4 |
Ashton Village Drainage Improvements |
488Z |
$5,689,421.75 |
12-12-2025(a) |
03-02-2026(a) |
|
|
|
Joan Ruiz |
Desmone Kelley |
|
Texas Dewatering LLC |
Brandon Del Villar |
Jesus Serrano Marrero |
| 104 |
M-430006-0034-4 |
FY2025 Drainage Rehab (SWAT) Work Orders #1 |
413U,413Y |
$5,000,000.00 |
08-29-2024(a) |
08-04-2025(a) |
|
|
|
Joan Ruiz |
Desmone Kelley |
|
DL Glover Utilities, LLC |
Joan Ruiz |
Warkeith Smith |
| 105 |
M-430006-0027-4 |
FY2023 Drainage Rehab (SWAT) Work Orders #4 |
|
$8,000,000.00 |
08-23-2023(a) |
10-02-2023(a) |
|
|
|
Joan Ruiz |
Desmone Kelley |
|
DL Glover Utilities, LLC |
Augustus Donaldson |
Ulyasas Varice |
| 106 |
M-430006-0032-4 |
FY2024 Drainage Rehab (SWAT) Work Orders #4 |
|
$4,000,000.00 |
01-29-2025(a) |
10-06-2025(a) |
|
|
|
Joan Ruiz |
Desmone Kelley |
|
DL Glover Utilities, LLC |
Majid Pezeshki |
Ulyasas Varice |
| 107 |
M-430006-0020-4 |
FY2023 Drainage Rehab (SWAT) Work Orders #1 |
|
$6,000,000.00 |
03-22-2023(a) |
10-23-2023(a) |
|
|
|
Joan Ruiz |
Desmone Kelley |
|
T Construction L.L.C. |
Joan Ruiz |
Wahidi Gulrahman |
| 108 |
M-430006-0018-4 |
FY2022 Drainage Rehab (SWAT) Work Orders #3 |
|
$3,000,000.00 |
09-07-2022(a) |
11-01-2022(a) |
|
|
|
Joan Ruiz |
Desmone Kelley |
|
T Construction L.L.C. |
Majid Pezeshki |
Eric LaCour |
| 109 |
M-410029-0001-4 |
Chateau Forest Area 1 Drainage and Paving (SP1) |
411N,411S,411T |
$10,265,006.00 |
07-08-2026(a) |
08-24-2026(a) |
05-13-2028(s) |
06-12-2028(s) |
11-30-2028(s) |
Yusherry Cang |
Doaa Hamdan |
ARKK Engineers, LLC |
Total Contracting Limited |
Steve Rorai |
Bobby Vasek |
| 110 |
N-320396-0034-4 |
Work Order Clearing and Grubbing |
|
$500,000.00 |
() |
08-14-2023(a) |
08-13-2026(s) |
07-16-2026(a) |
01-27-2027(s) |
Prakash Luetel |
Edward Hall |
|
DL Glover Clearing, LLC. |
Brian Johnson |
Fernando Gallegos |
| 111 |
M-430301-0012-4 |
FY23 Inspection Cleaning Data Collection of Storm Sewers |
|
$2,500,000.00 |
() |
04-09-2025(a) |
|
|
|
Elroyal Morris |
Elroyal Morris |
|
Specialized Maintenance Services, Inc. |
Elroyal Morris |
George Bryant |
| 112 |
S-000035-0269-4 |
Watermain Replacement in Midtown Area and Winlow Place, Dearborn Place, Montlew Place, and Lancaster Subdivisions |
492U,492V,492Y,492Z |
$13,598,228.00 |
10-23-2024(a) |
02-17-2025(a) |
02-16-2026(s) |
03-31-2026(s) |
|
Sudarshan Gouni |
Freddy Ordonez |
HR GREEN, INC. |
Resicom, Inc. |
John Mudd |
Hugo Navarro |
| 113 |
N-TX0290-004A-4 |
TXDOT - US-290, Segment 4A; US 290: West of Pinemont to East of W 43rd ¿ frontage road. (includes Pinemont overpass) |
451E,451F,451K,451L,451Q |
$0.01 |
() |
02-12-2014(a) |
|
|
|
Thomas Artz |
Gary Hill |
|
|
Julius Lovelady |
Keith Phillips |
| 114 |
N-T1912B-0001-4 |
Richmond Avenue Drainage System Improvements |
|
$0.01 |
() |
02-20-2012(a) |
|
|
|
Thomas Artz |
Gary Hill |
|
|
Julius Lovelady |
Derek Phillips |
| 115 |
N-TX0290-005A-4 |
TXDOT - US-290, Segment 5A; West of Fairbanks North Houston to West of Pinemont |
410S,410T,410X,410Y,450C,450D,451A,451E |
$0.01 |
() |
03-09-2016(a) |
|
|
|
Thomas Artz |
Gary Hill |
|
|
Julius Lovelady |
Richard White |
| 116 |
N-TX0288-0002-4 |
Water and Wastewater Relocations along SH-288 Toll Lanes: US-59 to BW8 |
533B,533E,533F,533K,533P,533T,533W,533X,573A,573E,573J,573N,573S,573W |
$2,200,467.00 |
() |
03-28-2018(a) |
|
|
|
Thomas Artz |
Gary Hill |
|
|
Keith Phillips |
|
| 117 |
N-T16004-0002-4 |
Post Oak Blvd Phase 2: from San Felipe to Westheimer |
491Q,491U |
$10,000,000.00 |
() |
04-27-2016(a) |
|
|
|
Thomas Artz |
Gary Hill |
|
Reytec Construction Resources, Inc. |
Keith Phillips |
Richard White |
| 118 |
N-T16004-0003-4 |
Post Oak Blvd Phase 3: from Westheimer to Richmond (TIRZ 16) |
491U,491Y |
$0.01 |
() |
04-27-2016(a) |
|
|
|
Thomas Artz |
Gary Hill |
|
SER Construction Partners, LLC. |
Keith Phillips |
Richard White |
| 119 |
N-TX0290-0002-4 |
TXDOT - US-290, Segment 2; TC Jester to North of IH 10 on IH 610 and IH 610 to W 34th |
451Q,451R,451V,451Z,452S,491D |
$0.01 |
() |
06-08-2011(a) |
|
|
|
Thomas Artz |
Gary Hill |
|
|
Julius Lovelady |
Keith Phillips |
| 120 |
N-T16004-0001-4 |
Post Oak Blvd Phase 1 from IH 610 to San Felipe (TIRZ 16) |
491Q,491R,491U,491Y |
$0.01 |
() |
09-28-2016(a) |
|
|
|
Thomas Artz |
Gary Hill |
|
Harper Brothers Construction, LLC |
Keith Phillips |
Richard White |
| 121 |
N-TX0290-006A-4 |
TXDOT - US-290, Segment 6A; West of FM 529 to East of West Little York (OUTBOUND) |
409Q,409R,409V |
$0.01 |
() |
10-23-2013(a) |
|
|
|
Thomas Artz |
Gary Hill |
|
|
Julius Lovelady |
Richard White |
| 122 |
N-T1912A-0001-4 |
Westheimer Drainage System Improvements from Kirby to Buffalo Speedway |
|
$0.01 |
() |
11-11-2016(a) |
|
|
|
Thomas Artz |
Gary Hill |
|
|
Julius Lovelady |
Bruce May |
| 123 |
N-TX0290-003A-4 |
TXDOT - US-290, Segment 3A; IH 610: W of W 34th St on US 290 (Seg 3) to N and S of US 290 on IH 610; (Mainlanes portion of IH 610/US 290 Interchange) |
451Q,451R,451V,451Z,452S,491D |
$0.01 |
() |
12-11-2013(a) |
|
|
|
Thomas Artz |
Gary Hill |
|
|
Julius Lovelady |
Keith Phillips |
| 124 |
N-TX0290-0001-4 |
TXDOT - US-290, Segment 1; IH 610: W of Mangum / 18th St on Hempstead to S of Old Katy Rd on IH 610 |
451V,451Z,491D |
$0.01 |
() |
12-12-2012(a) |
|
|
|
Thomas Artz |
Gary Hill |
|
|
Julius Lovelady |
Richard White |
| 125 |
N-TX0290-003B-4 |
TXDOT - US-290, Segment 3B, of W 34th St on US 290 to N and S of US 290 on IH 610; (Outbound connector from IH 10 to IH 610 North Loop and US 290) and associated frontage road work) |
451Q,451R,451V,451Z,452S,491D |
$0.01 |
() |
12-18-2013(a) |
|
|
|
Thomas Artz |
Gary Hill |
|
|
Julius Lovelady |
Richard White |
| 126 |
N-000420-0049-4 |
Keegans Bayou Trail Slope Repairs |
569C,569D,529Z,530S,530W |
$1,309,425.75 |
() |
|
|
|
|
Thomas Artz |
Gary Hill |
In-House |
|
Julius Lovelady |
Bruce May |
| 127 |
R-000265-0126-4 |
Southeast Wastewater Treatment Plant Improvements/ Expansion--Package 1 |
576W |
$44,917,735.00 |
01-04-2023(a) |
02-07-2023(a) |
08-19-2026(s) |
01-29-2027(s) |
12-05-2026(s) |
Singarpal Sekhon |
Gauher Khan |
Weston Solutions, Inc. |
LEM Construction Co., Inc. |
Robert Toliver |
Steven Escagne |
| 128 |
R-000265-0148-4 |
Southeast Wastewater Treatment Plant Expansion, Package II |
576W |
$46,998,035.00 |
04-17-2024(a) |
07-22-2024(a) |
01-18-2027(s) |
03-19-2027(s) |
06-18-2027(s) |
Singarpal Sekhon |
Gauher Khan |
Lloyd, Smitha & Associates, LLC |
LEM Construction Co., Inc. |
Robert Toliver |
Kevin Stricklan |
| 129 |
M-420126-0088-4 |
FY15 LDP Work Order Construction #2 |
439F |
$1,955,000.00 |
08-18-2015(a) |
01-12-2016(a) |
03-07-2019(s) |
03-12-2018(s) |
05-23-2018(s) |
Umer Khan |
Gopal Tamakhu |
|
P2MG, LLC |
Gopal Tamakhu |
Abrham Demessie |
| 130 |
R-000266-0367-4 |
Sanitary Sewer Cleaning and Television Inspection in Support of Rehabilitation (File 4277-128) |
|
$2,002,332.50 |
() |
08-16-2023(a) |
|
|
|
David Tajadod |
Hanaa Fayyadh |
|
|
|
|
| 131 |
S-000056-0091-4 |
EWPP Feeder-A Replacement |
496U,496Y |
$19,415,444.00 |
() |
|
|
|
|
|
Hanh Pham |
Kalluri Group, Inc. |
Boyer, Inc. |
|
|
| 132 |
N-100041-0001-4 |
Shepherd Durham Reconstruction from 15th Street to IH 10 (Phase II) |
533D,534A |
$69,716,798.42 |
07-09-2025(a) |
10-15-2025(a) |
01-19-2029(s) |
02-20-2029(a) |
08-08-2029(a) |
Sudarshan Gouni |
Hasan McKee |
CDM SMITH INC |
Harper Brothers Construction, LLC |
Frank Mayfield |
Trae Renevier |
| 133 |
R-000035-0025-4 |
Force Main Renewal/Replacement of Hempstead No. 1 (WCID #28) Lift Stations |
451E,451J |
$8,074,079.00 |
03-06-2024(a) |
05-06-2024(a) |
11-05-2026(s) |
12-14-2026(s) |
03-15-2027(s) |
Mohammad Haider |
Hemil Patel |
|
Resicom, Inc. |
Brian Johnson |
Harold McKinley |
| 134 |
R-000536-0032-4 |
Facilities Consolidation: Flow Diversion from Tidwell Timber Wastewater Treatment Plant to FWSD #23 Wastewater Treatment |
455G,456B |
$31,180,300.00 |
08-23-2023(a) |
10-16-2023(a) |
01-15-2027(s) |
02-27-2027(s) |
05-31-2027(s) |
Mohammad Haider |
Hemil Patel |
|
Harper Brothers Construction, LLC |
Jeremy Garcia |
Oluwaseun Ogunlala |
| 135 |
R-000536-0031-4 |
North Corridor Consolidation Pkg 4 - 36" Gravity Sewer from MUD203 WWTP to Northgate Regional LS |
372P,372Q,372R |
$45,849,760.00 |
09-03-2025(a) |
10-16-2025(a) |
02-03-2028(s) |
03-20-2028(s) |
06-14-2028(s) |
Mohammad Haider |
Hemil Patel |
Sowells Consulting Engineers |
Reytec-Posillico I, LLC |
Christopher Robinson |
Monte Campbell |
| 136 |
R-000536-0033-4 |
Force Main Flow Diversion from Sagemont Lift Station to Southeast WWTP |
576S,576T,576U,576W,576X,576Y |
$20,163,821.00 |
09-20-2023(a) |
11-20-2023(a) |
11-17-2025(s) |
10-13-2026(s) |
01-06-2027(s) |
Mohammad Haider |
Hemil Patel |
Sowells Consulting Engineers |
Main Lane Industries |
Arthur Morris-Sowells |
Monte Campbell |
| 137 |
R-000536-0030-4 |
North Corridor Consolidation Package 3 - Flow Diversion (36-inch) From Imperial Valley WWTP to Northgate Regional LS |
372R,373N,373S,373W |
$47,167,288.00 |
11-05-2025(a) |
12-05-2025(a) |
01-24-2028(s) |
03-09-2028(s) |
05-31-2028(s) |
Mohammad Haider |
Hemil Patel |
Sowells Consulting Engineers |
MC2 Civil, LLC |
Christopher Robinson |
Monte Campbell |
| 138 |
S-000900-0138-4 |
24-inch Water Line from Doolittle Boulevard to Sunbeam Street along Martin Luther King Jr. Boulevard |
533V,533Z,573D,573H |
$10,202,305.61 |
12-30-2024(a) |
03-19-2025(a) |
09-11-2026(s) |
10-11-2026(s) |
01-17-2027(s) |
Panduranga Kuruva |
Himal Pangeni |
Lloyd, Smitha & Associates, LLC |
Grava LLC |
Carl Smitha |
Jack Caffey |
| 139 |
S-000900-0173-4 |
48-inch Water Line from SH288 to Cullen Boulevard along E Orem Drive |
573J,573K,573L,573M,573Q,573R |
$17,390,476.00 |
04-08-2026(a) |
05-13-2026(a) |
11-09-2027(s) |
12-09-2027(s) |
03-21-2028(s) |
Panduranga Kuruva |
Himal Pangeni |
Lloyd, Smitha & Associates, LLC |
V&S Construction |
Robert Hill |
Jack Caffey |
| 140 |
R-000019-EMSR-4 |
Emergency Wastewater Project Salary Recovery |
|
$1.00 |
() |
|
|
|
|
Jack Canfield |
Jack Canfield |
|
|
|
|
| 141 |
N-321040-0156-4 |
FY2025 Roadway Rehabilitation Project #3 |
|
$8,320,305.90 |
11-19-2025(a) |
01-05-2026(a) |
|
|
|
Patricia Campbell |
Jack Cortez |
|
Grava LLC |
Tony Childress |
Plachette Williams |
| 142 |
S-000700-0099-4 |
Montrose Work Orders for Small Diameter Water Lines |
|
$5,000,000.00 |
04-01-2025(a) |
04-07-2025(a) |
|
|
|
Lagnesh Varshney |
Jack Cortez |
|
Reliance Construction Services, L.P. |
Mack Nosrat |
Joshua Davidson |
| 143 |
N-321040-0160-4 |
FY2026 Asphalt Overlay Work Order Contract #1 |
|
$45,672,422.00 |
04-08-2026(a) |
04-20-2026(a) |
|
|
|
Summer Lindsay |
Jack Cortez |
Omega Engineers, Inc. |
Durwood Greene Construction, L.P. |
Tony Childress |
Tony Childress |
| 144 |
N-321040-0130-4 |
FY2025 Roadway Rehabilitation Project #2 |
|
$6,444,996.52 |
() |
07-28-2025(a) |
|
|
|
Patricia Campbell |
Jack Cortez |
|
DCE Construction, Inc. |
Tony Childress |
Albert Brown |
| 145 |
S-001000-056A-4 |
LAS System at Ground Water Facilities and Chemical Improvements at Re-Pump Stations - Package 1 |
412S,611D,449Y,449U,449W,450L,450K,528H,528M,571K,571P,491Z |
$34,862,100.00 |
05-28-2025(a) |
07-07-2025(a) |
02-11-2030(s) |
03-26-2030(s) |
06-19-2030(s) |
Tina Yao |
James Davis |
Lloyd, Smitha & Associates, LLC |
MC2 Civil, LLC |
Mack Nosrat |
James Hamilton |
| 146 |
S-001000-0045-4 |
Facilities Improvements at Various Well Sites and Re-Pump Stations - Package 2 |
490Y,491W,491X,491Z,528R,529K,529S,529T,530B,530C,530D,570L,570M,571P,571Y |
$8,537,700.00 |
06-08-2022(a) |
08-08-2022(a) |
01-11-2027(s) |
02-25-2027(s) |
05-26-2027(s) |
Tina Yao |
James Davis |
Huitt Zollars, Inc. |
LEM Construction Co., Inc. |
Jeremy Garcia |
Amir Jahromi |
| 147 |
S-000200-029A-4 |
Ground Water Well Rehabilitation at Various Location - Package I |
|
$3,839,959.20 |
08-12-2026(a) |
10-05-2026(a) |
02-17-2028(s) |
04-03-2028(s) |
06-28-2028(s) |
Tina Yao |
James Davis |
FCM Engineers |
Alsay, Inc. |
Mack Nosrat |
Harshil Joshi |
| 148 |
S-000200-028B-4 |
Ground Water Well Rehabilitation Project Package 2 |
369M,410R,450K,488F,488W |
$3,829,391.73 |
10-16-2024(a) |
12-09-2024(a) |
09-29-2026(s) |
11-13-2026(s) |
02-03-2027(s) |
Tina Yao |
James Davis |
Lloyd, Smitha & Associates, LLC |
Alsay, Inc. |
Claudius Anyalebechi |
Michael Hughey |
| 149 |
S-000701-0051-4 |
On-Call Rehabilitation of Large Diameter Water Lines Package 3 |
|
$4,000,000.00 |
() |
07-21-2025(a) |
|
|
|
James Wilson |
James Moore Jr. |
Briones Consulting & Engineering LTD |
Reytec Construction Resources, Inc. |
James Moore Jr. |
Evelyn Kuykendall |
| 150 |
S-000020-0082-4 |
On-Call Rehabilitation of Large Diameter Water Lines Package 2 |
|
$2,500,000.00 |
() |
08-16-2023(a) |
|
|
|
James Wilson |
James Moore Jr. |
Briones Consulting & Engineering LTD |
Reytec Construction Resources, Inc. |
Dominiek Curry |
Kevin Johnston |
| 151 |
M-430296-0011-4 |
Cambridge Village Park and Ramblewood Storm Sewer |
571M |
$9,017,166.36 |
11-05-2025(a) |
01-12-2026(a) |
10-31-2026(s) |
12-10-2026(s) |
05-12-2027(s) |
Prakash Luetel |
Jason Samkutty |
Othon, Inc. |
SER Construction Partners, LLC. |
Ben Barajas |
Roland Joubert |
| 152 |
N-321040-0147-4 |
City of Houston Systemic Safety Project (HSIP-24) |
|
$2,210,463.06 |
() |
11-30-2026(a) |
|
|
|
Sam Habibi |
Jessica Sezikeye |
|
MetroCity LLC |
Claudius Anyalebechi |
Sadegh Esmaeilzadeh |
| 153 |
N-321040-0159-4 |
N. Houston Rosslyn Road Sidewalk Improvements |
|
$0.00 |
() |
|
|
|
|
Sam Habibi |
Jessica Sezikeye |
|
|
|
|
| 154 |
N-100027-0001-4 |
S. Lockwood Paving and Drainage: Crites St. to Suburban St. (Sub Project 1) |
494P |
$8,498,862.21 |
11-01-2023(a) |
01-29-2024(a) |
08-20-2025(s) |
05-04-2026(a) |
06-23-2027(s) |
Prakash Luetel |
Jessika Carey |
|
Total Contracting Limited |
Brian Johnson |
Jesus Serrano Marrero |
| 155 |
M-410035-0001-4 |
Northside High School Area Drainage and Paving |
493C,493D |
$40,994,635.06 |
() |
04-06-2026(a) |
05-30-2029(s) |
06-30-2029(s) |
10-17-2029(s) |
Prakash Luetel |
Jessika Carey |
Othon, Inc. |
SER Construction Partners, LLC. |
Saber Nikbakht |
Tsegaye Hailu Mezgebe |
| 156 |
M-420126-092R-4 |
15 Windermere Outfall Repair |
490U |
$0.00 |
() |
|
|
|
|
Prakash Luetel |
Jessika Carey |
|
|
Brian Johnson |
Fernando Gallegos |
| 157 |
M-420126-0130-4 |
FY2024 Construction Management and Inspection Services for Drainage and Paving Rehabilitation Projects (Contract #1) |
|
$1,400,000.00 |
() |
04-15-2024(a) |
|
|
|
Lagnesh Varshney |
Jesus Favela - COH |
|
Arredondo, Zepeda & Brunz, LLC |
Jesus Favela - COH |
|
| 158 |
M-430006-0038-4 |
FY2026 Drainage Rehab (SWAT) Work Orders #1 |
|
$5,000,000.00 |
03-04-2026(a) |
06-15-2026(a) |
|
|
|
Lagnesh Varshney |
Jesus Favela - COH |
|
Grava LLC |
Jesus Favela - COH |
Ulyasas Varice |
| 159 |
M-420126-0131-4 |
FY 2024 Construction Management and Inspection Services for Paving and Drainage Rehabilitation (Contract # 2) |
|
$1,400,000.00 |
() |
|
|
|
|
Lagnesh Varshney |
Jesus Favela - COH |
|
ING GARZA Civil Engineering |
Jesus Favela - COH |
Jesus Favela - COH |
| 160 |
M-430006-0007-4 |
FY2020 Drainage Rehab (SWAT) Work Orders #2 |
|
$4,000,000.00 |
01-29-2020(a) |
03-09-2020(a) |
|
|
|
Lagnesh Varshney |
Joan Ruiz |
|
T Construction L.L.C. |
Joan Ruiz |
Eric LaCour |
| 161 |
M-430006-0025-4 |
FY2023 Drainage Rehab (SWAT) Work Orders #3 |
|
$8,000,000.00 |
08-02-2023(a) |
09-04-2023(a) |
|
|
|
Lagnesh Varshney |
Joan Ruiz |
|
Reytec Construction Resources, Inc. |
Joan Ruiz |
William Young |
| 162 |
S-000701-0042-4 |
Miscellaneous Large Diameter Water Line Improvements - Package 2 |
451V,452S,452T,452U,452V,535S |
$22,659,973.83 |
10-29-2025(a) |
11-10-2025(a) |
06-30-2027(s) |
08-31-2027(s) |
12-31-2027(s) |
Panduranga Kuruva |
Joaquin Lopez |
|
MC2 Civil, LLC |
Mack Nosrat |
Fred Lytton |
| 163 |
R-000266-0403-4 |
Wastewater Collection System Rehabilitation and Renewal |
|
$5,616,932.00 |
() |
08-27-2026(a) |
|
|
|
Brian Campbell |
Job Santos |
|
DL GLOVER PIPE BURSTING, LLC |
Andre Barnes |
Lizbeth Villasenor |
| 164 |
N-321040-0012-4 |
Traffic Signal Work Order FY 2020 A |
|
$3,847,345.50 |
() |
10-08-2020(a) |
03-10-2023(s) |
|
|
Joe Hanak |
Joe Hanak |
|
Traffic Systems Construction, Inc. |
Augustus Donaldson |
Augustus Donaldson |
| 165 |
N-320668-0050-4 |
Professional Services and Technical Support for Paving and Drainage Projects |
|
$500,000.00 |
() |
|
|
|
|
Colin Lupold |
Joe Hanak |
|
|
|
|
| 166 |
R-000267-0118-4 |
Lift station renewal and replacement for Mac Gregor Way North #1, Magnet and Westpark #1 Lift Stations |
533E,533S,491Z |
$21,029,950.00 |
04-06-2022(s) |
05-23-2022(a) |
10-07-2026(s) |
11-06-2026(s) |
04-05-2027(s) |
Singarpal Sekhon |
Johnson Aina |
|
Industrial Texas Corporation |
Robert Toliver |
Fred Lytton |
| 167 |
R-000265-0117-4 |
Intercontinental Airport (IAH) WWTP Improvements |
373M |
$20,072,046.10 |
07-28-2026(a) |
08-17-2026(a) |
08-10-2028(s) |
09-11-2028(s) |
05-09-2029(s) |
Singarpal Sekhon |
Johnson Aina |
Lloyd, Smitha & Associates, LLC |
Servox, LLC |
Jeremy Garcia |
Alejandro Carpy |
| 168 |
N-321040-0179-4 |
Construction Management and Inspection Services for Paving Rehabilitation Services |
|
$1,000,000.00 |
() |
|
|
|
|
Summer Lindsay |
Jonah Frank |
|
|
|
|
| 169 |
N-321040-0039-4 |
Citywide Traffic Signal Improvements, Intersection Redesign & Street Safety Improvements |
|
$6,651,110.00 |
() |
01-24-2023(a) |
|
|
|
Patrick Nguyen |
Jorge Palacios |
|
Tikon Group Inc. |
Jorge Palacios |
Jorge Palacios |
| 170 |
N-310662-047A-4 |
Citywide Intersection Redesign and Safety Improvements #6 |
374D,533N,493X,493Y,533H,534E,489X,529C,490W,489Z,531B,571J,531X,571U,571M |
$999,972.99 |
12-02-2015(s) |
02-15-2016(a) |
12-05-2017(s) |
07-01-2018(s) |
10-03-2018(s) |
Colin Lupold |
Jorge Palacios |
|
Traffic Systems Construction, Inc. |
Joe Hanak |
Augustus Donaldson |
| 171 |
N-321040-0024-4 |
Citywide Intersections Rebuild and Safety Improvements Work Order Project |
531E,531A |
$3,336,310.25 |
() |
03-02-2021(a) |
|
|
|
Patrick Nguyen |
Jorge Palacios |
|
Tikon Group Inc. |
Augustus Donaldson |
Augustus Donaldson |
| 172 |
N-321040-0117-4 |
Traffic Signal Work Order FY24#1 |
|
$4,880,225.00 |
09-25-2024(a) |
03-19-2025(a) |
|
|
|
Nina Joshi |
Jorge Palacios |
|
Traffic Systems Construction, Inc. |
Augustus Donaldson |
Hector Carpio |
| 173 |
N-321040-0066-4 |
Traffic Signal Work Order FY23 #1 |
|
$3,536,737.50 |
05-17-2023(a) |
07-03-2023(a) |
|
|
|
Patrick Nguyen |
Jorge Palacios |
|
Traffic Systems Construction, Inc. |
Augustus Donaldson |
Patrick Turner |
| 174 |
N-321040-0013-4 |
Traffic Signal Work Order FY 2019 B |
|
$3,848,313.50 |
() |
08-11-2020(a) |
|
|
|
Patrick Nguyen |
Jorge Palacios |
|
Traffic Systems Construction, Inc. |
Augustus Donaldson |
Jun Chen |
| 175 |
N-321040-0067-4 |
Traffic Signal Work Order FY23 #2 |
|
$3,591,150.00 |
06-07-2023(a) |
08-18-2023(a) |
|
|
|
Patrick Nguyen |
Jorge Palacios |
|
Traffic Systems Construction, Inc. |
Augustus Donaldson |
Hector Carpio |
| 176 |
N-321040-0037-4 |
Traffic Signal Work Order FY21 |
|
$4,710,768.00 |
() |
11-08-2021(a) |
12-31-2023(s) |
|
|
Patrick Nguyen |
Jorge Palacios |
|
Traffic Systems Construction, Inc. |
Augustus Donaldson |
Joe Rodriguez |
| 177 |
N-321040-0158-4 |
FY2025 Asphalt Overlay Services Project #1 |
|
$4,970,986.75 |
() |
03-17-2026(a) |
|
|
|
Patricia Campbell |
Jose Laguna |
Omega Engineers, Inc. |
J Rivas Construction, LLC |
Tony Childress |
Monte Campbell |
| 178 |
N-321040-0157-4 |
FY2025 Asphalt Overlay Services Project #2 |
|
$5,209,792.25 |
10-15-2025(a) |
12-01-2025(a) |
|
|
|
Patricia Campbell |
Jose Laguna |
Omega Engineers, Inc. |
J Rivas Construction, LLC |
Yordano Gutierrez |
Monte Campbell |
| 179 |
N-321040-0148-4 |
City of Houston Systemic Safety Project (HSIP-25) |
|
$731,263.80 |
04-01-2026(a) |
04-27-2026(a) |
02-21-2027(s) |
04-07-2027(s) |
07-06-2027(s) |
Sam Habibi |
Kevin Hammond |
|
Brizo Construction, LLC |
Claudius Anyalebechi |
Sadegh Esmaeilzadeh |
| 180 |
R-000536-0034-4 |
Flow diversion from Easthaven to Southeast WWTP - Package 1 Southeast WWTP to Fuqua & Blackhawk
|
557V,576S,576W |
$29,787,458.57 |
09-25-2024(a) |
10-14-2024(a) |
04-30-2027(s) |
06-01-2027(s) |
09-01-2027(s) |
Mohammad Haider |
Kevin Thomas |
Plummer Associates, Inc. |
Pate Garver, L.P. |
Jeremy Garcia |
Alejandro Carpy |
| 181 |
R-000020-0101-4 |
Construction Management & Inspection (CM&I) for Capacity Remedial Measures Plan (CRMP)-24-82-(AECOM) |
|
$0.00 |
() |
|
|
|
|
Mohammad Haider |
Kevin Thomas |
Lloyd, Smitha & Associates, LLC |
AECOM |
|
|
| 182 |
R-000020-0103-4 |
Construction Management & Inspection (CM&I) Services for Horizontal Wastewater Facilities Projects (Consent Decree) RFQ-24-90 (Lloyd Smitha) |
|
$0.00 |
() |
|
|
|
|
Mohammad Haider |
Kevin Thomas |
Lloyd, Smitha & Associates, LLC |
Lloyd, Smitha & Associates, LLC |
|
|
| 183 |
N-320660-0023-4 |
On-Call NTMP Construction |
|
$993,702.50 |
() |
04-01-2016(a) |
|
|
|
Gary Drabek |
Khang Nguyen |
|
ISI Contracting, Inc. |
Veronica Rocha |
Shaonan Zhang |
| 184 |
N-320660-0020-4 |
Neighborhood Traffic Management Program |
|
$469,260.00 |
() |
10-03-2014(a) |
|
|
|
Khang Nguyen |
Khang Nguyen |
|
ISI Contracting, Inc. |
Veronica Rocha |
Shaonan Zhang |
| 185 |
N-320660-0024-4 |
On-Call NTMP Construction |
|
$1,275,937.50 |
() |
11-01-2016(a) |
|
|
|
Gary Drabek |
Khang Nguyen |
|
ISI Contracting, Inc. |
Veronica Rocha |
Shaonan Zhang |
| 186 |
N-322017-0001-4 |
On-Call NTMP Construction (Group-B) |
|
$817,451.00 |
() |
12-01-2016(a) |
|
|
|
Gary Drabek |
Khang Nguyen |
|
D G Medina Construction, LLC |
Veronica Rocha |
Shaonan Zhang |
| 187 |
S-001000-0043-4 |
GW Facility/Re-Pump Station/HVAC & Ventilation System Improvements at Various Locations - Package 2 |
528H,571P,450K,488F,487C,372P,529S,409N |
$21,659,640.47 |
06-25-2025(a) |
09-02-2025(a) |
11-16-2028(s) |
12-30-2028(s) |
03-15-2029(s) |
Tina Yao |
Kresimir Begic |
|
Servox, LLC |
Mack Nosrat |
Mark Gonzalez |
| 188 |
S-001000-0054-4 |
GW Facility/Re-Pump Station/HVAC & Ventilation System Improvements at Various Locations - Package 3 |
374A,296V,488A,410R,336F,489P,489N,529B |
$16,810,140.00 |
07-22-2026(a) |
11-16-2026(a) |
09-18-2028(s) |
10-18-2028(s) |
01-17-2029(s) |
Tina Yao |
Kresimir Begic |
|
Industrial Texas Corporation |
Robert Toliver |
|
| 189 |
M-410016-0001-4 |
Westridge and Braes Terrace Area Drainage Improvements |
532P,532T |
$4,728,944.12 |
08-27-2025(a) |
10-24-2025(a) |
01-07-2027(s) |
|
|
Sam Habibi |
Lucia Lee |
|
Vortex Lining Systems, LLC |
Brian Johnson |
Fernando Gallegos |
| 190 |
N-MAO100-0004-4 |
Citywide Street Sweeping Services (Downtown) |
|
$1,310,262.00 |
() |
03-01-2017(a) |
|
|
|
Steven Loo |
Lynn Phipps |
|
Yes America Enterprises |
Tellas Johnson |
Abdreas Moreno |
| 191 |
N-MAO100-0002-4 |
Citywide Street Sweeping Services (Northside) & (Southside) |
|
$4,535,907.10 |
() |
03-22-2016(a) |
|
|
|
Steven Loo |
Lynn Phipps |
Yes America Enterprises |
Yes America Enterprises |
Tellas Johnson |
William Elmore |
| 192 |
N-320655-MA08-4 |
Concrete Panel Replacement for Residential Streets (MAO-Yr2) |
|
$7,395,116.67 |
() |
07-01-2015(a) |
|
|
|
Steven Loo |
Lynn Phipps |
|
|
Avery Neblett |
Gregory Hubbard |
| 193 |
N-320655-M008-4 |
Concrete Panel Replacement for Residential Streets (MAO) |
|
$7,395,116.67 |
() |
10-16-2014(a) |
|
|
|
Steven Loo |
Lynn Phipps |
|
Main Lane Industries |
Tellas Johnson |
Avery Neblett |
| 194 |
N-000660-0010-4 |
Neighborhood Traffic Management Program |
|
$523,065.00 |
10-13-2010(a) |
10-26-2010(a) |
|
|
|
Michael Ereti |
Maria Garcia |
|
Infrastructure Services, Inc. |
|
Maria Garcia |
| 195 |
R-000035-0027-4 |
Force Main Rehabilitation and Reconstruction for Old Katy and Cook Road Lift Stations |
488D,488H,529N,529S |
$0.00 |
() |
|
|
|
|
Mohammad Haider |
Maria George |
Lloyd, Smitha & Associates, LLC |
Pate Garver, L.P. |
|
|
| 196 |
S-000020-0098-4 |
Valve Assessment, Repair/Replace & Testing |
|
$12,000,000.00 |
() |
|
|
|
|
James Wilson |
Mariana Santiago |
AECOM Technical Services, Inc. |
Reytec Construction Resources, Inc. |
Raymond Hillis |
Mario Santiago |
| 197 |
R-000265-0106-4 |
Sagemont WWTP Improvements |
576Z |
$18,333,500.57 |
10-02-2024(a) |
10-22-2024(a) |
08-10-2026(s) |
08-28-2026(s) |
11-25-2026(s) |
Singarpal Sekhon |
Marilena Stoica |
Sowells Consulting Engineers |
RAVA Construction, LLC |
Jeremy Garcia |
Amir Jahromi |
| 198 |
R-000267-0172-4 |
Lift Station Renewal and Rehabilitation Green Dolphin, Sherwood Oaks, West Court, and MUD#175-1 Lift Stations |
456U,488F,449T,535L |
$14,305,716.00 |
09-30-2026(a) |
10-26-2026(a) |
04-28-2028(s) |
06-12-2028(s) |
09-06-2028(s) |
Singarpal Sekhon |
Marilena Stoica |
|
V&S Construction |
Mack Nosrat |
David Howard |
| 199 |
R-000265-155B-4 |
Kingwood Central and Forest Cove WWTP UV System Replacement |
|
$5,936,014.00 |
() |
07-22-2025(a) |
|
|
|
Farid Sadeghian |
Mariluz Padilla |
WJ International Environmental Services, Inc |
Industrial Texas Corporation |
Ali Khairandish |
Ricardo Ocampo |
| 200 |
R-000265-155A-4 |
Kingwood Central WWTP Filter and Barscreen Replacement |
337F |
$12,070,330.00 |
() |
07-24-2025(a) |
|
|
|
Farid Sadeghian |
Mariluz Padilla |
WJ International Environmental Services, Inc |
Industrial Texas Corporation |
Ali Khairandish |
Ricardo Ocampo |
| 201 |
S-000900-0145-4 |
42-inch Water Line from Clear Lake City Water Authority Water Plant No. 3 to League City Booster Pump Station (SETL Contract C) |
618T,618X,618Y,658C |
$19,514,067.00 |
11-05-2025(a) |
12-08-2025(a) |
04-02-2027(s) |
05-17-2027(s) |
08-11-2027(s) |
Panduranga Kuruva |
Martin Mathew |
Stantec Consulting Services, Inc. |
MC2 Civil, LLC |
James Bishop-stantec |
Trent Norman |
| 202 |
R-000266-0194-4 |
Sanitary Sewer Cleaning and Television Inspection in Support of Rehabilitation (4277-71) |
VAR |
$1,278,088.68 |
06-19-2013(a) |
01-22-2015(a) |
01-20-2017(s) |
07-20-2017(s) |
07-08-2020(s) |
David Tajadod |
Mary Bac |
|
Specialized Maintenance Services, Inc. |
|
|
| 203 |
R-000266-0180-4 |
Sanitary Sewer Cleaning and Television Inspection in Support of Rehabilitation (4277-57) |
|
$540,474.86 |
02-08-2012(a) |
06-14-2012(a) |
10-10-2014(s) |
12-12-2014(s) |
07-12-2017(s) |
David Tajadod |
Mary Bac |
|
EnviroWaste Services Group, Inc |
|
|
| 204 |
R-000266-0195-4 |
FY2013 - Sanitary Sewer Cleaning and Television Inspection (4277-72) |
VAR |
$1,304,343.48 |
06-19-2013(a) |
10-10-2013(a) |
10-09-2015(s) |
04-08-2016(s) |
01-13-2021(s) |
David Tajadod |
Mary Bac |
|
EnviroWaste Services Group, Inc |
|
|
| 205 |
R-002013-0044-4 |
Large Diameter Sanitary Sewer Inspection Using Robotic Technology (WW 4277-87) |
|
$1,466,575.00 |
02-04-2015(a) |
07-30-2015(a) |
07-28-2017(s) |
01-26-2018(s) |
01-30-2019(s) |
Ali (DO NOT USE) Khairandish |
Matt Bahena |
|
CleanServe, Inc. |
|
|
| 206 |
N-000806-0001-4 |
ALMEDA ROAD RECONSTRUCTION: MACGREGOR TO OST |
533J,533E,533F |
$12,289,366.80 |
04-26-2016(a) |
06-15-2016(a) |
01-24-2018(s) |
03-20-2018(a) |
07-14-2021(a) |
Addie Jackson |
Michelle Randon |
WSP USA Inc. |
SER Construction Partners, LLC. |
Ben Barajas |
Jesus Serrano Marrero |
| 207 |
M-410006-0001-4 |
Arlington Heights Area Drainage Improvements (Sub Project 1) |
576C,576G |
$18,298,142.23 |
03-06-2024(a) |
04-24-2024(a) |
03-25-2026(s) |
05-28-2026(a) |
02-08-2027(s) |
Yusherry Cang |
Miguel Rodriguez |
Sowells Consulting Engineers |
SER Construction Partners, LLC. |
Christopher Robinson |
Herbert Raftie - SENG |
| 208 |
R-000267-0130-4 |
Lift Station Renewal and Replacement - Bretshire No. 2, Ferguson Way, Bayfield, Hempstead No.1, and Highland Meadow Lift Stations. |
618N,455H,455A,616D,451J,412N |
$11,212,358.00 |
02-16-2022(a) |
04-11-2022(a) |
06-25-2025(s) |
01-15-2026(a) |
12-09-2026(s) |
Singarpal Sekhon |
Monyque Johnson |
Briones Consulting & Engineering LTD |
Industrial Texas Corporation |
Brian Johnson |
Harold McKinley |
| 209 |
M-420126-0137-4 |
FY2026 Local Drainage Program (LDP) Contract #1 |
|
$4,000,000.00 |
12-16-2025(a) |
01-12-2026(a) |
|
|
|
Lagnesh Varshney |
Morteza Mostafanejad |
|
C&A Construction, LLC |
Majid Pezeshki |
Joshua Davidson |
| 210 |
M-420126-0133-4 |
FY 2025 Local Drainage Program (LDP) Contract # 2 |
336E,336J,413W,450S,450W,450Z,451K,455Q,489G,490N,490P,490R,490U,490V,493Q,493X,494F,495B,531Q,531U,533B,573H |
$3,000,000.00 |
11-11-2025(a) |
02-24-2026(a) |
|
|
|
Lagnesh Varshney |
Morteza Mostafanejad |
|
C&A Construction, LLC |
Majid Pezeshki |
Shivraj Thosar |
| 211 |
R-000509-0027-4 |
69th st WWTP Pump Station, Digester and Thickener Blower Switchgears, Sub-Station and Starter Replacement |
494R |
$11,995,692.45 |
03-04-2014(a) |
03-04-2014(a) |
|
|
|
Jason Iken |
Nasser Oshkoohi |
|
C. F. McDonald Electric, Inc. |
|
Thaddeus Patterson |
| 212 |
R-000267-0175-4 |
Lift Station Rehabilitation and Reconstruction Design Consent Decree_CMAR - Emnora #2, Bretshire #1, Red Gully, Cherry Oak, Annunciation & SHadow Lakes Lift Stations |
449Q,454D,415Z,415P,411U,488Z |
$859,300.00 |
02-26-2025(a) |
03-07-2025(a) |
|
|
|
Mohammad Haider |
Nawaraj Panta |
|
Boyer, Inc. |
|
|
| 213 |
R-001000-0041-4 |
CAPACITY REMEDIAL MEASURES PLAN CIP PACKAGE CONSTRUCTION MANAGER AT RISK (CMAR) SERVICES |
|
$0.00 |
() |
|
|
|
|
Mohammad Haider |
Nawaraj Panta |
|
|
|
|
| 214 |
R-000298-0014-4 |
Almeda Sims WWTP Improvements |
572L |
$19,154,720.00 |
01-12-2022(a) |
02-14-2022(a) |
08-29-2024(s) |
08-31-2026(a) |
01-27-2027(s) |
Mohammad Haider |
Nupur Krishnan |
|
LEM Construction Co., Inc. |
Claudius Anyalebechi |
Joshua Davidson |
| 215 |
R-000267-0160-4 |
Lift Station Renewal and Replacement - MacGregor Way N. #3, Wheeler, Gilpin, West Orem, Quail View and Hillcroft Lift Stations |
534E,533D,576G,571S,610C,570R |
$13,484,593.80 |
11-03-2022(a) |
12-12-2022(a) |
07-16-2025(s) |
11-20-2026(s) |
03-17-2027(s) |
Mohammad Haider |
Nupur Krishnan |
|
T Construction L.L.C. |
Mack Nosrat |
David Howard |
| 216 |
R-000298-004A-4 |
Almeda Sims Wastewater Treatment Plant Sludge Tanks 110 and 120 Repair. |
|
$0.00 |
() |
|
|
|
|
Mohammad Haider |
Nupur Krishnan |
|
|
|
|
| 217 |
N-100025-0001-4 |
W. Fuqua Intersection and Sidewalk Improvements: City Limits to Chimney Rock |
570Z,571W |
$6,741,812.72 |
01-31-2024(a) |
04-01-2024(a) |
06-27-2025(s) |
11-17-2025(a) |
04-01-2026(s) |
Sudarshan Gouni |
Omar Rafey |
|
Grava LLC |
Claudius Anyalebechi |
Joshua Davidson |
| 218 |
N-210005-0001-4 |
Roseland Area Paving and Drainage Improvements |
493W |
$8,113,897.00 |
04-08-2026(a) |
05-18-2026(a) |
09-30-2027(s) |
11-05-2027(s) |
02-16-2028(s) |
Sudarshan Gouni |
Omar Rafey |
|
V&S Construction |
Brian Johnson |
Harold McKinley |
| 219 |
S-000035-0266-4 |
Watermain Replacement in Mandell Place, Montrose, Westmoreland, and Courtland Place Subdivisions |
492R,492V,493N,493S,493T |
$9,944,965.00 |
04-30-2025(a) |
07-14-2025(a) |
08-28-2026(s) |
|
|
Sudarshan Gouni |
Omar Rafey |
|
TEXKOTA ENTERPISES, LLC |
Mack Nosrat |
Sean Felton |
| 220 |
N-210001-0001-4 |
Houston Heights, John Brashear and Memorial Heights Drainage and Paving |
493E,492H,492M,493J |
$12,172,965.31 |
01-05-2022(a) |
|
11-02-2023(s) |
12-10-2024(a) |
05-15-2024(s) |
Sudarshan Gouni |
Omar Rafey |
ARKK Engineers, LLC |
Reytec Construction Resources, Inc. |
Bobby Vasek |
|
| 221 |
N-322017-0034-4 |
Citywide Work Orders for CDSF Project #13 |
|
$2,181,153.00 |
() |
02-10-2025(a) |
|
|
|
Andrew Kessinger |
Pareshkumar Bhatt |
|
Tikon Group Inc. |
Trevon Cooke |
Starlett Cunningham |
| 222 |
N-322017-0035-4 |
Citywide Work Orders for CDSF Project #14 |
|
$2,064,164.60 |
() |
03-03-2025(a) |
|
|
|
Andrew Kessinger |
Pareshkumar Bhatt |
|
DCE Construction, Inc. |
Trevon Cooke |
Albert Brown |
| 223 |
N-322017-0029-4 |
On-Call Neighborhood Traffic Management Program #6 |
|
$1,905,777.00 |
() |
07-05-2023(a) |
|
|
|
Andrew Kessinger |
Pareshkumar Bhatt |
|
D G Medina Construction, LLC |
Trevon Cooke |
Starlett Cunningham |
| 224 |
N-321040-0128-4 |
FY2025 Citywide Concrete Panel Replacement Project #2 |
|
$14,484,951.00 |
() |
02-10-2025(a) |
|
|
|
Patricia Campbell |
Patricia Jennings |
|
JFT Construction, Inc. |
Tony Childress |
Harsha Sankari |
| 225 |
N-321040-0021-4 |
FY2019 Roadway Rehabilitation Package #2 |
|
$7,000,000.00 |
() |
06-10-2020(a) |
|
03-23-2022(a) |
10-12-2022(a) |
Patricia Campbell |
Patricia Jennings |
|
Total Contracting Limited |
Patricia Jennings |
Patrick Piper |
| 226 |
N-321040-0057-4 |
Citywide Concrete Panel Replacement Project #1 |
|
$10,000,000.00 |
() |
07-05-2022(a) |
|
04-21-2025(a) |
12-03-2025(a) |
Patricia Campbell |
Patricia Jennings |
|
Tikon Group Inc. |
Patricia Jennings |
Alissa Hardy |
| 227 |
N-321040-0030-4 |
FY2021 Roadway Rehabilitation Package #4 |
|
$5,925,090.00 |
() |
10-13-2021(a) |
|
|
|
Esam Al Abassy |
Patricia Jennings |
|
ISI Contracting, Inc. |
Patricia Jennings |
Alissa Hardy |
| 228 |
N-321040-0063-4 |
FY2022 Citywide Concrete Panel Replacement Project #2 |
|
$7,000,000.00 |
06-23-2022(a) |
12-06-2022(a) |
|
01-01-2026(a) |
05-06-2026(a) |
Patricia Campbell |
Patricia Jennings |
Sowells Consulting Engineers |
Total Contracting Limited |
Patricia Jennings |
Alissa Hardy |
| 229 |
N-321040-0154-4 |
FY2025 Asphalt Overlay Project #3 |
|
$13,597,517.50 |
() |
12-08-2025(a) |
|
|
|
Patricia Campbell |
Patricia Jennings |
|
Texas Materials Group |
Tony Childress |
cleveland johnson |
| 230 |
N-310650-0082-4 |
Installation of Fiber Cable and Communications Equipment for the Houston Intelligent Transportation System |
|
$1,300,000.00 |
11-10-2015(a) |
01-18-2016(a) |
|
|
|
Michael Wahl |
Patrick Nguyen |
|
Florida Traffic Control Devices |
Patrick Nguyen |
Patrick Nguyen |
| 231 |
N-310650-0077-4 |
Arterial Travel Time System. |
|
$1,880,145.00 |
() |
01-23-2015(a) |
|
|
|
Michael Wahl |
Patrick Nguyen |
|
Pfeiffer & Son, LTD |
Teofilo Rebagay |
Patrick Nguyen |
| 232 |
S-001000-0057-4 |
Parking Expansion at 7027 Ardmore Maintenance Facility |
533P |
$1,078,460.00 |
05-13-2025(a) |
07-07-2025(a) |
11-13-2026(s) |
01-04-2027(s) |
04-07-2027(s) |
Tina Yao |
Quinn Pitt |
|
CFG Industries, LLC |
Mack Nosrat |
David Howard |
| 233 |
R-000035-0015-4 |
Wastewater Force Main Renewal/Replacement For Highland Meadow and Bay Area Lift Stations |
616D,617Y,617Z,657C |
$5,415,665.00 |
12-17-2024(a) |
01-08-2025(a) |
03-17-2026(s) |
09-30-2026(s) |
11-13-2026(s) |
Mohammad Haider |
Raghad Alhajj |
|
T Construction L.L.C. |
Claudius Anyalebechi |
Joshua Davidson |
| 234 |
R-000035-0026-4 |
Force Main Renewal/Replacement of Belle Park #3, Northbrook, and Woodway #2 Lift Stations |
616D,617Y,617Z,657C |
$2,208,795.00 |
08-14-2024(a) |
01-08-2025(a) |
04-01-2026(s) |
09-30-2026(s) |
12-14-2026(s) |
Mohammad Haider |
Raghad Alhajj |
|
T Construction L.L.C. |
Mack Nosrat |
David Howard |
| 235 |
R-000267-0169-4 |
Lift Station Renewal and Replacement - Bintliff, Gessner #1, Gessner #2, Park Ten #2, Willowbend, Farther Point |
530H,491F,491J |
$13,767,587.74 |
11-06-2024(a) |
12-09-2024(a) |
12-29-2026(s) |
02-25-2027(s) |
06-30-2027(s) |
Mohammad Haider |
Raghad Alhajj |
|
Servox, LLC |
Jeremy Garcia |
Brock Howard |
| 236 |
R-000536-034B-4 |
Flow diversion from Easthaven to Southeast WWTP - Package 3 Monroe & Swiftwater to Easthaven WWTP |
575Q,575L,575G |
$32,877,084.50 |
01-07-2026(a) |
02-05-2026(a) |
02-25-2028(s) |
03-27-2028(s) |
06-28-2028(s) |
Mohammad Haider |
Rajesh Danayak |
Plummer Associates, Inc. |
HB Trenchless |
Mike Kennedy |
Serena Blaylock |
| 237 |
R-000536-034A-4 |
Flow diversion from Easthaven to Southeast WWTP - Package 2 Fuqua & Blackhawk to Monroe & Swiftwater |
575Q,575U,575V |
$34,792,138.00 |
04-29-2025(a) |
05-29-2025(a) |
07-13-2027(s) |
08-16-2027(s) |
11-17-2027(s) |
Mohammad Haider |
Rajesh Danayak |
Plummer Associates, Inc. |
Boyer, Inc. |
Mike Kennedy |
Spencer Laney |
| 238 |
S-000700-0075-4 |
Work Order Construction Contract for Small Diameter Waterlines |
|
$2,800,000.00 |
07-24-2024(a) |
08-01-2024(a) |
|
|
|
Sudarshan Gouni |
Ratish Subedi |
|
T Construction L.L.C. |
Claudius Anyalebechi |
Joshua Davidson |
| 239 |
N-000670-0003-4 |
ILA - Harrisburg Overpass: at HBTRR Between Caylor St and 66th St. (Metro Solutions - East End Corridor Lite Rail System) |
494U |
$0.01 |
() |
04-01-2015(a) |
|
|
|
Thomas Artz |
Raymond Fong |
|
|
Julius Lovelady |
Diane Marsh |
| 240 |
N-T20020-0004-4 |
Social Services Corridor, Pedestrian Improvements Phase II (TIRZ-20) |
530H,531A,531E |
$0.01 |
() |
05-09-2016(a) |
|
|
|
Thomas Artz |
Raymond Fong |
|
|
Keith Phillips |
Rogelio Calong |
| 241 |
N-HC0100-0008-4 |
Beamer Road: Tall Ships to Bay Area Blvd |
617U,617Y,617Z |
$0.01 |
() |
06-10-2015(a) |
|
|
|
Thomas Artz |
Raymond Fong |
|
|
ADRIAN FLEITES |
Bruce May |
| 242 |
N-HC0100-0009-4 |
Beamer Road Phase II: Bay Area Blvd to FM 528 |
617Z,657D,658A |
$0.01 |
() |
06-15-2016(a) |
|
|
|
Thomas Artz |
Raymond Fong |
|
|
ADRIAN FLEITES |
Bruce May |
| 243 |
N-001317-0001-4 |
FM2234 (McHard Road)-FM521 TO FM3345 (Ft Bend Tollway)-TxDOT Project |
612E,611H,611G,611F,611E,612H,612G |
$0.01 |
() |
07-06-2015(a) |
|
|
|
Thomas Artz |
Raymond Fong |
|
|
Keith Phillips |
Richard White |
| 244 |
N-MD0450-0005-4 |
Median Improvements along Wilcrest Drive, from Westheimer Road to Olympia Drive |
529C,529D,530A |
$0.01 |
() |
07-19-2017(a) |
|
|
|
Thomas Artz |
Raymond Fong |
|
|
|
|
| 245 |
N-T19240-0001-4 |
Eastside Street Reconstruction-Westheimer to Levy Park |
493S,493W |
$0.01 |
() |
09-05-2017(a) |
|
|
|
Thomas Artz |
Raymond Fong |
|
Harper Brothers Construction, LLC |
Keith Phillips |
Bruce May |
| 246 |
N-T17000-0017-4 |
Town & Country West Drainage and Mobility Improvements (Town & Country Blvd; Town & Country Way) (TIRZ #17) |
489C,489D |
$0.01 |
() |
09-12-2017(a) |
|
|
|
Thomas Artz |
Raymond Fong |
|
|
Keith Phillips |
Keith Phillips |
| 247 |
N-MTA100-0001-4 |
Burnett Street Improvements (including Brooks, Keene and Trentham Place) (Metro) |
493H |
$0.01 |
() |
11-25-2014(a) |
|
|
|
Thomas Artz |
Raymond Fong |
|
|
Keith Phillips |
Diane Marsh |
| 248 |
N-140007-0001-4 |
Hillcroft Ave. South Bound @ Willow Waterhole Bayou-Discrete Segment 207 (HCFCD) |
571A |
$0.01 |
() |
12-14-2017(a) |
|
|
|
Thomas Artz |
Raymond Fong |
|
|
Keith Phillips |
Keith Phillips |
| 249 |
N-140001-0001-4 |
BRINSAP -Market Street Eastbound over Hunting Bayou |
496K |
$72,358.00 |
() |
|
|
|
|
Thomas Artz |
Raymond Fong |
|
|
Keith Phillips |
|
| 250 |
N-T02131-0001-4 |
Holman Street Pedestrian Enhancements: Spur 527 to Main St and Almeda Rd to Chenevert St. (TIRZ #2) |
493T,493U,493Y |
$0.01 |
() |
|
|
|
|
Thomas Artz |
Raymond Fong |
|
|
Julius Lovelady |
Keith Phillips |
| 251 |
N-TX0003-0003-4 |
HWY-3 Intersection Enhancements @ Shaver Rd. & Clear Lake City Blvd. (FM2351) (TXDOT) |
576L,617H |
$0.01 |
() |
|
|
|
|
Thomas Artz |
Raymond Fong |
|
Reytec Construction Co., Inc. |
Keith Phillips |
Bruce May |
| 252 |
N-TX0045-0006-4 |
IH-45: SP5 to US 59 Direct Connects |
493U,493V,493Z,494W |
$0.01 |
() |
|
|
|
|
Thomas Artz |
Raymond Fong |
|
|
Keith Phillips |
|
| 253 |
R-002011-100A-4 |
Pine Forest Sanitary Sewer Improvements |
491L |
$2,167,021.08 |
06-18-2025(a) |
08-18-2025(a) |
03-31-2026(s) |
06-18-2026(a) |
09-16-2026(s) |
Sudarshan Gouni |
Robert Miles |
|
JFT Construction, Inc. |
Jeremy Garcia |
Brock Howard |
| 254 |
R-000536-0019-4 |
Park Ten WWTP Abandonment and Flow Diversion to Turkey Creek WWTP |
447Y,488G |
$34,904,723.00 |
11-03-2021(a) |
01-10-2022(a) |
01-04-2027(s) |
01-04-2027(s) |
04-14-2027(s) |
Mohammad Haider |
Sabeen Shaikh |
|
Hartford |
Robert Toliver |
Mack Nosrat |
| 255 |
R-000267-128A-4 |
Construction of Westridge Regional Lift Station and Abandonment of Kirby No.1, Westridge and Main Street Lift Stations |
532K,532P,532Q |
$31,858,998.00 |
07-27-2022(a) |
09-26-2022(a) |
05-20-2025(s) |
07-03-2025(a) |
04-01-2026(a) |
Mohammad Haider |
Sabeen Shaikh |
Lloyd, Smitha & Associates, LLC |
Boyer, Inc. |
Edwin Lloyd-IsaEng |
Joshua Kwong |
| 256 |
R-000267-0121-4 |
Rehabilitation of John F. Kennedy (FN 113) Lift Station and Abandonment & Flow Diversion of John F. Kennedy #2 (FN 583) Lift Station |
374F |
$7,153,740.64 |
08-30-2023(a) |
10-10-2023(a) |
01-16-2025(s) |
11-25-2025(a) |
04-01-2026(a) |
Mohammad Haider |
Sabeen Shaikh |
|
Servox, LLC |
Jeremy Garcia |
Oluwaseun Ogunlala |
| 257 |
N-321039-001C-4 |
Roadway Pavement Replacement Project: Miles St: Market St. to Industrial Rd. |
497J,497N |
$2,142,050.75 |
05-01-2019(a) |
08-05-2019(a) |
11-17-2020(s) |
01-05-2021(a) |
09-20-2023(s) |
Sudarshan Gouni |
Sam Habibi |
|
ISI Contracting, Inc. |
Claudius Anyalebechi |
|
| 258 |
N-320610-0150-4 |
Sidewalk Program Work Order Contract (Pkg.2) |
|
$2,348,250.50 |
10-09-2024(a) |
01-06-2025(a) |
01-06-2026(s) |
02-20-2026(s) |
05-20-2026(s) |
Andrew Kessinger |
Sarah Garcia |
Sowells Consulting Engineers |
Tikon Group Inc. |
Julian Boddy |
Jeff Sydner |
| 259 |
N-320610-0152-4 |
Sidewalk Program Work Order Contract (Pkg.4) |
|
$2,438,811.00 |
() |
01-20-2025(a) |
|
|
|
Andrew Kessinger |
Sarah Garcia |
|
Tikon Group Inc. |
Julian Boddy |
Patrick Turner |
| 260 |
N-320610-0151-4 |
Sidewalk Program Work Order Contract (Pkg.3) |
|
$2,360,964.00 |
() |
03-17-2025(a) |
|
|
|
Andrew Kessinger |
Sarah Garcia |
Sowells Consulting Engineers |
R Miranda Trucking and Construciton LLC |
Laura Rocha |
Jeff Sydner |
| 261 |
R-002015-0035-4 |
New Front Easement Reconnections |
|
$2,643,753.10 |
() |
04-23-2026(a) |
|
|
|
Brian Campbell |
Sergei Patoka |
|
Reliance Construction Services, L.P. |
JOSEPH NUNEZ |
Glenn Chinnery |
| 262 |
R-002015-0034-4 |
New Front Easement Reconnections |
|
$2,568,865.38 |
() |
08-06-2025(a) |
|
|
|
Brian Campbell |
Sergei Patoka |
|
Reliance Construction Services, L.P. |
JOSEPH NUNEZ |
Glenn Chinnery |
| 263 |
R-000265-0147-4 |
IAH Wastewater Treatment Plant Expansion |
373M |
$93,874,941.00 |
() |
08-25-2026(a) |
02-10-2029(s) |
03-09-2029(s) |
10-10-2029(s) |
Singarpal Sekhon |
Shahidur Rahman |
Lloyd, Smitha & Associates, LLC |
Reytec Construction Resources, Inc. |
Jeremy Garcia |
Alejandro Carpy |
| 264 |
N-000420-0030-4 |
MKT/SP Rails to Trails |
452V,452Z,492D,493A |
$1.00 |
() |
|
|
|
|
Thomas Artz |
Shapoor Golshan |
|
|
|
|
| 265 |
N-321040-0150-4 |
FY2025 Asphalt Overlay Rehab Package #2 |
492H,493E |
$8,554,061.75 |
01-13-2026(a) |
03-20-2026(a) |
05-06-2026(s) |
05-18-2026(a) |
|
Summer Lindsay |
Shawn Brooks |
|
Grava LLC |
Tony Childress |
Roderick Fielder |
| 266 |
N-321040-0131-4 |
FY2025 Asphalt Overlay Rehab Package #1 |
|
$9,173,778.31 |
03-05-2025(a) |
04-15-2025(a) |
|
|
|
Summer Lindsay |
Shawn Brooks |
|
Grava LLC |
Tony Childress |
Majid Pezeshki-HVJ |
| 267 |
R-MA1000-0020-4 |
Sewer Stoppage Cleaning and Television Inspection XI |
|
$3,549,726.75 |
() |
02-12-2026(a) |
|
|
|
Brian Campbell |
Shondel Martin |
|
Equix Integrity Southeast, Inc. |
Juan Herrera |
Alfred Jones |
| 268 |
M-43M008-0005-4 |
FY2026 Ditch Maintenance Work Order Contract |
|
$1,000,000.00 |
() |
01-20-2026(a) |
|
|
|
Steven Loo |
Sonynora Points |
|
DL Glover Utilities, LLC |
Jose Barboza |
Jose Barboza |
| 269 |
N-321040-0107-4 |
Ashphalt Overlay Services |
|
$18,975,777.45 |
() |
05-02-2024(a) |
|
|
|
Steven Loo |
Sonynora Points |
|
Grava LLC |
Sonynora Points |
Jose Barboza |
| 270 |
N-43F852-0001-4 |
Houston Bikeway Work Order Project |
|
$1,685,995.54 |
10-06-2021(a) |
01-05-2022(a) |
11-09-2022(s) |
|
|
Colin Lupold |
Stephen Wright |
Omega Engineers, Inc. |
Tikon Group Inc. |
Stephen Wright |
Abrham Demessie |
| 271 |
M-43M009-0009-4 |
FY 2025 Ditch Re-establishment Work Order Contract # 1 |
|
$3,500,000.00 |
02-26-2025(a) |
04-01-2025(a) |
04-01-2027(s) |
05-16-2027(s) |
08-11-2027(s) |
Syed Nasir |
Stephen Wright |
|
DL Glover Utilities, LLC |
Majid Pezeshki |
Jeff Sydner |
| 272 |
M-43M009-0014-4 |
FY 2026 Ditch Re-establishment (DRE) Work Order Contract # 1 |
|
$8,000,000.00 |
12-17-2025(a) |
04-01-2026(a) |
03-01-2028(s) |
05-15-2028(s) |
08-09-2028(s) |
Syed Nasir |
Stephen Wright |
|
DL Glover Utilities, LLC |
Majid Pezeshki |
Sam Cadena |
| 273 |
M-43M009-0011-4 |
FY 2025 Ditch Re-Establishment Work Order Contract # 3 |
|
$6,000,000.00 |
05-21-2025(a) |
06-02-2025(a) |
06-02-2027(s) |
07-17-2027(s) |
10-13-2027(s) |
Syed Nasir |
Stephen Wright |
|
J Rivas Construction, LLC |
Stephen Wright |
Jeff Sydner |
| 274 |
M-43M009-0016-4 |
FY 2026 Ditch Re-establishment (DRE) Work OrderContract # 3 |
|
$9,000,000.00 |
() |
06-10-2026(a) |
|
|
|
Syed Nasir |
Stephen Wright |
|
Reliance Construction Services, L.P. |
Majid Pezeshki |
Joe Rodriguez |
| 275 |
M-43M009-0012-4 |
FY 2025 Ditch Re-Establishment Work Order Contract # 4 |
|
$6,000,000.00 |
11-05-2025(a) |
12-08-2025(a) |
|
|
|
Syed Nasir |
Stephen Wright |
|
DL Glover Utilities, LLC |
Stephen Wright |
Jamarcus Nickerson |
| 276 |
S-000700-0084-4 |
Work Order Construction Contract for Small Diameter Water Lines (WO 17) |
|
$4,375,000.00 |
03-17-2025(a) |
03-17-2025(a) |
03-17-2027(s) |
04-19-2027(s) |
10-20-2027(s) |
Sudarshan Gouni |
Tao Fang |
|
Reliance Construction Services, L.P. |
Claudius Anyalebechi |
Joshua Davidson |
| 277 |
S-000700-0101-4 |
Work Order Construction Contract for Small Diameter Water Lines |
|
$5,000,000.00 |
04-01-2026(a) |
06-08-2026(a) |
06-07-2028(s) |
07-07-2028(s) |
01-10-2029(s) |
Sudarshan Gouni |
Tao Fang |
|
Reliance Construction Services, L.P. |
Brian Johnson |
Dan Maines |
| 278 |
N-320655-MA20-4 |
Traffic & Drainage City Wide Concrete Panel Replacement |
|
$17,638,740.00 |
() |
05-10-2023(a) |
|
|
|
Bashar Naser |
Tellas Johnson |
Main Lane Industries |
Main Lane Industries |
Tellas Johnson |
Averion Barrett |
| 279 |
N-320655-MA19-4 |
Citywide Panel Replacement |
|
$5,819,873.00 |
() |
05-24-2021(a) |
|
|
|
Steven Loo |
Tellas Johnson |
ISI Contracting, Inc. |
ISI Contracting, Inc. |
Deanna Mann |
Anwar Olezene |
| 280 |
N-MAO100-0006-4 |
Sweeping Services in the Northwest and Northeast City Quadrants. |
|
$1,830,160.00 |
() |
05-24-2021(a) |
|
|
|
Bashar Naser |
Tellas Johnson |
Street Sweeping Services of Texas |
Street Sweeping Services of Texas |
Tellas Johnson |
Abdreas Moreno |
| 281 |
N-MAO100-0017-4 |
Agreement for Downtown Street Sweeping Services |
|
$999,528.80 |
() |
06-07-2026(a) |
|
|
|
Bashar Naser |
Tellas Johnson |
Mister Sweeper LP |
Mister Sweeper LP |
Tellas Johnson |
Ronald Broussard |
| 282 |
N-100MAO-0005-4 |
Downtown Street Sweeping Services |
|
$892,714.75 |
() |
07-27-2020(a) |
|
|
|
Steven Loo |
Tellas Johnson |
Mister Sweeper LP |
Mister Sweeper LP |
Tellas Johnson |
Abdreas Moreno |
| 283 |
N-MAO100-0007-4 |
Sweeping Services in the South Quadrants. |
|
$2,697,218.60 |
() |
09-09-2021(a) |
|
|
|
Bashar Naser |
Tellas Johnson |
Yes America Enterprises |
Yes America Enterprises |
Tellas Johnson |
Andre Mosley |
| 284 |
N-320655-MA16-4 |
Work Order Contract (A-M) for Concrete Panel Replacement (ISI) |
|
$24,158,300.00 |
() |
12-09-2016(a) |
|
|
|
Steven Loo |
Tellas Johnson |
|
ISI Contracting, Inc. |
Tellas Johnson |
Anwar Olezene |
| 285 |
N-320655-MA17-4 |
Work Order Contract (B-I) for Concrete Panel Replacement (Main Lane) |
|
$8,833,742.60 |
() |
12-09-2016(a) |
|
|
|
Steven Loo |
Tellas Johnson |
|
Main Lane Industries |
Tellas Johnson |
Anwar Olezene |
| 286 |
R-000265-0071-4 |
Solids Removal from Wastewater Facilities |
|
$623,455.00 |
() |
05-24-2010(a) |
|
|
|
Ali (DO NOT USE) Khairandish |
Tika Gautam |
|
|
|
|
| 287 |
R-000265-0073-4 |
Solids Removal from Wastewater Facilities |
|
$561,675.00 |
() |
07-01-2011(a) |
|
|
|
Ali (DO NOT USE) Khairandish |
Tika Gautam |
|
|
|
|
| 288 |
R-000265-0109-4 |
Wastewater Process Unit Cleaning and Evaluation |
|
$2,399,000.00 |
() |
07-15-2013(a) |
|
|
|
Ali (DO NOT USE) Khairandish |
Tika Gautam |
|
Industrial Texas Corporation |
|
|
| 289 |
R-000265-0110-4 |
Wastewater Process Unit Cleaning and Evaluation |
|
$8,239,081.00 |
() |
07-15-2013(a) |
|
|
|
Shannon Dunne |
Tika Gautam |
|
|
|
|
| 290 |
R-000265-0142-4 |
Wastewater Process Unit Cleaning and Evaluation |
|
$4,513,500.00 |
() |
07-20-2016(a) |
|
|
|
Shannon Dunne |
Tika Gautam |
|
Industrial Texas Corporation |
Charles Ebo |
|
| 291 |
R-000265-0143-4 |
Wastewater Process Unit Cleaning and Evaluation |
|
$8,264,250.00 |
() |
08-01-2016(a) |
|
|
|
Shannon Dunne |
Tika Gautam |
|
|
|
|
| 292 |
R-000265-0084-4 |
Solids Removal from Wastewater Facilities |
|
$2,494,900.00 |
() |
08-15-2011(a) |
|
|
|
Ali (DO NOT USE) Khairandish |
Tika Gautam |
|
|
|
|
| 293 |
R-000509-0039-4 |
69th Street WWTP Cleaning and Evaluation |
494R |
$4,856,410.00 |
() |
08-28-2017(a) |
|
|
|
Ali (DO NOT USE) Khairandish |
Tika Gautam |
|
Stantec Consulting Services, Inc. |
|
|
| 294 |
R-000267-0157-4 |
Lift Station Wet Well Cleaning and Evaluation |
|
$4,825,600.00 |
() |
11-24-2014(a) |
|
|
|
Shannon Dunne |
Tika Gautam |
|
Industrial Texas Corporation |
Charles Ebo |
|
| 295 |
N-322017-0036-4 |
Citywide Work Orders for Council District Service Fund (CDSF) Project #15 |
|
$3,000,000.00 |
() |
08-03-2026(a) |
|
|
|
Andrew Kessinger |
Trevon Cooke |
|
Total Contracting Limited |
Trevon Cooke |
Starlett Cunningham |
| 296 |
S-000019-EMSR-4 |
Emergency Water Project Salary Recovery |
|
$1.00 |
() |
|
|
|
|
Venus Price |
Venus Price |
|
|
|
|
| 297 |
R-002011-091A-4 |
Neighborhood Sewer Systems Improvements, Package 6 Area 5 |
491X |
$5,400,000.00 |
06-18-2025(a) |
08-11-2025(a) |
06-27-2026(s) |
08-31-2026(a) |
11-04-2026(s) |
Sudarshan Gouni |
Victor Amavi |
|
Pate Garver, L.P. |
Jeremy Garcia |
Alejandro Carpy |
| 298 |
R-000509-0049-4 |
69th St Wastewater Treatment Plant Standard Clarifier Mechanism Replacement |
494R |
$46,979,330.00 |
() |
04-20-2026(a) |
|
|
|
Farid Sadeghian |
Xiaohua Lin |
WJ International Environmental Services, Inc |
Boyer, Inc. |
Ali Khairandish |
Fabi Pulgar |
| 299 |
M-43M009-0015-4 |
FY 2026 Ditch Re-establishment Work Order Contract #2 |
|
$8,000,000.00 |
() |
05-11-2026(a) |
|
|
|
Lagnesh Varshney |
Yen Lam |
|
DL Glover Utilities, LLC |
Majid Pezeshki |
Jamarcus Nickerson |
| 300 |
M-43M009-0013-4 |
FY 2025 Ditch Re-Establishment Work Order Contract # 5 |
|
$6,000,000.00 |
11-19-2025(a) |
12-29-2025(a) |
|
|
|
Lagnesh Varshney |
Yen Lam |
|
DL Glover Utilities, LLC |
Yen Lam |
Sam Cadena |
| 301 |
R-000265-0152-4 |
Wastewater Process Unit Cleaning and Evaluation |
|
$5,411,350.00 |
() |
07-15-2021(a) |
|
|
|
Addie Jackson |
Yves Tshimanga |
|
Industrial Texas Corporation |
Abdoul Diallo |
|
| 302 |
S-000700-0103-4 |
Pipe Bursting Water Lines |
|
$0.00 |
() |
|
|
|
|
Khanh Kim |
Yves Tshimanga |
|
|
|
|
| 303 |
R-002015-0009-4 |
Work Order No. 3, Wastewater System/Substitute Service Support ¿ Braesmont Package 2. |
531T |
$587,000.00 |
() |
02-06-2017(a) |
|
|
|
Daniel Oefner |
|
|
Nerie Construction, LLC |
|
|
| 304 |
R-002015-0020-4 |
Wastewater System/Substitute Service Support ¿ Beverly, Fugate (Work Order No. 1) |
493A,453X,453Y |
$375,000.00 |
() |
02-06-2017(a) |
|
|
|
Daniel Oefner |
|
|
TEXAS PRIDE UTILITIES, LLC |
|
|
| 305 |
M-420126-0099-4 |
FY17 Local Drainage Project Work Order Design [Contract 3] |
|
$0.00 |
() |
|
|
|
|
Tanu Hiremath |
|
EJES Incorporated |
|
|
|
| 306 |
N-000650-0057-4 |
WiMAX Base Station Installation |
|
$1,100,000.00 |
() |
|
|
|
|
Michael Wahl |
|
|
|
|
|
| 307 |
N-000650-0062-4 |
West Houston Advance Traffic Management System |
|
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
| 308 |
N-000700-0001-4 |
Collingsworth Grade Separation at Proposed Hardy Toll Road |
453Z,454W |
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
| 309 |
N-140005-0001-4 |
ILA: Calhoun Bridge at Brays Bayou (TxDOT-BRINSAP) |
534E |
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
| 310 |
N-T02009-0001-4 |
Almeda and Crawford Reconstruction: Pierce to Alabama (TIRZ #2) |
493T |
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
| 311 |
N-T02010-0001-4 |
Webster Street Reconstruction: Hamilton to Main (TIRZ #2) |
493Q,493U |
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
| 312 |
N-T02140-0005-4 |
TIRZ-02 - Caroline Street near HCCS (Elgin to Holman) |
493T |
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
| 313 |
R-000019-0039-4 |
On-Call Engineering for Wastewater Utility Facilities Improvements |
NA |
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
| 314 |
R-000035-006B-4 |
Force main Renewal and Replacement for Bayfield, Bretshire, Forest Shores and Woodland Ridge Lift Stations |
617R,617H,617M,618J,618N,455A,455B,336C,336D,337B |
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
| 315 |
R-000266-0257-4 |
|
|
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
| 316 |
R-000266-0296-4 |
Sanitary Sewer Rehabilitation by Cured-in-Place Pipe Method |
|
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
| 317 |
R-000266-0297-4 |
Wastewater Collection System Rehabilitation and Renewal |
|
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
| 318 |
R-000266-0316-4 |
Sanitary Sewer Rehabilitation by Cured-in-Place Pipe Method |
|
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
| 319 |
R-000266-0332-4 |
Wastewater Collection System Rehabilitation and Renewal |
|
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
| 320 |
R-000266-0365-4 |
Sanitary Sewer Cleaning and Television Inspection in Support of Rehabilitation |
|
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
| 321 |
R-000267-0173-4 |
Braeswood N, Post Oak #2, Bissonnet #4, Brooklet, NE Sludge Transfer (Dorsett), and Synott Road #1 Lift Stations Renewal and Replacement Project |
532L,611C,530T,529Y,528L,495F |
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
| 322 |
R-002011-0100-4 |
Sanitary Sewer Improvements Engineering Service Package 1 |
|
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
| 323 |
R-002013-0049-4 |
|
|
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
| 324 |
R-002013-0050-4 |
|
|
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
| 325 |
R-002013-0051-4 |
Sanitary Sewer Rehabilitation by Cured-In-Place Pipe Method (LDS) |
|
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
| 326 |
R-002013-0054-4 |
Wastewater Collection System Rehabilitation and Renewal |
|
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
| 327 |
R-002013-0055-4 |
Wastewater Collection System Rehabilitation and Renewal |
|
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
| 328 |
R-002013-0059-4 |
Sanitary Sewer Rehabilitation by Cured-in-Place Pipe Method (LDS) |
|
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
| 329 |
R-002013-0060-4 |
Sanitary Sewer Rehabilitation by Cured-in-Place Pipe Method (LDS) |
|
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
| 330 |
R-002015-0024-4 |
|
|
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
| 331 |
S-000012-032A-4 |
Southeast Water Purification Plant (SEWPP) Improvements Package 1 |
577R |
$0.00 |
() |
|
|
|
|
Sonny Do |
|
|
|
|
|
| 332 |
S-000012-032A-4 |
Southeast Water Purification Plant (SEWPP) Improvements Package 1 |
577R |
$0.00 |
() |
|
|
|
|
Sonny Do |
|
|
|
|
|
| 333 |
S-000019-0025-4 |
TLCARP Program Management - Encompasses work not specifically associated with other CIPMS Projects |
000X |
$0.00 |
() |
|
|
|
|
Tom Fung |
|
|
|
|
|
| 334 |
S-000066-E011-4 |
Work Order #4 ¿ Process Evaluation, Facility Audit, Facility Re-rating Evaluation, Ultraviolet Disinfection Audit and Interim Expansion |
377W |
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
| 335 |
S-000521-0054-4 |
Imperial Valley from 750' N. of Harvest Time Lane to Rankin Road |
|
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
| 336 |
S-000XXX-XXX1-4 |
Setup Test |
|
$0.00 |
() |
|
|
|
|
|
|
|
|
|
|
|